EP2444869A1 - Method and apparatus for generalized performance evaluation of equipment using achievable performance derived from statistics and real-time data - Google Patents
Method and apparatus for generalized performance evaluation of equipment using achievable performance derived from statistics and real-time data Download PDFInfo
- Publication number
- EP2444869A1 EP2444869A1 EP11194847A EP11194847A EP2444869A1 EP 2444869 A1 EP2444869 A1 EP 2444869A1 EP 11194847 A EP11194847 A EP 11194847A EP 11194847 A EP11194847 A EP 11194847A EP 2444869 A1 EP2444869 A1 EP 2444869A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- performance parameter
- performance
- operating
- block
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 198
- 238000011156 evaluation Methods 0.000 title description 37
- 230000008569 process Effects 0.000 claims abstract description 111
- 230000008859 change Effects 0.000 claims abstract description 54
- 238000010521 absorption reaction Methods 0.000 claims description 132
- 238000009826 distribution Methods 0.000 claims description 69
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 30
- 238000012937 correction Methods 0.000 claims description 24
- 230000006870 function Effects 0.000 claims description 24
- 238000007619 statistical method Methods 0.000 claims description 12
- 239000004071 soot Substances 0.000 description 114
- 238000007664 blowing Methods 0.000 description 70
- 239000000446 fuel Substances 0.000 description 25
- 238000012544 monitoring process Methods 0.000 description 17
- 238000012163 sequencing technique Methods 0.000 description 17
- 238000012546 transfer Methods 0.000 description 15
- 239000003546 flue gas Substances 0.000 description 12
- 230000001276 controlling effect Effects 0.000 description 10
- 230000007423 decrease Effects 0.000 description 10
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 description 9
- 238000003070 Statistical process control Methods 0.000 description 8
- 230000009471 action Effects 0.000 description 7
- 238000004364 calculation method Methods 0.000 description 7
- 239000007789 gas Substances 0.000 description 7
- 238000013461 design Methods 0.000 description 6
- 238000005259 measurement Methods 0.000 description 6
- 238000013459 approach Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 3
- 230000003749 cleanliness Effects 0.000 description 3
- 239000003245 coal Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000013480 data collection Methods 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 239000012530 fluid Substances 0.000 description 2
- 239000003921 oil Substances 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000010795 Steam Flooding Methods 0.000 description 1
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 239000002956 ash Substances 0.000 description 1
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 239000011538 cleaning material Substances 0.000 description 1
- 238000002485 combustion reaction Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 238000010219 correlation analysis Methods 0.000 description 1
- 230000000875 corresponding effect Effects 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 230000002939 deleterious effect Effects 0.000 description 1
- 230000003831 deregulation Effects 0.000 description 1
- 230000004907 flux Effects 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000010921 in-depth analysis Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012806 monitoring device Methods 0.000 description 1
- 238000003062 neural network model Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 239000001301 oxygen Substances 0.000 description 1
- 229910052760 oxygen Inorganic materials 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 229920006395 saturated elastomer Polymers 0.000 description 1
- 238000010206 sensitivity analysis Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000002123 temporal effect Effects 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
- 238000010977 unit operation Methods 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23N—REGULATING OR CONTROLLING COMBUSTION
- F23N5/00—Systems for controlling combustion
- F23N5/24—Preventing development of abnormal or undesired conditions, i.e. safety arrangements
- F23N5/242—Preventing development of abnormal or undesired conditions, i.e. safety arrangements using electronic means
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23N—REGULATING OR CONTROLLING COMBUSTION
- F23N5/00—Systems for controlling combustion
- F23N5/26—Details
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0208—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
- G05B23/021—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system adopting a different treatment of each operating region or a different mode of the monitored system, e.g. transient modes; different operating configurations of monitored system
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0218—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
- G05B23/0224—Process history based detection method, e.g. whereby history implies the availability of large amounts of data
- G05B23/024—Quantitative history assessment, e.g. mathematical relationships between available data; Functions therefor; Principal component analysis [PCA]; Partial least square [PLS]; Statistical classifiers, e.g. Bayesian networks, linear regression or correlation analysis; Neural networks
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
- G05B23/0286—Modifications to the monitored process, e.g. stopping operation or adapting control
- G05B23/0294—Optimizing process, e.g. process efficiency, product quality
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/34—Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23N—REGULATING OR CONTROLLING COMBUSTION
- F23N2223/00—Signal processing; Details thereof
- F23N2223/44—Optimum control
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23N—REGULATING OR CONTROLLING COMBUSTION
- F23N2225/00—Measuring
- F23N2225/22—Measuring heat losses
- F23N2225/24—Measuring heat losses indicated in an amount of money
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23N—REGULATING OR CONTROLLING COMBUSTION
- F23N2237/00—Controlling
- F23N2237/10—High or low fire
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Definitions
- This patent relates generally to computer software, and more particularly to computer software used in monitoring and controlling the performance of thermodynamic devices and processes.
- Digital automatic control systems have made constant control of performance parameters possible by assigning all parameters (and losses) on-line and permitting direct operator supervision.
- the increased quality of measurement devices and tools has reduced the role of periodic heat rate testing and warranty measurements.
- the high quality of DCS automated control connected with the increasingly common application of optimization systems e.g., supervisory substitution or added bias signals to the operator actions during normal unit operation
- the principle role of performance monitoring should be modified to compare actual performance to the best achievable performance for a device or process rather than the predicted performance based on the manufacturer design values, and to detect possible losses of running the in market-based generation dispatch. This change would be more meaningful and understandable to plant operations and engineering personnel.
- the typical methodology of performance control is presented in numerous conference materials and textbooks.
- the method is based on calculating the unit chemical energy usage rate, also known as unit heat rate (based on ASME Power Test Codes), and assigning the measured losses and deviations of the heat rate from the expected value (nominal, or resulting from the last warranty measurements) based on operation of the device at other than nominal conditions.
- the basic parameters that influence the unit heat rate and that may be taken into consideration include the main steam pressure, main steam temperature, pressure decrease in the super-heater, reheat steam temperature, condenser pressure, feed-water temperature, oxygen content in flue gas and stack gas temperature.
- the number of controlled parameters has been expanded many times, but does not change the primary theoretical basis of this method.
- the heat rate deviation (BTU/kWh) is usually calculated to a value of $/Hr for a more approachable and meaningful presentation of data.
- Systems based on ASME or similar methodologies were introduced in practically all power plants, with modernization of automatic control systems usually developed into on-line systems performing all the calculations every several minutes and presenting the results on operators' screens at the Distributed Control System (DCS) or auxiliary computer displays.
- DCS Distributed Control System
- the performance calculation methodology is necessary and effective when properly implemented, but also has a set of drawbacks. It is apparent after many years, and many computing platform revisions to calculate results, it may be possible to evaluate the results more critically and to attempt a more in depth analysis.
- Some of the problems with applying the contemporary performance control techniques relate to the reference values and correction curves used in the control method. Presently, most deviations and losses are calculated and monitored in reference to the so-called reference values. Usually these are the nominal values given by the original equipment manufacturer (OEM). However, for devices with a 15-40 year life cycles and with equipment that has been modernized and rebuilt at least several times, these nominal values do not constitute a real reflection of the actual operating parameters of the device in its present configuration.
- thermodynamic devices or processes are in fuel burning boilers where soot blowing is performed to adjust the efficiency of heat transfer within the boilers.
- fuel burning boilers typically for converting chemical energy into thermal energy by burning one of various types of fuels, such as coal, gas, oil, waste material, etc.
- An exemplary use of fuel burning boilers is in thermal power generators, wherein fuel burning boilers are used to generate steam from water traveling through a number of pipes and tubes in the boiler and the steam is then used to generate electricity in one or more turbines.
- the output of a thermal power generator is a function of the amount of heat generated in a boiler, wherein the amount of heat is determined by the amount of fuel that can be burned per hour, etc. Additionally, the output of the thermal power generator may also be dependent upon the heat transfer efficiency of the boiler used to burn the fuel.
- soot soot, slag, ash and other deposits
- soot soot
- slag slag
- ash slag
- ash slag
- other deposits generally referred to as "soot"
- soot soot, slag, ash and other deposits
- the soot deposited in the boiler has various deleterious effects on the rate of heat transferred from the boiler to the water, and thus on the efficiency of any system using such boilers. It is necessary to address the problem of soot in fuel burning boilers that burn coal, oil, and other such fuels that generate soot in order to maintain a desired efficiency within the boiler. While not all fuel burning boilers generate soot, for the remainder of this patent, the term "fuel burning boilers" is used to refer to those boilers that generate soot.
- soot blowers to remove soot encrustations accumulated on boiler surfaces through the creation of mechanical and thermal shock.
- Another approach is to use various types of soot blowers to spray cleaning materials through nozzles, which are located on the gas side of the boiler walls and/or on other heat exchange surfaces, where such soot blowers use any of the various media such as saturated steam, superheated steam, compressed air, water, etc., for removing soot from the boilers.
- Soot blowing affects the efficiency and the expense of operating a fuel burning boiler. For example, if inadequate soot blowing is applied in a boiler, it results in excessive soot deposits on the surfaces of various steam carrying pipes and therefore in lower heat transfer rates. In some cases, inadequate soot blowing may result in "permanent fouling" within fuel burning boilers, meaning that soot deposits in the boiler are so excessive that such deposits cannot be removed by any additional soot blowing. In such a case, forced outage of the boiler operation may be required to fix the problem of excessive soot deposits, and boiler maintenance personnel may have to manually remove the soot deposits using hammers and chisels. Such forced outages are not only expensive, but also disruptive for the systems using such fuel burning boilers.
- soot blowing in utility boilers has been mostly an ad hoc practice, generally relying on a boiler operator's judgment. Such an ad hoc approach produces very inconsistent results. Therefore, it is important to manage the process of soot blowing more effectively and in a manner so that the efficiency of boiler operations is maximized and the cost associated with the soot blowing operations is minimized.
- One popular method used for determining cleanliness of a boiler section and to control soot blowing operations is a first principle based method, which requires measurements of flue gas temperature and steam temperature at the boiler section inlets and outlets.
- the flue gas temperatures are often backward calculated at multiple points along the path of the flue gas, starting from the flue gas temperatures measured at an air heater outlet.
- This method is quite sensitive to disturbances and variations in air heater outlet flue gas temperatures, often resulting in incorrect results.
- this method is a steady state method, and therefore does not work well in transient processes generally encountered in various boiler sections.
- Another popular method used for determining cleanliness of a boiler section of a fuel burning boiler and to control soot blowing operations in a fuel burning boiler is an empirical model based method, which relies on an empirical model such as a neural network model, a polynomial fit model, etc.
- the empirical model based method generally requires a large quantity of empirical data related to a number of parameters, such as the fuel flow rate, the air flow rate, the air temperature, the water/steam temperature, the burner tilt, etc. Unfortunately the large amount of data makes the data collection process tedious and prone to high amount of errors in data collection.
- the model may also be similar to the performance monitoring method discussed above and using reference values and correction curves among other information from the manufacturer. As discussed above, this method evaluates the performance based on the manufacturer's design instead of the optimum achievable performance of the soot blowing operation under the current operating conditions.
- Fig. 1 illustrates a flowchart of an exemplary achievable performance evaluation routine
- Fig. 2 illustrates an exemplary data distribution curve for a thermodynamic parameter of a monitored device or process
- Fig. 3 illustrates a flowchart of a generalized performance evaluation routine
- Fig. 4 illustrates a block diagram of a boiler steam cycle for a typical boiler
- Fig. 5 illustrates a schematic diagram of an exemplary boiler section using a plurality of soot blowers
- Fig. 6 illustrates a flowchart of an exemplary heat absorption statistics calculation program
- Fig. 7A illustrates a flowchart of a soot blowing statistical process control program
- Fig. 7B illustrates a plurality of heat absorption data distribution curves
- Fig. 8 illustrates a flowchart of a permanent slagging detection program
- Fig. 9 illustrates a plurality of heat absorption distribution curves illustrating permanent slagging.
- the piece of equipment or the process may be in need of service.
- the maximum allowable or tolerable deviation may be determined from operation experience or from a sensitivity analysis of the data. Operations personnel and engineering can be notified of the deviation from the achievable operating range and take the necessary corrective actions.
- the control system may be configured to automatically take corrective actions where possible or, at a minimum, to suggest corrective actions to the operations personnel and engineers.
- thermodynamic process may refer generally to a thermodynamic process occurring within a single device, such as a soot blower, a heat exchanger, a pump, a turbine and the like, or a thermodynamic process involving multiple thermodynamic devices and steps, such as heat exchange sections and other subsystems with power plants, automobile engines, and the like wherein both the achievable performance and the actual performance of the device(s) and process(es) may be determined.
- a soot blower a heat exchanger, a pump, a turbine and the like
- thermodynamic process involving multiple thermodynamic devices and steps such as heat exchange sections and other subsystems with power plants, automobile engines, and the like wherein both the achievable performance and the actual performance of the device(s) and process(es) may be determined.
- the discussion below illustrates one application wherein this generalized approach could be applied to soot blowing within a heat exchange section. Another example where this generalized approach can be applied is in the calculation of power plant controllable losses.
- Fig. 1 contains a generalized flowchart of the steps of an achievable performance evaluation routine 20 used to derive accurate correction functions for individual parameters (main steam temperature and pressure, exhaust gas temperature and pressure, fluid flow rates and the like) of a thermodynamic device or process based on the present day operating conditions of the equipment.
- the achievable performance evaluation routine 20 may be implemented as software, hardware, firmware or as any combination thereof. When implemented as software, the achievable performance evaluation routine 20 may be stored on a read only memory (ROM), a random access memory (RAM) or any other memory device used by a computer used to implement the achievable performance evaluation routine 20.
- the achievable performance evaluation routine 20 may be used to calculate and evaluate statistics of only a device or portion of a thermodynamic process or, alternatively, may be used to calculate and evaluate statistics of the entire process.
- routine 20 is executed after the equipment is overhauled or other maintenance has performed, after equipment is replaced, or at any other time at which the devices or processes are contemplated to perform at the maximum achievable performance levels.
- routine 20 may be executed after a boiler section is taken out of service to have permanent deposits of soot removed, or after an engine is rebuilt.
- the evaluation may be performed during a separate testing period before the devices or processes are placed back into normal service, or the evaluation may be performed at the time the devices or processes are placed back into service for the duration of time necessary to collect the necessary data to perform the evaluation.
- the achievable performance evaluation routine 20 may begin at a block 22 where real time operating data is collected for each controllable loss parameter for the thermodynamic process. Because the devices or processes typically operate at different load levels at various times during normal operations, the devices or processes may be operated over the anticipated load levels to ensure that data is collected for all load ranges at which the devices or processes may operate. As data is collected, a block 24 calculates the individual performance parameters that are relevant for evaluating and controlling the performance of the devices and/or the process. In some instances, relevant parameters may be directly measurable by the available monitoring devices (e.g., temperatures, pressures and flow rates).
- the parameters are the results of calculations that must be performed due to the nature of the parameter, such as the heat absorption within a boiler section, or to the inability to accurately monitor the value of an otherwise measurable parameter.
- the operating data is collected until there is a sufficient amount of data for each load range to perform the necessary evaluation of the achievable performance of the device or process.
- a user may have specified a number of observations that must be collected over range of loads, or may have specified a time period that must elapse to ensure that sufficient data is collected for the process. If insufficient data has been collected at a block 26, control passes back to the block 22 for the collection of additional operating data.
- control may pass to a block 28 to perform statistical analysis of the operating data. For example, for each relevant performance parameter, the block 28 may calculate the mean value, the median value, standard deviation, variance, skewness and other statistical values at the various operating loads. The observed operating data also provide distribution curves for the process parameters at the achievable operating conditions. After sufficient operating data is collected, control may also pass to a block 30 to derive correction functions that may be substituted for the manufacturer-supplied correction curves or the most recently derived correction functions from the previous execution of the achievable performance evaluation routine 20.
- the correction functions may be derived by applying statistical analysis techniques to the operating data to determine degrees of correlation between the performance parameters and the overall performance of the monitored device or process.
- One example of such a statistical analysis is provided in co-pending U.S. Pat. Appl. No. 11/__,__,filed on March 12, 2008, by Cheng et al., entitled "Use of Statistical Analysis in Power Plant Performance Monitoring,” which is expressly incorporated by reference herein.
- control may pass to a block 32 to determine the achievable performance for the device or process and the appropriate performance parameters to be used for monitoring, evaluating and controlling the real time performance of the device or process versus the achievable performance.
- the achievable performance measure may be the performance parameter the value of which most closely correlates to the achievable performance of the device or process.
- the calculated heat absorption as the steam passes through the boiler section may provide the most accurate indication of the performance of the section.
- the exhaust gas temperature or pressure may be the appropriate performance parameter to measure.
- the operational data and statistical analysis are used to determine the best achievable operating range for the parameters for each load range of the plant.
- Fig. 2 illustrates an exemplary distribution curve 40 of observations for a performance parameter for a monitored device or process for a given load.
- the observations are distributed about a mean value 42 of the performance parameter, and the device or process may be operating at the achievable level of performance at the load when the performance parameter has a value between a lower limit 44 and an upper limit 46 assuming other correlated performance parameters are also operating within their corresponding limits.
- control passes to a block 34 where the information is provided as feedback to operations or other monitoring personnel or systems for use in ensuring that the device or process is operating within the desired and/or achievable operating range.
- the heat rate correction function that should be applied to the parameter(s) is derived. Once the correction function is derived, the controllable loss for the parameter in $/HR can be calculated as discussed above. The correction factor will now be determined by the actual device or process data rather than the manufacturer design data.
- the performance of a device or process may be monitored and evaluated based on the achievable performance of the particular device or process being monitored instead of an ideal and potentially unattainable theoretical level of performance. Over time, the actual performance of the device or process may shift from the achievable curve 40 shown in Fig. 2 . When the actual performance is sufficiently divergent from the achievable performance, the performance parameter(s) should be adjusted, if possible, to improve the performance of device or process to meet the achievable performance or to match that level of performance as closely as possible.
- Fig. 3 contains a generalized flowchart of an actual performance evaluation routine 50 that may be used to evaluate the performance of the thermodynamic device or process and provide feedback to operations personnel or to any other persons or systems monitoring and controlling the device or process.
- the performance evaluation routine 50 may be implemented as software, hardware, firmware or as any combination thereof.
- the performance evaluation routine 50 may be stored on a ROM, a RAM or any other memory device used by a computer used to implement the performance evaluation routine 50.
- the performance evaluation routine 50 may be used to calculate and evaluate statistics of only a device or portion of a thermodynamic process or, alternatively, may be used to calculate and evaluate statistics of the entire process.
- a block 52 initiates the evaluation of the device or process by collecting real time data for the current operational state of the monitored device or process.
- the collected operational data may be similar to the operational data collected are the block 22 of the achievable performance evaluation routine 20 for performance parameters that may be directly measured or for performance parameters that may be derived from measurable data.
- the routines 20 and 50 may be executed concurrently at a time when the device or process is expected to operate at the achievable performance level, or may be combined in a single routine that is configured to perform the achievable performance evaluation during normal operations when the performance of the device or process at times when the optimal performance should be achieved.
- a block 54 calculates and stores performance parameter(s) used to compare the current performance the achievable performance in a similar manner as the block 24.
- a block 56 evaluates the amount of operational data collected and stored by the blocks 52, 54. For example, a user may have specified the number of observations that must be collected by the performance evaluation routine 50, in which case the block 56 compares the collected data with such a specification provided by the user. If the block 56 determines that more data is necessary, control passes back to the block 52.
- a block 58 calculates a plurality of statistical data for the performance parameter(s) of the monitored device or process. For example, the block 58 may calculate a mean value, a median value, variance, standard deviation, skewness, and other statistical values that may be relevant to evaluating the real time performance of the device or process.
- a block 60 evaluates the statistical data calculated by the block 58.
- the block 60 may evaluate the statistical data for the performance parameters against a number of measures provided by a user of the performance evaluation routine 50 or against a number of industry averages that may be relevant to the real time operation of the device or process.
- the block 60 may be provided with a target lower control limit and a target upper control limit against which the distribution of a performance parameter is evaluated.
- the performance evaluation routine 50 may calculate the target lower control limit and the target upper control limit using the statistical data calculated by the achievable performance evaluation routine 20 for the performance parameter.
- an implementation of the performance evaluation program 50 may determine a target lower control limit and the target upper control limit using the achievable mean and the achievable standard deviation for the performance parameter.
- a block 62 determines if it is necessary to change the current operation of the device or process. For example, the block 62 may determine that it is necessary to change one or more of the setpoints for measurable parameters to move the distribution of the performance parameter toward the achievable distribution of curve 40.
- the particular adjustment or parameter that may be adjusted may be determined based on the manner in which the actual distribution varies from the achievable distribution. For example, it may be necessary to increase or decrease the value of one parameter, or to take the device or process out of service and perform maintenance, where the real time distribution curve is shifted to the left or right from the achievable curve 40, but a different parameter or parameters may be adjusted where the real time distribution curve is broader or narrower than the achievable distribution curve 40.
- a block 64 may calculate a change to be applied to any of the various parameters of the device or process, or provide feedback to the operator to assist in determining the necessary corrective action.
- the block 64 may use various statistics calculated by the block 58 to determine the change to be applied to the operating parameters.
- a knowledge base may be developed that provides solutions or guidance to the operator as to the most likely cause or causes of the degradation in performance and the available corrective actions that may be taken.
- the guidance may include indications of whether certain corrective actions are within the permissible operational limits established by the achievable correction curves derived by the achievable performance evaluation routine 20.
- the block 62 may also determine that the device or process is working effectively, and that it is not necessary to change the current operation, in which case the control may transfer to the block 52 for continuous monitoring of the device or process without any changes.
- a statistical process control system employs a consistent soot blowing operation for a heat exchange section of, for example, a fuel burning boiler, collects heat absorption data for the heat exchange section and analyzes the distribution of the heat absorption data as well as various parameters of the heat absorption distribution to readjust the soot blowing operation.
- the statistical process control system may set a desired lower heat absorption limit and a desired upper heat absorption limit and compare them, respectively, with an actual lower heat absorption limit and an actual upper heat absorption limit to determine the readjustment to be made to the soot blowing practice.
- the statistical process control system described herein is more reliable than the first principle based method and the empirical model based method, and is simple to implement as the statistical process control system requires only heat absorption data for implementation. Moreover, because the statistical process control system described herein uses heat absorption data, it is independent of, and not generally effected by disturbances and noise in flue gas temperatures, thus providing more uniform control over operation of soot blowers and cleanliness of heat exchange sections.
- an implementation of the statistical process control system measures heat absorption at various points over time to determine differences in heat absorption before and after a soot blowing operation, and calculates various statistical process control measurements based on such heat absorption statistics to determine the effectiveness of the soot blowing operation.
- the statistical process control system establishes a consistent soot blowing operation for the heat exchange section of a boiler or other machines and reduces the amount of data necessary for controlling the operation of the soot blowers.
- Fig. 4 illustrates a block diagram of a boiler steam cycle for a typical boiler 100 that may be used, for example, by a thermal power plant.
- the boiler 100 may include various sections through which steam or water flows in various forms such as superheated steam, reheat steam, etc. While the boiler 100 illustrated in Fig. 4 has various boiler sections situated horizontally, in an actual implementation, one or more of these sections may be positioned vertically, especially because flue gases heating the steam in various boiler sections, such as a water wall absorption section, rise vertically.
- the boiler 100 includes a water wall absorption section 102, a primary superheat absorption section 104, a superheat absorption section 106 and a reheat section 108. Additionally, the boiler 100 may also include one or more de-superheaters 110 and 112 and an economizer section 114. The main steam generated by the boiler 100 is used to drive a high pressure (HP) turbine 116 and the hot reheat steam coming from the reheat section 108 is used to drive an intermediate pressure (IP) turbine 118. Typically, the boiler 100 may also be used to drive a low pressure (LP) turbine, which is not shown in Fig. 4 .
- HP high pressure
- IP intermediate pressure
- LP low pressure
- the water wall absorption section 102 which is primarily responsible for generating steam, includes a number of pipes through which steam enters a drum.
- the feed water coming into the water wall absorption section 102 may be pumped through the economizer section 114.
- the feed water absorbs a large amount of heat when in the water wall absorption section 102.
- the water wall absorption section 102 has a steam drum, which contains both water and steam, and the water level in the drum has to be carefully controlled.
- the steam collected at the top of the steam drum is fed to the primary superheat absorption section 104, and then to the superheat absorption section 106, which together raise the steam temperature to very high levels.
- the main steam output from the superheat absorption section 106 drives the high pressure turbine 116 to generate electricity.
- the steam is routed to the reheat absorption section 108, and the hot reheat steam output from the reheat absorption section 108 is used to drive the IP turbine 118.
- the de-superheaters 110 and 112 may be used to control the final steam temperature to be at desired set-points.
- the steam from the IP turbine 118 may be fed through an LP turbine (not shown here) to a steam condenser (not shown here), where the steam is condensed to a liquid form, and the cycle begins again with various boiler feed pumps pumping the feed water for the next cycle.
- the economizer section 114 that is located in the flow of hot exhaust gases exiting from the boiler uses the hot gases to transfer additional heat to the feed water before the feed water enters the water wall absorption section 102.
- Fig. 5 is a schematic diagram of a boiler section 200 having a heat exchanger 202 located in the path of flue gas from the boiler 100.
- the boiler section 200 may be part of any of the various heat exchange sections described above, such as the primary superheat absorption section 104, the reheat absorption section 108, etc.
- One of ordinary skill in the art would appreciate that, while the present example of the boiler section 200 may be located in a specific part of the boiler 100, the soot blower control method illustrated in this patent can be applied to any section of the boiler where heat exchange and soot build-up may occur.
- the heat exchanger 202 includes a number of tubes 204 for carrying steam which is mixed together with spray water in a mixer 206.
- the heat exchanger 202 may convert the mixture of the water and steam to superheated steam.
- the flue gases input to the reheat section 200 are shown schematically by the arrows 209, and the flue gases leaving the boiler section 200 are shown schematically by the arrows 211.
- the boiler section 200 is shown to include six soot blowers 208, 210, 212, 214, 216 and 218, for removal of soot from the external surface of the heat exchanger 202.
- the operation of the soot blowers 208, 210, 212, 214, 216 and 218 may be controlled by an operator via a computer 250.
- the computer 250 may be designed to store one or more computer programs on a memory 252, which may be in the form of random access memory (RAM), read-only memory (ROM), etc., wherein such a program may be adapted to be processed on a central processing unit (CPU) 254 of the computer 250.
- a user may communicate with the computer 250 via an input/output controller 256.
- Each of the various components of the computer 250 may communicate with each other via an internal bus 258, which may also be used to communicate with an external bus 260.
- the computer 250 may communicate with each of the various soot blowers 208, 210, 212, 214, 216 and 218 using the external communication bus 260.
- the soot blowers 208-218 may be operated according to a particular soot blowing sequence, specifying the order in which each of the soot blowers 208-218 is to be turned on, the frequency of operation of the soot blowers 208-218, the length of time each soot blower is on, etc. While a given section of a fuel burning boiler may have a number of different heat exchange sections, the supply of steam and water that may be used for soot blowing operations is limited. Therefore, each heat exchange section is assigned a priority level according to which the soot blowers of that heat exchange section are operated.
- Soot blowers in a heat exchange section with a higher priority will receive needed water and steam to operate fully and the soot blowers in heat exchange sections with lower priorities will operate only when the needed water and steam are available.
- the priority level of a particular heat exchange section may be changed according to a program implemented for controlling the soot blowers of that particular heat exchange section.
- Fig. 6 illustrates a flowchart of a heat absorption statistics calculation program 300 that may be used to calculate heat absorption statistics in any of the various sections of the boiler 100, such as the boiler section 200.
- the heat absorption statistics calculation program 300 may be implemented as software, hardware, firmware or as any combination thereof. When implemented as software, the heat absorption statistics calculation program 300 may be stored on a read only memory (ROM), a random access memory (RAM) or any other memory device used by a computer used to implement the soot blowing process control program 300.
- the heat absorption statistics calculation program 300 may be used to calculate heat absorption statistics of only one section of the boiler 100 or, alternatively, may be used to calculate heat absorption statistics of all the heat exchange sections in the boiler 100.
- a block 302 initiates the calculation of heat absorption statistics by establishing an initial sequence of operation (current operational sequencing).
- current operational sequencing may be characterized by various parameters defining a timeline for operating each of the plurality of soot blowers within a boiler section, such as the boiler section 200.
- an implementation of the heat absorption statistics calculation program 300 may specify the frequency at which the soot blower 208 is turned on, the length of time for which the soot blower 208 is kept on, and the length of time for which the soot blower 208 is turned off between two consecutive on time periods.
- the block 302 also collects and stores various data related to the steam flowing through the boiler section 200.
- the block 302 may collect the temperature and pressure of the steam entering the boiler section 200 and may calculate the entering enthalpy of the boiler section 200 (enthalpy is the heat energy content of a fluid, which has a unit of Btu/lb) denoted by Hi, the temperature and pressure of the steam exiting from the boiler section 200, the exiting enthalpy of the boiler section 200, denoted by Ho, the rate of flow of steam into the boiler section 200, denoted by F lbs/Hr, etc.
- enthalpy is the heat energy content of a fluid, which has a unit of Btu/lb
- Hi the temperature and pressure of the steam exiting from the boiler section 200
- Ho the exiting enthalpy of the boiler section 200
- F lbs/Hr the rate of flow of steam into the boiler section 200
- a block 304 calculates and stores the heat absorption within the boiler section 200, using the data collected by the block 302.
- the heat absorption Q may be measured directly using a heat flux sensor.
- a block 306 of Fig. 6 evaluates the amount of heat absorption data collected and stored by the block 304. For example, a user may have specified the number of observations that must be collected by the soot blowing process control program, in which case the block 306 compares the collected data with such a specification provided by the user. If the block 306 determines that more data is necessary, control passes back to the block 302.
- a block 308 determines if the collected data adheres to a normal distribution.
- a user may provide the confidence level at which the heat absorption statistics calculation program 300 needs to determine whether the heat absorption data is normally distributed or not. For example, a user may specify that the heat absorption data must be normally distributed at a ninety-five percent confidence level, etc. If the block 308 determines that the heat absorption data is not normally distributed at the specified confidence level, which may be a result of an erratic soot blowing sequencing, a block 309 modifies the current operational sequencing for operating the soot blowers within the boiler section 200 so that the operational sequencing is more consistent. Subsequently, the control passes back to the block 302 and more data is collected to obtain more observation points of heat absorption data.
- a block 310 calculates a plurality of heat absorption statistical data for the boiler section 200. For example, the block 310 may calculate a heat absorption mean, a heat absorption median, a heat absorption variance, a heat absorption standard deviation, a heat absorption skewness, etc.
- a block 312 evaluates the heat absorption statistical data calculated by the block 310.
- the block 312 may evaluate the heat absorption statistical data against a number of measures provided by a user of the heat absorption statistics calculation program 300 or against a number of industry averages, etc.
- the block 312 may be provided with a target lower control limit and a target upper control limit against which the actual heat absorption of the boiler section is evaluated.
- the heat absorption statistics calculation program 300 may calculate the target lower control limit and the target upper control limit using long term heat absorption statistical data calculated by the block 310.
- an implementation of the heat absorption statistics calculation program 300 may determine a target lower control limit and the target upper control limit using the heat absorption mean and the heat absorption standard deviation.
- a block 314 determines if it is necessary to change the current operational sequencing of the soot blowers. For example, the block 314 may determine that it is necessary to change at least one of the frequencies at which the soot blowers are turned on, the length of time that the soot blowers are kept on, the length of time that the soot blowers are turned off between two consecutive on time periods, etc. In one implementation of the heat absorption statistics calculation program 300, the block 314 may determine that if the actual heat absorption mean is lower than the target lower control limit, then it is necessary to change one or more of the operating parameters of the current operational sequencing.
- a block 316 calculates a change to be applied to any of the various parameters of the current operational sequencing.
- the block 316 may use various heat absorption statistics calculated by the block 310 to determine the change to be applied to the operating parameters of the current operational sequencing. For example, in an implementation of the heat absorption statistics calculation program 300, the block 314 may determine that the change to be applied to the length of time for which the soot blowers are to be kept on should be a function of the difference between the actual heat absorption mean and the target lower control limit.
- the block 314 may also determine that the soot blowing is working effectively, and that it is not necessary to change the current operational sequencing of the soot blowers, in which case the control may transfer to the block 302 for continuous monitoring of the soot blowing process without any changes.
- heat absorption statistics calculation program 300 is illustrated in Fig. 5 and described above with respect to the boiler section 200, the heat absorption statistics calculation program 300 can also be applied to any other heat exchange section of the boiler 100.
- the functions performed by the blocks 312-316 are illustrated in the heat absorption statistics calculation program 300 as being performed by three different blocks, in an alternate implementation, these functions may be performed by a single block or by a separate program.
- Fig. 7A illustrates a flowchart of an implementation of a statistical process control program 350 that may perform the functions of the blocks 312-316.
- a block 352 may determine characteristics of a desired distribution of the heat absorption values for a particular heat exchange section. Determining such characteristics may include selecting a target lower control limit QLCL, a target upper control limit QUCL, and other characteristics of the desired distribution for that particular heat exchange section.
- the target limits and other characteristics of the desired distribution may be derived from the achievable performance information provided by the routine 20.
- the limits and other characteristics may be set automatically by logic programned into the statistical process control program 350 or other operational monitoring systems, or may be set by an operator after consideration of the achievable performance information.
- a block 358 may determine an actual lower limit Qm-3 ⁇ and an actual upper limit Qm+3 ⁇ on a curve depicting a distribution of various heat absorption values. While in the present implementation of the statistical process control program 350, the actual lower limit Qm-3 ⁇ and the actual upper limit Qm+3 ⁇ are functions of only the heat absorption mean Qmean and the heat absorption standard deviation Q ⁇ , in an alternate implementation, alternate statistical values, such as variance, may be used to calculate an alternate actual lower limit and an alternate actual upper limit.
- the actual lower limit Qm-3 ⁇ and the actual upper limit Qm+3 ⁇ are determined to be at 3-sigma points (3 ⁇ ) away from the heat absorption mean Qmean
- an alternate actual lower limit of Qm-x ⁇ and an alternate actual upper limit of Qm+x ⁇ , located at x-sigma points (wherein x is a number that may be selected by the user of the statistical process control program 350) away from the heat absorption mean Qmean may also be used.
- a particular value of x used for the soot blower or other device or process may be determined based on the particular device or process and on the characteristics of the performance parameter being monitored within the device or process.
- a smaller value of x may be appropriate where it is desired or necessary to tightly control the device or process and to maintain a narrow distribution of the parameter, whereas a larger value of x may be appropriate for parameters where tight control of the performance parameter is not essential for the device or process to operate at or close to the achievable performance level.
- x may be an integer or may be any real number.
- a block 360 compares the actual lower limit Qm-3 ⁇ with a target lower control limit QLCL and the actual upper limit Qm+3 ⁇ with the target upper control limit QUCL.
- the block 360 may be provided with a series of rules that may be used for performing the comparison based on the result of the comparison, the block 360 may generate a decision regarding a change that needs to be made to one or more parameters of the current operational sequencing.
- Evaluating the actual lower limit Qm-3 ⁇ and the actual upper limit Qm+3 ⁇ for a particular heat exchange section provides information regarding actual distribution of the heat absorption values for that particular heat exchange section.
- the block 360 of the statistical process control program 350 determines whether the actual distribution of the heat absorption values, as measured over a particular period of time, is approximately equal to the desired distribution of the heat absorption values or not.
- the block 360 may decide that the current operational sequencing used to operate the soot blowers is functioning properly, or that desired control of the soot blowing operations is successfully achieved. Therefore, no change is necessary to any operating parameters of the current operational sequencing, and control passes back to the block 354, as shown by the path A in Fig. 7A .
- the block 360 may determine that the target lower control limit is greater than the actual lower limit (QLCL > Qm-3 ⁇ ) and that the target upper control limit is also greater than the actual upper control limit (QUCL > Qm+3 ⁇ ).
- This outcome signifies that the actual distribution of the heat absorption observations is situated to the left of the desired distribution, as illustrated by a distribution 380 in Fig. 7B .
- a block 362 (which may be implemented by the block 316 of Fig. 6 ) may decrease the idle time between successive soot blowing operations in the current operational sequencing or increase the soot blowing priority of the heat exchange section, so as to shift the actual distribution of heat absorption observations to the right.
- the lower idle time or the higher blowing priority results in more frequent soot blowing operations and therefore removal of higher amounts of soot deposits, which results in narrowing the distribution of the heat absorption data to a desired level specified by the target lower control limit QLCL and the target upper control limit QUCL.
- the amount of change in the idle time and the blowing priority may be determined empirically by a user of the boiler 100.
- the block 360 may determine that the target lower control limit is lower than the actual lower limit (QLCL ⁇ Qm-3 ⁇ ) and that the target upper control limit is also lower than the actual upper control limit (QUCL ⁇ Qm+3 ⁇ ).
- This outcome signifies that the distribution of the heat absorption observations is situated to the right of the desired distribution, as illustrated by a distribution 382 in Fig. 7B .
- this situation may signify excessive soot blowing.
- a block 364 may increase the idle time between successive soot blowing operations in the current operational sequencing, or decrease the soot blowing priority of the heat exchange section, so as to shift the actual distribution of heat absorption observations to the left.
- the higher idle time or the lower blowing priority results in less frequent soot blowing operations and therefore removal of lesser amounts of soot deposits, which results in broadening the distribution of the heat absorption data to a desired level specified by the target lower control limit QLCL and the target upper control limit QUCL.
- the amount of change in the idle time and the blowing priority may be determined empirically by a user of the boiler 100.
- the block 360 may determine that the target lower control limit is higher than the actual lower limit (QLCL > Qm-3 ⁇ ) and that the target upper control limit is lower than the actual upper control limit (QUCL ⁇ Qm+3 ⁇ ).
- This outcome signifies that the actual distribution of the heat absorption observations is broader than the desired distribution, as illustrated by a distribution 384 in Fig. 7B .
- a block 366 compares the current actual heat absorption Qactual with the mean heat absorption Qmean. If the block 366 determines that Qactual ⁇ Qmean, then a block 368 decreases the idle time between successive soot blowing operations or increases the soot blowing priority of the heat exchange section.
- the lower idle time or the higher blowing priority results in more frequent soot blowing operations and therefore removal of higher amounts of soot deposits, which results in shifting the actual lower control limit Qm-3 ⁇ towards the desired lower control limit QLCL.
- the amount of change in the idle time and the blowing priority may be determined empirically by a user of the boiler 100.
- a block 370 increases the idle time between successive blowing operations or decreases the soot blowing priority of the heat exchange section.
- the higher idle time or the lower blowing priority results in less frequent soot blowing operations and therefore removal of lesser amounts of soot deposits, which results in shifting the actual upper control limit Qm+3 ⁇ towards the desired upper control limit QUCL.
- the amount of change in the idle time and the blowing priority may be determined empirically by a user of the boiler 100.
- the block 360 may determine that the target lower control limit is lower than the actual lower limit (QLCL ⁇ Qm-3 ⁇ ) and that the target upper control limit is greater than the actual upper control limit (QUCL > Qm+3 ⁇ ).
- This outcome signifies that the actual distribution of the heat absorption observations is narrower than the desired distribution, as illustrated by a distribution 386 in Fig. 7B .
- a block 372 compares the current actual heat absorption Qactual with the mean heat absorption Qmean. If the block 372 determines that Qactual ⁇ Qmean, then a block 374 increases the idle time between successive blowing operations or decreases the soot blowing priority of the heat exchange section.
- the higher idle time or the lower blowing priority results in less frequent soot blowing operations and therefore removal of lesser amounts of soot deposits, which results in shifting the actual upper control limit Qm+3 ⁇ towards the desired upper control limit QUCL.
- the amount of change in the idle time and the blowing priority may be determined empirically by a user of the boiler 100.
- a block 376 decreases the idle time between successive blowing operations or increases the soot blowing priority of the heat exchange section.
- the lower idle time or the higher blowing priority results in more frequent soot blowing operations and therefore removal of higher amounts of soot deposits, which results in shifting the actual lower control limit Qm-3 ⁇ towards the desired lower control limit QLCL.
- the amount of change in the idle time and the blowing priority may be determined empirically by a user of the boiler 100.
- a block 378 evaluates the effectiveness of the process undertaken by the blocks 354-376 to determine if the current selection of the target upper control limit QUCL and the target lower control level QLCL are effective in controlling the operations of the soot blowers for the particular heat exchange section.
- the block 378 may collect various statistical data related to the shifting of the distribution curves 380-386 over several cycles of operation of the blocks 354-376. If the block 378 determines at the end of such several cycles that the distribution curves 380-386 have shifted significantly to a newer position, such as, for example, a position signified by the distribution curve 384 (of Fig.
- the block 378 may decide that the process undertaken by the blocks 354-376 is not effective in preventing slagging in the heat exchange section, and therefore, pass control back to the block 352 and ask the user of the statistical process control program 350 to select new values for the target upper control limit QUCL and the target lower control limit QLCL.
- a broad distribution of the heat absorption values as illustrated by the curve 384 may signify that while the average heat transfer efficiency of the heat exchange section has not changed over time, individual observations of the heat transfer efficiency are more likely to vary from the average heat transfer efficiency.
- a narrow distribution of the heat absorption values as illustrated by the curve 386 may signify that while the average heat transfer efficiency of the heat exchange section has not changed over time, individual observations of the heat transfer efficiency are less likely to vary from the average heat transfer efficiency.
- the shifting of the distribution of the heat absorption values to the left, as illustrated by the distribution curve 380 may signify an overall reduction in heat transfer efficiency of the heat exchange section due to higher amount of soot deposits (slagging) in the heat exchange section.
- the shifting of the distribution of the heat absorption values to the right, as illustrated by the distribution curve 382 may signify an overall increase in heat transfer efficiency of the heat exchange section. Such increased efficiency may be a result of the higher rate of soot-blowing than necessary and may damage to various water and steam carrying tubes in the heat exchange section.
- Figs. 7A-7B illustrate one implementation of the statistical process control program 350
- Fig. 8 illustrates another statistical process control program that can be used to determine permanent slagging within a heat exchange section of the boiler 100.
- Fig. 8 illustrates a slagging detection program 400 that evaluates the distribution data of the changes in the heat absorption resulting from soot blowing and the correlation between a heat absorption change mean ⁇ Qmean and a frequency of soot blowing in a particular heat exchange section to determine any permanent slagging in that particular heat exchange section.
- the curve 450 may represent a desired distribution of heat absorption change values for that particular heat exchange section.
- the heat absorption change mean ⁇ Qmean may have a value of approximately 100, as illustrated in Fig. 8 .
- the curve 450 may have shifted to a position represented by the curve 452, wherein the actual absorption change mean ⁇ Qmean may become approximately equal to only 80 or even less.
- the slagging detection program 400 may be used to determine such slagging in a heat exchange section.
- a block 410 divides the heat absorption data into various temporal sections. For example, if the slagging detection program 400 has heat absorption data associated with, for example, one month of operations of the heat exchange section, the block 410 may temporally divide such heat absorption data into various sets of data. Alternatively, the block 410 may store the last certain number of periods of data on a rolling basis, such that only the last month's data are analyzed and any data from the prior periods are discarded.
- a block 412 calculates the mean values for the various groups of data as provided by the block 410. For example, the block 412 may calculate the mean absorption change values for each day of the previous month. Subsequently, a block 414 analyzes these mean values to determine if there is a trend in this data. Specifically, the block 414 determines if the mean values are showing any gradual decline or increase over time. A gradual decline in mean values may indicate that the heat exchange section is trending towards permanent slagging and that a change is necessary in the current soot blowing practice. If a shift in the mean absorption change is detected, a correlation analysis may be performed.
- a block 418 calculates and evaluates the correlation between the heat absorption change mean ⁇ Qmean for a particular heat exchange section and the frequency of soot blowing in that particular heat exchange section, denoted by Corrm,f.
- a block 420 may determine whether the correlation value Corrm,f is higher than a given threshold value at a certain confidence level. If the correlation value Corrm,f is higher than the given threshold value, signifying a shifting of the heat absorption change mean ⁇ Qmean to the left being significantly related to the frequency of soot blowing, the block 420 may transfer control back to the block 402 to continue operation of the slagging detection program 400 in its normal mode.
- the block 420 determines that the correlation is not higher than the threshold value, the block 420 notifies the user that there is a potentially permanent slagging condition in the heat exchange section being evaluated.
- the above implementation of the slagging detection program 400 uses the correlation between the heat absorption change mean ⁇ Qmean and the frequency of soot blowing, in an alternate implementation, correlation between the heat absorption change mean ⁇ Qmean and the length of time for which the soot blowers are kept on during each sequence, or some other parameter of the current operational sequencing, may also be used.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- General Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Theoretical Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Evolutionary Computation (AREA)
- Artificial Intelligence (AREA)
- Health & Medical Sciences (AREA)
- Strategic Management (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Mathematical Physics (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Software Systems (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Manufacturing & Machinery (AREA)
- Medical Informatics (AREA)
- Computer Hardware Design (AREA)
- Educational Administration (AREA)
- Primary Health Care (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Operations Research (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Control Of Steam Boilers And Waste-Gas Boilers (AREA)
- Regulation And Control Of Combustion (AREA)
- Control Of Turbines (AREA)
- General Factory Administration (AREA)
Abstract
Description
- This patent relates generally to computer software, and more particularly to computer software used in monitoring and controlling the performance of thermodynamic devices and processes.
- Many of the power plants in operation today are more than 20-30 years old. During that time many changes have occurred in the plant and to plant equipment. Devices have degraded and often times been overhauled and modified mechanically. Moreover, a large number of the utility generation device burn fuels which significantly differ from the fuels for which the devices were designed to burn. As a result, the original manufacturer design curves that were developed at the time the devices were designed and installed in the power plants no longer represent the present-day operating capabilities of the devices.
- The current method of performance monitoring for power plants and the devices therein was developed over 20-30 years ago for units operating with the expected conditions of the power industry at that time. The methodology then and now corresponds to the American and Western European standards of the 1960s and 1970s that emphasized reliability. At the time the methodology was developed, the methods brought many significant advantages in the form of improved quality of performance monitoring and control. However, the method is outdated by the current dynamic deregulation aspects of the power generation industry. Several basic factors contribute to the method becoming outdated. First, the advancement of computer technology that allows for the common use of digital automatic control systems. Secondly, system changes in the power energy market have made the efficacy of this method questionable under current operating conditions. Additionally, the availability of lower cost, highly precise instrumentation that is constantly being monitored and archived to a plant historian provide new opportunities for performance monitoring and comparison of the performance to best achievable performance rather than performance that may have been achievable when the power plant was constructed.
- Digital automatic control systems have made constant control of performance parameters possible by assigning all parameters (and losses) on-line and permitting direct operator supervision. The increased quality of measurement devices and tools has reduced the role of periodic heat rate testing and warranty measurements. In addition, the high quality of DCS automated control connected with the increasingly common application of optimization systems (e.g., supervisory substitution or added bias signals to the operator actions during normal unit operation) has reduced the possibility of a simple improvement based on efficiency indexes. For this reason, the principle role of performance monitoring should be modified to compare actual performance to the best achievable performance for a device or process rather than the predicted performance based on the manufacturer design values, and to detect possible losses of running the in market-based generation dispatch. This change would be more meaningful and understandable to plant operations and engineering personnel.
- The typical methodology of performance control is presented in numerous conference materials and textbooks. In short, the method is based on calculating the unit chemical energy usage rate, also known as unit heat rate (based on ASME Power Test Codes), and assigning the measured losses and deviations of the heat rate from the expected value (nominal, or resulting from the last warranty measurements) based on operation of the device at other than nominal conditions. The basic parameters that influence the unit heat rate and that may be taken into consideration include the main steam pressure, main steam temperature, pressure decrease in the super-heater, reheat steam temperature, condenser pressure, feed-water temperature, oxygen content in flue gas and stack gas temperature. The number of controlled parameters has been expanded many times, but does not change the primary theoretical basis of this method. The heat rate deviation (BTU/kWh) is usually calculated to a value of $/Hr for a more approachable and meaningful presentation of data. Systems based on ASME or similar methodologies were introduced in practically all power plants, with modernization of automatic control systems usually developed into on-line systems performing all the calculations every several minutes and presenting the results on operators' screens at the Distributed Control System (DCS) or auxiliary computer displays.
- The performance calculation methodology is necessary and effective when properly implemented, but also has a set of drawbacks. It is apparent after many years, and many computing platform revisions to calculate results, it may be possible to evaluate the results more critically and to attempt a more in depth analysis. Some of the problems with applying the contemporary performance control techniques relate to the reference values and correction curves used in the control method. Presently, most deviations and losses are calculated and monitored in reference to the so-called reference values. Usually these are the nominal values given by the original equipment manufacturer (OEM). However, for devices with a 15-40 year life cycles and with equipment that has been modernized and rebuilt at least several times, these nominal values do not constitute a real reflection of the actual operating parameters of the device in its present configuration.
- Problems also arise from the correction curves used for defining the controlled or measured losses of the devices. In the present performance monitoring methods, the influence of operational parameter deviations, such as main steam temperature, main steam pressure, and the like, from the design values (i.e. achievable, design, theoretical) are assigned largely using the so-called manufacturers' correction curves. Leaving the accuracy of these curves and the common problems with obtaining this data aside, the basis of his theory is to define the influence of these parameters (xi)(gradient) into unit heat rate (qb) - ∂qb/∂xi. The manufacturer's data normally does not correspond to the real, dynamic operation of a modernized unit. At the same time, there appears to be a theoretical problem with assigning the deviation for the given control value. In the case of building a correction curve, it is assumed that a clear assignment of the influence of a given value onto unit heat rate will be possible (qb). In other words, variables such as pressure and temperature are treated as independent variables which finally leads to obtaining a dependence ∂qb / ∂xi = f(xi). This results from, among other factors, the, method of assigning correction curves through balance calculations and the change of an individual parameter in simulation calculations.
- In actual practice, a strong relationship exists between these parameters during normal operation, and the parameters are interrelated. The relationships can be derived by utilizing statistical techniques. During normal operations, it is not possible to change one parameter without modifying others. Additionally, assigning relationships between these parameters is not only dependent on the thermodynamic dependencies (balance) but it is also influenced by the operation of the automatic control system controlling the unit. In other words, in practice when changing one of the main unit operational parameters, the automatic control systems perform a shift of the unit status into a different operating point, thus modifying the other parameters. Because of this, deviations assigned using correction curves cease to have any practical significance. For example, at a given moment deviations of a unit heat rate for a series of main parameters are assigned, and a negative deviation for one of the parameters resulting from the difference between the current and the nominal or reference value may be obtained. Canceling this difference by bringing the parameter to the nominal or reference value and thus reducing the deviation while the other parameters remain unchanged results in an entirely different system of parameters and differences of the parameters from reference values, and potentially new deviations in their values from the reference values where deviations did not previously exist.
- Consequently, a need exists for using statistical data based analysis and control of the present-day operating conditions to determine the achievable and statistically controllable performance of thermodynamic devices and processes and to improve on the currently applied systems for performance monitoring by taking into account the statistically achievable performance rather than a theoretical or designed ideal performance level.
- One specific example of an application where improved performance monitoring may benefit thermodynamic devices or processes is in fuel burning boilers where soot blowing is performed to adjust the efficiency of heat transfer within the boilers. A variety of industrial as well as non-industrial applications use fuel burning boilers, typically for converting chemical energy into thermal energy by burning one of various types of fuels, such as coal, gas, oil, waste material, etc. An exemplary use of fuel burning boilers is in thermal power generators, wherein fuel burning boilers are used to generate steam from water traveling through a number of pipes and tubes in the boiler and the steam is then used to generate electricity in one or more turbines. The output of a thermal power generator is a function of the amount of heat generated in a boiler, wherein the amount of heat is determined by the amount of fuel that can be burned per hour, etc. Additionally, the output of the thermal power generator may also be dependent upon the heat transfer efficiency of the boiler used to burn the fuel.
- Burning of certain types of fuel, such as coal, oil, waste material, etc., generates a substantial amount of soot, slag, ash and other deposits (generally referred to as "soot") on various surfaces in the boilers, including the inner walls of the boiler as well as on the exterior walls of the tubes carrying water through the boiler. The soot deposited in the boiler has various deleterious effects on the rate of heat transferred from the boiler to the water, and thus on the efficiency of any system using such boilers. It is necessary to address the problem of soot in fuel burning boilers that burn coal, oil, and other such fuels that generate soot in order to maintain a desired efficiency within the boiler. While not all fuel burning boilers generate soot, for the remainder of this patent, the term "fuel burning boilers" is used to refer to those boilers that generate soot.
- Various solutions have been developed to address the problems caused by the generation and presence of soot deposits in boilers of fuel burning boilers. One approach is the use of soot blowers to remove soot encrustations accumulated on boiler surfaces through the creation of mechanical and thermal shock. Another approach is to use various types of soot blowers to spray cleaning materials through nozzles, which are located on the gas side of the boiler walls and/or on other heat exchange surfaces, where such soot blowers use any of the various media such as saturated steam, superheated steam, compressed air, water, etc., for removing soot from the boilers.
- Soot blowing affects the efficiency and the expense of operating a fuel burning boiler. For example, if inadequate soot blowing is applied in a boiler, it results in excessive soot deposits on the surfaces of various steam carrying pipes and therefore in lower heat transfer rates. In some cases, inadequate soot blowing may result in "permanent fouling" within fuel burning boilers, meaning that soot deposits in the boiler are so excessive that such deposits cannot be removed by any additional soot blowing. In such a case, forced outage of the boiler operation may be required to fix the problem of excessive soot deposits, and boiler maintenance personnel may have to manually remove the soot deposits using hammers and chisels. Such forced outages are not only expensive, but also disruptive for the systems using such fuel burning boilers.
- On the other hand, excessive soot blowing in fuel burning boilers may result in increased energy cost to operate the soot blowers, wastage of steam that could otherwise be used to operate turbines, etc. Excessive soot blowing may also be linked to boiler wall tube thinning, tube leaks, etc., which may cause forced outages of boiler use. Therefore, the soot blowing process needs to be carefully controlled.
- Historically, soot blowing in utility boilers has been mostly an ad hoc practice, generally relying on a boiler operator's judgment. Such an ad hoc approach produces very inconsistent results. Therefore, it is important to manage the process of soot blowing more effectively and in a manner so that the efficiency of boiler operations is maximized and the cost associated with the soot blowing operations is minimized.
- One popular method used for determining cleanliness of a boiler section and to control soot blowing operations is a first principle based method, which requires measurements of flue gas temperature and steam temperature at the boiler section inlets and outlets. However, because direct measurements of flue gas temperatures are not always available, the flue gas temperatures are often backward calculated at multiple points along the path of the flue gas, starting from the flue gas temperatures measured at an air heater outlet. This method is quite sensitive to disturbances and variations in air heater outlet flue gas temperatures, often resulting in incorrect results. Moreover, this method is a steady state method, and therefore does not work well in transient processes generally encountered in various boiler sections.
- Another popular method used for determining cleanliness of a boiler section of a fuel burning boiler and to control soot blowing operations in a fuel burning boiler is an empirical model based method, which relies on an empirical model such as a neural network model, a polynomial fit model, etc. The empirical model based method generally requires a large quantity of empirical data related to a number of parameters, such as the fuel flow rate, the air flow rate, the air temperature, the water/steam temperature, the burner tilt, etc. Unfortunately the large amount of data makes the data collection process tedious and prone to high amount of errors in data collection. The model may also be similar to the performance monitoring method discussed above and using reference values and correction curves among other information from the manufacturer. As discussed above, this method evaluates the performance based on the manufacturer's design instead of the optimum achievable performance of the soot blowing operation under the current operating conditions.
- The present patent is illustrated by way of examples and not limitations in the accompanying figures, in which like references indicate similar elements, and in which:
-
Fig. 1 illustrates a flowchart of an exemplary achievable performance evaluation routine; -
Fig. 2 illustrates an exemplary data distribution curve for a thermodynamic parameter of a monitored device or process; -
Fig. 3 illustrates a flowchart of a generalized performance evaluation routine; -
Fig. 4 illustrates a block diagram of a boiler steam cycle for a typical boiler; -
Fig. 5 illustrates a schematic diagram of an exemplary boiler section using a plurality of soot blowers; -
Fig. 6 illustrates a flowchart of an exemplary heat absorption statistics calculation program; -
Fig. 7A illustrates a flowchart of a soot blowing statistical process control program; -
Fig. 7B illustrates a plurality of heat absorption data distribution curves; -
Fig. 8 illustrates a flowchart of a permanent slagging detection program; and -
Fig. 9 illustrates a plurality of heat absorption distribution curves illustrating permanent slagging. - Since modem day control systems make it possible to archive the plant performance data over a long period of time, it is possible to analyze this data using statistical techniques to determine the best achievable performance of a device or process. Statistics and real time plant data can be used to analyze plant data to determine the achievable operating range for a piece of equipment such as a pump, a compressor, and the like, or for an overall process. The analysis should be done soon after a piece of equipment has been serviced or at another time when the equipment or process is considered to be in the best condition. After the achievable operating range is determined, the data distributions for pieces of equipment and processes are observed or monitored over time to determine the actual operating ranges for the equipment/processes during normal operations. The monitoring is also performed to identify when variations from the achievable performance are observed.
- Whenever the data distribution for the actual operating ranges has a significant movement that exceeds a predetermined allowable deviation from the achievable operating range, the piece of equipment or the process may be in need of service. The maximum allowable or tolerable deviation may be determined from operation experience or from a sensitivity analysis of the data. Operations personnel and engineering can be notified of the deviation from the achievable operating range and take the necessary corrective actions. Over time, as a knowledge base is developed of deviations from the achievable operating ranges for the equipment and their likely causes, the control system may be configured to automatically take corrective actions where possible or, at a minimum, to suggest corrective actions to the operations personnel and engineers.
- The procedure discussed above has general applicability to thermodynamic processes in both industrial and non-industrial environments. As used herein, the term process may refer generally to a thermodynamic process occurring within a single device, such as a soot blower, a heat exchanger, a pump, a turbine and the like, or a thermodynamic process involving multiple thermodynamic devices and steps, such as heat exchange sections and other subsystems with power plants, automobile engines, and the like wherein both the achievable performance and the actual performance of the device(s) and process(es) may be determined. The discussion below illustrates one application wherein this generalized approach could be applied to soot blowing within a heat exchange section. Another example where this generalized approach can be applied is in the calculation of power plant controllable losses.
-
Fig. 1 contains a generalized flowchart of the steps of an achievableperformance evaluation routine 20 used to derive accurate correction functions for individual parameters (main steam temperature and pressure, exhaust gas temperature and pressure, fluid flow rates and the like) of a thermodynamic device or process based on the present day operating conditions of the equipment. The achievableperformance evaluation routine 20 may be implemented as software, hardware, firmware or as any combination thereof. When implemented as software, the achievableperformance evaluation routine 20 may be stored on a read only memory (ROM), a random access memory (RAM) or any other memory device used by a computer used to implement the achievableperformance evaluation routine 20. The achievableperformance evaluation routine 20 may be used to calculate and evaluate statistics of only a device or portion of a thermodynamic process or, alternatively, may be used to calculate and evaluate statistics of the entire process. Ideally the routine 20 is executed after the equipment is overhauled or other maintenance has performed, after equipment is replaced, or at any other time at which the devices or processes are contemplated to perform at the maximum achievable performance levels. For example, the routine 20 may be executed after a boiler section is taken out of service to have permanent deposits of soot removed, or after an engine is rebuilt. The evaluation may be performed during a separate testing period before the devices or processes are placed back into normal service, or the evaluation may be performed at the time the devices or processes are placed back into service for the duration of time necessary to collect the necessary data to perform the evaluation. - The achievable
performance evaluation routine 20 may begin at ablock 22 where real time operating data is collected for each controllable loss parameter for the thermodynamic process. Because the devices or processes typically operate at different load levels at various times during normal operations, the devices or processes may be operated over the anticipated load levels to ensure that data is collected for all load ranges at which the devices or processes may operate. As data is collected, ablock 24 calculates the individual performance parameters that are relevant for evaluating and controlling the performance of the devices and/or the process. In some instances, relevant parameters may be directly measurable by the available monitoring devices (e.g., temperatures, pressures and flow rates). In other cases, the parameters are the results of calculations that must be performed due to the nature of the parameter, such as the heat absorption within a boiler section, or to the inability to accurately monitor the value of an otherwise measurable parameter. The operating data is collected until there is a sufficient amount of data for each load range to perform the necessary evaluation of the achievable performance of the device or process. A user may have specified a number of observations that must be collected over range of loads, or may have specified a time period that must elapse to ensure that sufficient data is collected for the process. If insufficient data has been collected at ablock 26, control passes back to theblock 22 for the collection of additional operating data. - Once the
block 26 determines that a sufficient amount of operating data has been collected, analysis may be performed on the data to determine the achievable performance of the device or process as a function of the performance parameters. Control may pass to ablock 28 to perform statistical analysis of the operating data. For example, for each relevant performance parameter, theblock 28 may calculate the mean value, the median value, standard deviation, variance, skewness and other statistical values at the various operating loads. The observed operating data also provide distribution curves for the process parameters at the achievable operating conditions. After sufficient operating data is collected, control may also pass to ablock 30 to derive correction functions that may be substituted for the manufacturer-supplied correction curves or the most recently derived correction functions from the previous execution of the achievableperformance evaluation routine 20. The correction functions may be derived by applying statistical analysis techniques to the operating data to determine degrees of correlation between the performance parameters and the overall performance of the monitored device or process. One example of such a statistical analysis is provided in co-pending U.S. Pat. Appl. No. 11/__,__,filed on March 12, 2008, by Cheng et al., entitled "Use of Statistical Analysis in Power Plant Performance Monitoring," which is expressly incorporated by reference herein. - Once the statistical analysis is performed at the
block 28 and the correction functions are derived at theblock 30, control may pass to ablock 32 to determine the achievable performance for the device or process and the appropriate performance parameters to be used for monitoring, evaluating and controlling the real time performance of the device or process versus the achievable performance. For example, the achievable performance measure may be the performance parameter the value of which most closely correlates to the achievable performance of the device or process. In the case of a boiler section, the calculated heat absorption as the steam passes through the boiler section may provide the most accurate indication of the performance of the section. In an internal combustion engine, the exhaust gas temperature or pressure may be the appropriate performance parameter to measure. Moreover, for a given performance parameter, the operational data and statistical analysis are used to determine the best achievable operating range for the parameters for each load range of the plant. For example,Fig. 2 illustrates anexemplary distribution curve 40 of observations for a performance parameter for a monitored device or process for a given load. The observations are distributed about amean value 42 of the performance parameter, and the device or process may be operating at the achievable level of performance at the load when the performance parameter has a value between alower limit 44 and anupper limit 46 assuming other correlated performance parameters are also operating within their corresponding limits. Returning toFig. 1 , once the achievable performance measures are determined, control passes to ablock 34 where the information is provided as feedback to operations or other monitoring personnel or systems for use in ensuring that the device or process is operating within the desired and/or achievable operating range. Additionally, using other statistical techniques, the heat rate correction function that should be applied to the parameter(s) is derived. Once the correction function is derived, the controllable loss for the parameter in $/HR can be calculated as discussed above. The correction factor will now be determined by the actual device or process data rather than the manufacturer design data. - Using the achievable performance measures, statistical data and correction functions derived by the achievable
performance evaluation routine 20, the performance of a device or process may be monitored and evaluated based on the achievable performance of the particular device or process being monitored instead of an ideal and potentially unattainable theoretical level of performance. Over time, the actual performance of the device or process may shift from theachievable curve 40 shown inFig. 2 . When the actual performance is sufficiently divergent from the achievable performance, the performance parameter(s) should be adjusted, if possible, to improve the performance of device or process to meet the achievable performance or to match that level of performance as closely as possible. -
Fig. 3 contains a generalized flowchart of an actualperformance evaluation routine 50 that may be used to evaluate the performance of the thermodynamic device or process and provide feedback to operations personnel or to any other persons or systems monitoring and controlling the device or process. As with the achievableperformance evaluation routine 20, theperformance evaluation routine 50 may be implemented as software, hardware, firmware or as any combination thereof. When implemented as software, theperformance evaluation routine 50 may be stored on a ROM, a RAM or any other memory device used by a computer used to implement theperformance evaluation routine 50. Theperformance evaluation routine 50 may be used to calculate and evaluate statistics of only a device or portion of a thermodynamic process or, alternatively, may be used to calculate and evaluate statistics of the entire process. - A
block 52 initiates the evaluation of the device or process by collecting real time data for the current operational state of the monitored device or process. The collected operational data may be similar to the operational data collected are theblock 22 of the achievableperformance evaluation routine 20 for performance parameters that may be directly measured or for performance parameters that may be derived from measurable data. It should be noted that theroutines block 54 calculates and stores performance parameter(s) used to compare the current performance the achievable performance in a similar manner as theblock 24. - A
block 56 evaluates the amount of operational data collected and stored by theblocks performance evaluation routine 50, in which case theblock 56 compares the collected data with such a specification provided by the user. If theblock 56 determines that more data is necessary, control passes back to theblock 52. When theblock 56 determines that a sufficient amount of operational data has been collected, ablock 58 calculates a plurality of statistical data for the performance parameter(s) of the monitored device or process. For example, theblock 58 may calculate a mean value, a median value, variance, standard deviation, skewness, and other statistical values that may be relevant to evaluating the real time performance of the device or process. - Subsequently, a
block 60 evaluates the statistical data calculated by theblock 58. In particular, theblock 60 may evaluate the statistical data for the performance parameters against a number of measures provided by a user of theperformance evaluation routine 50 or against a number of industry averages that may be relevant to the real time operation of the device or process. In an implementation of theperformance evaluation routine 50 such as that discussed further below, theblock 60 may be provided with a target lower control limit and a target upper control limit against which the distribution of a performance parameter is evaluated. Alternatively, theperformance evaluation routine 50 may calculate the target lower control limit and the target upper control limit using the statistical data calculated by the achievableperformance evaluation routine 20 for the performance parameter. For example, an implementation of theperformance evaluation program 50 may determine a target lower control limit and the target upper control limit using the achievable mean and the achievable standard deviation for the performance parameter. - After evaluating the performance parameter statistics at the
block 60, ablock 62 determines if it is necessary to change the current operation of the device or process. For example, theblock 62 may determine that it is necessary to change one or more of the setpoints for measurable parameters to move the distribution of the performance parameter toward the achievable distribution ofcurve 40. The particular adjustment or parameter that may be adjusted may be determined based on the manner in which the actual distribution varies from the achievable distribution. For example, it may be necessary to increase or decrease the value of one parameter, or to take the device or process out of service and perform maintenance, where the real time distribution curve is shifted to the left or right from theachievable curve 40, but a different parameter or parameters may be adjusted where the real time distribution curve is broader or narrower than theachievable distribution curve 40. - If the
block 62 determines that it is necessary to change the current operational configuration of the device or process, ablock 64 may calculate a change to be applied to any of the various parameters of the device or process, or provide feedback to the operator to assist in determining the necessary corrective action. Theblock 64 may use various statistics calculated by theblock 58 to determine the change to be applied to the operating parameters. Alternatively, over time a knowledge base may be developed that provides solutions or guidance to the operator as to the most likely cause or causes of the degradation in performance and the available corrective actions that may be taken. The guidance may include indications of whether certain corrective actions are within the permissible operational limits established by the achievable correction curves derived by the achievableperformance evaluation routine 20. Of course, theblock 62 may also determine that the device or process is working effectively, and that it is not necessary to change the current operation, in which case the control may transfer to theblock 52 for continuous monitoring of the device or process without any changes. - Returning to our specific example of soot blowing in a fuel burning boiler, a statistical process control system employs a consistent soot blowing operation for a heat exchange section of, for example, a fuel burning boiler, collects heat absorption data for the heat exchange section and analyzes the distribution of the heat absorption data as well as various parameters of the heat absorption distribution to readjust the soot blowing operation. The statistical process control system may set a desired lower heat absorption limit and a desired upper heat absorption limit and compare them, respectively, with an actual lower heat absorption limit and an actual upper heat absorption limit to determine the readjustment to be made to the soot blowing practice.
- Generally speaking, the statistical process control system described herein is more reliable than the first principle based method and the empirical model based method, and is simple to implement as the statistical process control system requires only heat absorption data for implementation. Moreover, because the statistical process control system described herein uses heat absorption data, it is independent of, and not generally effected by disturbances and noise in flue gas temperatures, thus providing more uniform control over operation of soot blowers and cleanliness of heat exchange sections.
- Generally speaking, an implementation of the statistical process control system measures heat absorption at various points over time to determine differences in heat absorption before and after a soot blowing operation, and calculates various statistical process control measurements based on such heat absorption statistics to determine the effectiveness of the soot blowing operation. The statistical process control system establishes a consistent soot blowing operation for the heat exchange section of a boiler or other machines and reduces the amount of data necessary for controlling the operation of the soot blowers.
-
Fig. 4 illustrates a block diagram of a boiler steam cycle for atypical boiler 100 that may be used, for example, by a thermal power plant. Theboiler 100 may include various sections through which steam or water flows in various forms such as superheated steam, reheat steam, etc. While theboiler 100 illustrated inFig. 4 has various boiler sections situated horizontally, in an actual implementation, one or more of these sections may be positioned vertically, especially because flue gases heating the steam in various boiler sections, such as a water wall absorption section, rise vertically. - The
boiler 100 includes a waterwall absorption section 102, a primarysuperheat absorption section 104, asuperheat absorption section 106 and areheat section 108. Additionally, theboiler 100 may also include one or more de-superheaters 110 and 112 and aneconomizer section 114. The main steam generated by theboiler 100 is used to drive a high pressure (HP)turbine 116 and the hot reheat steam coming from thereheat section 108 is used to drive an intermediate pressure (IP)turbine 118. Typically, theboiler 100 may also be used to drive a low pressure (LP) turbine, which is not shown inFig. 4 . - The water
wall absorption section 102, which is primarily responsible for generating steam, includes a number of pipes through which steam enters a drum. The feed water coming into the waterwall absorption section 102 may be pumped through theeconomizer section 114. The feed water absorbs a large amount of heat when in the waterwall absorption section 102. The waterwall absorption section 102 has a steam drum, which contains both water and steam, and the water level in the drum has to be carefully controlled. The steam collected at the top of the steam drum is fed to the primarysuperheat absorption section 104, and then to thesuperheat absorption section 106, which together raise the steam temperature to very high levels. The main steam output from thesuperheat absorption section 106 drives thehigh pressure turbine 116 to generate electricity. - Once the main steam drives the
HP turbine 116, the steam is routed to thereheat absorption section 108, and the hot reheat steam output from thereheat absorption section 108 is used to drive theIP turbine 118. Thede-superheaters IP turbine 118 may be fed through an LP turbine (not shown here) to a steam condenser (not shown here), where the steam is condensed to a liquid form, and the cycle begins again with various boiler feed pumps pumping the feed water for the next cycle. Theeconomizer section 114 that is located in the flow of hot exhaust gases exiting from the boiler uses the hot gases to transfer additional heat to the feed water before the feed water enters the waterwall absorption section 102. -
Fig. 5 is a schematic diagram of aboiler section 200 having aheat exchanger 202 located in the path of flue gas from theboiler 100. Theboiler section 200 may be part of any of the various heat exchange sections described above, such as the primarysuperheat absorption section 104, thereheat absorption section 108, etc. One of ordinary skill in the art would appreciate that, while the present example of theboiler section 200 may be located in a specific part of theboiler 100, the soot blower control method illustrated in this patent can be applied to any section of the boiler where heat exchange and soot build-up may occur. - The
heat exchanger 202 includes a number oftubes 204 for carrying steam which is mixed together with spray water in amixer 206. Theheat exchanger 202 may convert the mixture of the water and steam to superheated steam. The flue gases input to thereheat section 200 are shown schematically by thearrows 209, and the flue gases leaving theboiler section 200 are shown schematically by thearrows 211. Theboiler section 200 is shown to include sixsoot blowers heat exchanger 202. - The operation of the
soot blowers computer 250. Thecomputer 250 may be designed to store one or more computer programs on amemory 252, which may be in the form of random access memory (RAM), read-only memory (ROM), etc., wherein such a program may be adapted to be processed on a central processing unit (CPU) 254 of thecomputer 250. A user may communicate with thecomputer 250 via an input/output controller 256. Each of the various components of thecomputer 250 may communicate with each other via aninternal bus 258, which may also be used to communicate with anexternal bus 260. Thecomputer 250 may communicate with each of thevarious soot blowers external communication bus 260. - The soot blowers 208-218 may be operated according to a particular soot blowing sequence, specifying the order in which each of the soot blowers 208-218 is to be turned on, the frequency of operation of the soot blowers 208-218, the length of time each soot blower is on, etc. While a given section of a fuel burning boiler may have a number of different heat exchange sections, the supply of steam and water that may be used for soot blowing operations is limited. Therefore, each heat exchange section is assigned a priority level according to which the soot blowers of that heat exchange section are operated. Soot blowers in a heat exchange section with a higher priority will receive needed water and steam to operate fully and the soot blowers in heat exchange sections with lower priorities will operate only when the needed water and steam are available. As described in further detail below, the priority level of a particular heat exchange section may be changed according to a program implemented for controlling the soot blowers of that particular heat exchange section.
-
Fig. 6 illustrates a flowchart of a heat absorptionstatistics calculation program 300 that may be used to calculate heat absorption statistics in any of the various sections of theboiler 100, such as theboiler section 200. The heat absorptionstatistics calculation program 300 may be implemented as software, hardware, firmware or as any combination thereof. When implemented as software, the heat absorptionstatistics calculation program 300 may be stored on a read only memory (ROM), a random access memory (RAM) or any other memory device used by a computer used to implement the soot blowingprocess control program 300. The heat absorptionstatistics calculation program 300 may be used to calculate heat absorption statistics of only one section of theboiler 100 or, alternatively, may be used to calculate heat absorption statistics of all the heat exchange sections in theboiler 100. - A
block 302 initiates the calculation of heat absorption statistics by establishing an initial sequence of operation (current operational sequencing). Such current operational sequencing may be characterized by various parameters defining a timeline for operating each of the plurality of soot blowers within a boiler section, such as theboiler section 200. For example, an implementation of the heat absorptionstatistics calculation program 300 may specify the frequency at which thesoot blower 208 is turned on, the length of time for which thesoot blower 208 is kept on, and the length of time for which thesoot blower 208 is turned off between two consecutive on time periods. - The
block 302 also collects and stores various data related to the steam flowing through theboiler section 200. For example, theblock 302 may collect the temperature and pressure of the steam entering theboiler section 200 and may calculate the entering enthalpy of the boiler section 200 (enthalpy is the heat energy content of a fluid, which has a unit of Btu/lb) denoted by Hi, the temperature and pressure of the steam exiting from theboiler section 200, the exiting enthalpy of theboiler section 200, denoted by Ho, the rate of flow of steam into theboiler section 200, denoted by F lbs/Hr, etc. -
- Alternatively, in some heat exchange sections, such as a sub-section of the water
wall absorption section 102 of theboiler 100, the heat absorption Q may be measured directly using a heat flux sensor. - A
block 306 ofFig. 6 evaluates the amount of heat absorption data collected and stored by theblock 304. For example, a user may have specified the number of observations that must be collected by the soot blowing process control program, in which case theblock 306 compares the collected data with such a specification provided by the user. If theblock 306 determines that more data is necessary, control passes back to theblock 302. - When the
block 306 determines that a sufficient amount of heat absorption data has been collected, ablock 308 determines if the collected data adheres to a normal distribution. A user may provide the confidence level at which the heat absorptionstatistics calculation program 300 needs to determine whether the heat absorption data is normally distributed or not. For example, a user may specify that the heat absorption data must be normally distributed at a ninety-five percent confidence level, etc. If theblock 308 determines that the heat absorption data is not normally distributed at the specified confidence level, which may be a result of an erratic soot blowing sequencing, ablock 309 modifies the current operational sequencing for operating the soot blowers within theboiler section 200 so that the operational sequencing is more consistent. Subsequently, the control passes back to theblock 302 and more data is collected to obtain more observation points of heat absorption data. - If the
block 308 determines that the heat absorption data is normally distributed, ablock 310 calculates a plurality of heat absorption statistical data for theboiler section 200. For example, theblock 310 may calculate a heat absorption mean, a heat absorption median, a heat absorption variance, a heat absorption standard deviation, a heat absorption skewness, etc. - Subsequently, a
block 312 evaluates the heat absorption statistical data calculated by theblock 310. In particular, theblock 312 may evaluate the heat absorption statistical data against a number of measures provided by a user of the heat absorptionstatistics calculation program 300 or against a number of industry averages, etc. - In an implementation of the heat absorption
statistics calculation program 300, theblock 312 may be provided with a target lower control limit and a target upper control limit against which the actual heat absorption of the boiler section is evaluated. Alternatively, the heat absorptionstatistics calculation program 300 may calculate the target lower control limit and the target upper control limit using long term heat absorption statistical data calculated by theblock 310. For example, an implementation of the heat absorptionstatistics calculation program 300 may determine a target lower control limit and the target upper control limit using the heat absorption mean and the heat absorption standard deviation. - After evaluating the heat absorption statistics at the
block 312, ablock 314 determines if it is necessary to change the current operational sequencing of the soot blowers. For example, theblock 314 may determine that it is necessary to change at least one of the frequencies at which the soot blowers are turned on, the length of time that the soot blowers are kept on, the length of time that the soot blowers are turned off between two consecutive on time periods, etc. In one implementation of the heat absorptionstatistics calculation program 300, theblock 314 may determine that if the actual heat absorption mean is lower than the target lower control limit, then it is necessary to change one or more of the operating parameters of the current operational sequencing. - If the
block 314 determines that it is necessary to change the current operational sequencing of the soot blowers, ablock 316 calculates a change to be applied to any of the various parameters of the current operational sequencing. Theblock 316 may use various heat absorption statistics calculated by theblock 310 to determine the change to be applied to the operating parameters of the current operational sequencing. For example, in an implementation of the heat absorptionstatistics calculation program 300, theblock 314 may determine that the change to be applied to the length of time for which the soot blowers are to be kept on should be a function of the difference between the actual heat absorption mean and the target lower control limit. However, theblock 314 may also determine that the soot blowing is working effectively, and that it is not necessary to change the current operational sequencing of the soot blowers, in which case the control may transfer to theblock 302 for continuous monitoring of the soot blowing process without any changes. - Note that while the heat absorption
statistics calculation program 300 is illustrated inFig. 5 and described above with respect to theboiler section 200, the heat absorptionstatistics calculation program 300 can also be applied to any other heat exchange section of theboiler 100. Moreover, while the functions performed by the blocks 312-316 are illustrated in the heat absorptionstatistics calculation program 300 as being performed by three different blocks, in an alternate implementation, these functions may be performed by a single block or by a separate program. -
Fig. 7A illustrates a flowchart of an implementation of a statisticalprocess control program 350 that may perform the functions of the blocks 312-316. Ablock 352 may determine characteristics of a desired distribution of the heat absorption values for a particular heat exchange section. Determining such characteristics may include selecting a target lower control limit QLCL, a target upper control limit QUCL, and other characteristics of the desired distribution for that particular heat exchange section. The target limits and other characteristics of the desired distribution may be derived from the achievable performance information provided by the routine 20. The limits and other characteristics may be set automatically by logic programned into the statisticalprocess control program 350 or other operational monitoring systems, or may be set by an operator after consideration of the achievable performance information. Subsequently, ablock 354 may calculate a heat absorption mean Qmean using the following equation: -
- Subsequently, a
block 358 may determine an actual lower limit Qm-3σ and an actual upper limit Qm+3σ on a curve depicting a distribution of various heat absorption values. While in the present implementation of the statisticalprocess control program 350, the actual lower limit Qm-3σ and the actual upper limit Qm+3σ are functions of only the heat absorption mean Qmean and the heat absorption standard deviation Qσ, in an alternate implementation, alternate statistical values, such as variance, may be used to calculate an alternate actual lower limit and an alternate actual upper limit. Moreover, while in the present example, the actual lower limit Qm-3σ and the actual upper limit Qm+3σ are determined to be at 3-sigma points (3σ) away from the heat absorption mean Qmean, in practice, an alternate actual lower limit of Qm-xσ and an alternate actual upper limit of Qm+xσ, located at x-sigma points (wherein x is a number that may be selected by the user of the statistical process control program 350) away from the heat absorption mean Qmean may also be used. A particular value of x used for the soot blower or other device or process may be determined based on the particular device or process and on the characteristics of the performance parameter being monitored within the device or process. A smaller value of x may be appropriate where it is desired or necessary to tightly control the device or process and to maintain a narrow distribution of the parameter, whereas a larger value of x may be appropriate for parameters where tight control of the performance parameter is not essential for the device or process to operate at or close to the achievable performance level. If desired, x may be an integer or may be any real number. - Subsequently, a
block 360 compares the actual lower limit Qm-3σ with a target lower control limit QLCL and the actual upper limit Qm+3σ with the target upper control limit QUCL. Theblock 360 may be provided with a series of rules that may be used for performing the comparison based on the result of the comparison, theblock 360 may generate a decision regarding a change that needs to be made to one or more parameters of the current operational sequencing. - Evaluating the actual lower limit Qm-3σ and the actual upper limit Qm+3σ for a particular heat exchange section provides information regarding actual distribution of the heat absorption values for that particular heat exchange section. By comparing the actual lower limit Qm-3σ with a target lower control limit QLCL and the actual upper limit Q m+3σ with the target upper control limit QUCL, the
block 360 of the statisticalprocess control program 350 determines whether the actual distribution of the heat absorption values, as measured over a particular period of time, is approximately equal to the desired distribution of the heat absorption values or not. - If the
block 360 determines that the actual lower limit Qm-3σ is approximately equal to the target lower control limit QLCL and that the actual upper limit Q m+3σ is approximately equal to the target upper control limit QUCL, the actual distribution of the heat absorption values is approximately equal to the desired distribution of the heat absorption values. In this case, theblock 360 may decide that the current operational sequencing used to operate the soot blowers is functioning properly, or that desired control of the soot blowing operations is successfully achieved. Therefore, no change is necessary to any operating parameters of the current operational sequencing, and control passes back to theblock 354, as shown by the path A inFig. 7A . - In some situations, the
block 360 may determine that the target lower control limit is greater than the actual lower limit (QLCL > Qm-3σ) and that the target upper control limit is also greater than the actual upper control limit (QUCL > Qm+3σ). This outcome (path B inFig. 7A ) signifies that the actual distribution of the heat absorption observations is situated to the left of the desired distribution, as illustrated by a distribution 380 inFig. 7B . In this situation, a block 362 (which may be implemented by theblock 316 ofFig. 6 ) may decrease the idle time between successive soot blowing operations in the current operational sequencing or increase the soot blowing priority of the heat exchange section, so as to shift the actual distribution of heat absorption observations to the right. The lower idle time or the higher blowing priority results in more frequent soot blowing operations and therefore removal of higher amounts of soot deposits, which results in narrowing the distribution of the heat absorption data to a desired level specified by the target lower control limit QLCL and the target upper control limit QUCL. The amount of change in the idle time and the blowing priority may be determined empirically by a user of theboiler 100. - In another situation, the
block 360 may determine that the target lower control limit is lower than the actual lower limit (QLCL < Qm-3σ) and that the target upper control limit is also lower than the actual upper control limit (QUCL < Qm+3σ). This outcome (path C inFig. 7A ) signifies that the distribution of the heat absorption observations is situated to the right of the desired distribution, as illustrated by adistribution 382 inFig. 7B . Generally, this situation may signify excessive soot blowing. In this situation, ablock 364 may increase the idle time between successive soot blowing operations in the current operational sequencing, or decrease the soot blowing priority of the heat exchange section, so as to shift the actual distribution of heat absorption observations to the left. The higher idle time or the lower blowing priority results in less frequent soot blowing operations and therefore removal of lesser amounts of soot deposits, which results in broadening the distribution of the heat absorption data to a desired level specified by the target lower control limit QLCL and the target upper control limit QUCL. The amount of change in the idle time and the blowing priority may be determined empirically by a user of theboiler 100. - Alternatively, the
block 360 may determine that the target lower control limit is higher than the actual lower limit (QLCL > Qm-3σ) and that the target upper control limit is lower than the actual upper control limit (QUCL < Qm+3σ). This outcome (outcome D inFig. 7A ) signifies that the actual distribution of the heat absorption observations is broader than the desired distribution, as illustrated by adistribution 384 inFig. 7B . In this situation, ablock 366 compares the current actual heat absorption Qactual with the mean heat absorption Qmean. If theblock 366 determines that Qactual < Qmean, then ablock 368 decreases the idle time between successive soot blowing operations or increases the soot blowing priority of the heat exchange section. The lower idle time or the higher blowing priority results in more frequent soot blowing operations and therefore removal of higher amounts of soot deposits, which results in shifting the actual lower control limit Qm-3σ towards the desired lower control limit QLCL. The amount of change in the idle time and the blowing priority may be determined empirically by a user of theboiler 100. - On the other hand, if the
block 366 determines that Qactual > Qmean, then ablock 370 increases the idle time between successive blowing operations or decreases the soot blowing priority of the heat exchange section. The higher idle time or the lower blowing priority results in less frequent soot blowing operations and therefore removal of lesser amounts of soot deposits, which results in shifting the actual upper control limit Qm+3σ towards the desired upper control limit QUCL. The amount of change in the idle time and the blowing priority may be determined empirically by a user of theboiler 100. - Still further, the
block 360 may determine that the target lower control limit is lower than the actual lower limit (QLCL < Qm-3σ) and that the target upper control limit is greater than the actual upper control limit (QUCL > Qm+3σ). This outcome (path E inFig. 7A ) signifies that the actual distribution of the heat absorption observations is narrower than the desired distribution, as illustrated by adistribution 386 inFig. 7B . In this situation, ablock 372 compares the current actual heat absorption Qactual with the mean heat absorption Qmean. If theblock 372 determines that Qactual < Qmean, then ablock 374 increases the idle time between successive blowing operations or decreases the soot blowing priority of the heat exchange section. The higher idle time or the lower blowing priority results in less frequent soot blowing operations and therefore removal of lesser amounts of soot deposits, which results in shifting the actual upper control limit Qm+3σ towards the desired upper control limit QUCL. The amount of change in the idle time and the blowing priority may be determined empirically by a user of theboiler 100. - On the other hand, if the
block 372 determines that Qactual > Qmean, then ablock 376 decreases the idle time between successive blowing operations or increases the soot blowing priority of the heat exchange section. The lower idle time or the higher blowing priority results in more frequent soot blowing operations and therefore removal of higher amounts of soot deposits, which results in shifting the actual lower control limit Qm-3σ towards the desired lower control limit QLCL. The amount of change in the idle time and the blowing priority may be determined empirically by a user of theboiler 100. - Subsequently, a
block 378 evaluates the effectiveness of the process undertaken by the blocks 354-376 to determine if the current selection of the target upper control limit QUCL and the target lower control level QLCL are effective in controlling the operations of the soot blowers for the particular heat exchange section. Theblock 378 may collect various statistical data related to the shifting of the distribution curves 380-386 over several cycles of operation of the blocks 354-376. If theblock 378 determines at the end of such several cycles that the distribution curves 380-386 have shifted significantly to a newer position, such as, for example, a position signified by the distribution curve 384 (ofFig. 7B ), theblock 378 may decide that the process undertaken by the blocks 354-376 is not effective in preventing slagging in the heat exchange section, and therefore, pass control back to theblock 352 and ask the user of the statisticalprocess control program 350 to select new values for the target upper control limit QUCL and the target lower control limit QLCL. - A broad distribution of the heat absorption values as illustrated by the
curve 384 may signify that while the average heat transfer efficiency of the heat exchange section has not changed over time, individual observations of the heat transfer efficiency are more likely to vary from the average heat transfer efficiency. On the other hand, a narrow distribution of the heat absorption values as illustrated by thecurve 386 may signify that while the average heat transfer efficiency of the heat exchange section has not changed over time, individual observations of the heat transfer efficiency are less likely to vary from the average heat transfer efficiency. - The shifting of the distribution of the heat absorption values to the left, as illustrated by the distribution curve 380 may signify an overall reduction in heat transfer efficiency of the heat exchange section due to higher amount of soot deposits (slagging) in the heat exchange section. On the other hand, the shifting of the distribution of the heat absorption values to the right, as illustrated by the
distribution curve 382 may signify an overall increase in heat transfer efficiency of the heat exchange section. Such increased efficiency may be a result of the higher rate of soot-blowing than necessary and may damage to various water and steam carrying tubes in the heat exchange section. - While
Figs. 7A-7B illustrate one implementation of the statisticalprocess control program 350,Fig. 8 illustrates another statistical process control program that can be used to determine permanent slagging within a heat exchange section of theboiler 100. Specifically,Fig. 8 illustrates a slaggingdetection program 400 that evaluates the distribution data of the changes in the heat absorption resulting from soot blowing and the correlation between a heat absorption change mean ΔQmean and a frequency of soot blowing in a particular heat exchange section to determine any permanent slagging in that particular heat exchange section. -
- For example, the
curve 450 may represent a desired distribution of heat absorption change values for that particular heat exchange section. In an ideal case, the heat absorption change mean ΔQmean may have a value of approximately 100, as illustrated inFig. 8 . However, due to permanent slagging (i.e., the soot blowing not being effective any more), thecurve 450 may have shifted to a position represented by thecurve 452, wherein the actual absorption change mean ΔQmean may become approximately equal to only 80 or even less. The slaggingdetection program 400 may be used to determine such slagging in a heat exchange section. - The operation of the blocks 402-409 of the slagging
detection program 400 are similar to that of the blocks 302-309 of the heat absorptionstatistics calculation program 300, except that while the blocks 302-309 calculate various statistics regarding heat absorption Q for a particular heat exchange section, the blocks 402-409 calculate various statistics regarding changes in the heat absorption ΔQ for a particular heat exchange section. Subsequently, ablock 410 divides the heat absorption data into various temporal sections. For example, if the slaggingdetection program 400 has heat absorption data associated with, for example, one month of operations of the heat exchange section, theblock 410 may temporally divide such heat absorption data into various sets of data. Alternatively, theblock 410 may store the last certain number of periods of data on a rolling basis, such that only the last month's data are analyzed and any data from the prior periods are discarded. - A
block 412 calculates the mean values for the various groups of data as provided by theblock 410. For example, theblock 412 may calculate the mean absorption change values for each day of the previous month. Subsequently, ablock 414 analyzes these mean values to determine if there is a trend in this data. Specifically, theblock 414 determines if the mean values are showing any gradual decline or increase over time. A gradual decline in mean values may indicate that the heat exchange section is trending towards permanent slagging and that a change is necessary in the current soot blowing practice. If a shift in the mean absorption change is detected, a correlation analysis may be performed. - A
block 418 calculates and evaluates the correlation between the heat absorption change mean ΔQmean for a particular heat exchange section and the frequency of soot blowing in that particular heat exchange section, denoted by Corrm,f. Ablock 420 may determine whether the correlation value Corrm,f is higher than a given threshold value at a certain confidence level. If the correlation value Corrm,f is higher than the given threshold value, signifying a shifting of the heat absorption change mean ΔQmean to the left being significantly related to the frequency of soot blowing, theblock 420 may transfer control back to theblock 402 to continue operation of the slaggingdetection program 400 in its normal mode. However, if theblock 418 determines that the correlation is not higher than the threshold value, theblock 420 notifies the user that there is a potentially permanent slagging condition in the heat exchange section being evaluated. Note that while the above implementation of the slaggingdetection program 400 uses the correlation between the heat absorption change mean ΔQmean and the frequency of soot blowing, in an alternate implementation, correlation between the heat absorption change mean ΔQmean and the length of time for which the soot blowers are kept on during each sequence, or some other parameter of the current operational sequencing, may also be used. - Although the forgoing text sets forth a detailed description of numerous different embodiments of the invention, it should be understood that the scope of the invention is defined by the words of the claims set forth at the end of this patent. The detailed description is to be construed as exemplary only and does not describe every possible embodiment of the invention because describing every possible embodiment would be impractical, if not impossible. Numerous alternative embodiments could be implemented, using either current technology or technology developed after the filing date of this patent, which would still fall within the scope of the claims defining the invention.
- Thus, many modifications and variations may be made in the techniques and structures described and illustrated herein without departing from the spirit and scope of the present invention. Accordingly, it should be understood that the methods and apparatus described herein are illustrative only and are not limiting upon the scope of the invention.
The preferred features of the present invention can be summarized as follows: - 1. A method of controlling a thermodynamic process, the method comprising:
- operating the process according to a first operational state for a first period of time;
- determining performance parameter values of the process during the first period of time;
- determining a performance parameter statistical value from the performance parameter values; and
- evaluating the performance parameter statistical value to determine a change in an operating parameter of the first operational state.
- 2. A method of Aspect 1, wherein operating the process further comprises operating a plurality of thermodynamic devices within the process.
- 3. A method of Aspect 1, wherein determining the performance parameter statistical value further comprises determining a plurality of performance parameter statistical values.
- 4. A method of
Aspect 3, wherein determining the plurality of performance parameter statistical values includes determining at least two or more of (1) a performance parameter mean; (2) a performance parameter standard deviation; (3) a performance parameter lower limit; and (4) a performance parameter upper limit. - 5. A method of Aspect1, wherein determining a performance parameter statistical value includes determining a performance parameter lower limit equal to a performance parameter mean less a multiple of a performance parameter standard deviation and determining a performance parameter upper limit equal to the performance parameter mean plus the multiple of the performance parameter standard deviation.
- 6. A method of Aspect 5, wherein evaluating the performance parameter statistical value comprises:
- comparing the performance parameter upper limit with a target upper control limit; and
- comparing the performance parameter lower limit with a target lower control limit.
- 7. A method of Aspect 6, wherein the change in the operating parameter of the first operational state is a function of a difference between the performance parameter lower limit and the target lower control limit, or a difference between the performance parameter upper limit and the target upper control limit.
- 8. A method of Aspect 6, further comprising evaluating the effectiveness of the change in the operating parameter on the unit heat rate of the process to adjust the change in the operating parameter.
- 9. A method of Aspect 8, wherein the effectiveness of the change in the operating parameter of the first operational state is evaluated by measuring a shift in the distribution of the performance parameter values.
- 10. A method of Aspect 1, wherein determining the performance parameter statistical value includes determining a performance parameter change mean value.
- 11. A method of Aspect 1, wherein the process is one of: (1) a water wall absorption section; (2) a superheat section; (3) a reheat absorption section; (4) an economizer; or (5) an air heater.
- 12. A method of Aspect 1, further comprising analyzing a distribution of the performance parameter values to determine if the distribution of the performance parameter values conform to normal distribution.
- 13. A method of Aspect 1, wherein operating the process further comprises operating a single thermodynamic device within the process.
- 14. A method of Aspect 1, wherein evaluating the performance parameter statistical value comprises comparing the performance parameter statistical value to an achievable performance measure for the performance parameter.
- 15. A method of Aspect 14, comprising:
- collecting operational data during the operation of the process during a second period of time during which the process operates at an achievable performance level for the process;
- calculating values of performance parameters from the operational data collected during the second period of time;
- performing statistical analysis of the operational data collected for the performance parameters during the second period of time;
- deriving correction functions for the performance parameters from the operational data collected for the performance parameters during the second period of time; and
- determining the achievable performance measure based on the statistical analysis of the operational data and the correction functions derived from the operational data.
- 16. A method of Aspect 5, wherein the second period of time occurs at a different time than the first period of time.
- 17. A method of Aspect 15, wherein the second period of time occurs during the first period of time.
- 18. A method of determining an achievable performance measure for a thermodynamic process and controlling the thermodynamic process, comprising:
- operating the process during an evaluation period of time in which the process operates at a maximum achievable performance level;
- collecting operational data during the operation of the process during the evaluation period of time;
- calculating values of performance parameters of the process from the operational data collected during the evaluation period of time;
- performing statistical analysis of the operational data collected for the performance parameters during the evaluation period of time;
- deriving correction functions for the performance parameters from the operational data collected for the performance parameters during the evaluation period of time; and
- determining an achievable performance measure based on the statistical analysis of the operational data and the correction functions derived from the operational data.
- 19. A method of Aspect 18, comprising providing feedback to an operational monitor regarding the achievable performance measure.
- 20. A method of Aspect: 18, comprising:
- operating the process according to a first operational state for an operational period of time;
- determining performance parameter values of the process during the operational period of time;
- determining a performance parameter statistical value from the performance parameter values; and
- comparing the performance parameter statistical value the achievable performance measure to determine a change in an operating parameter of the first operational state.
- 21. A method of
Aspect 20, wherein the operational period of time occurs at a different time than the evaluation period of time. - 22. A method of
Aspect 20, wherein the evaluation period of time occurs during the operational period of time. - 23. A method of
Aspect 20, wherein determining the performance parameter statistical value further comprises determining a plurality of performance parameter statistical values. - 24. A method of
Aspect 20, wherein determining the plurality of performance parameter statistical values includes determining at least two or more of: (1) a performance parameter mean; (2) a performance parameter standard deviation; (3) a performance parameter lower limit; and (4) a performance parameter upper limit. - 25. A method of
Aspect 20, wherein determining a performance parameter statistical value includes determining a performance parameter lower limit equal to a performance parameter mean less a multiple of a performance parameter standard deviation and determining a performance parameter upper limit equal to the performance parameter mean plus the multiple of the performance parameter standard deviation. - 26. A method of Aspect 25, wherein evaluating the performance parameter statistical value comprises:
- comparing the performance parameter upper limit with a target upper control limit of the achievable performance measure; and
- comparing the performance parameter lower limit with a target lower control limit of the achievable performance measure.
- 27. A method of
Aspect 26, wherein the change in the operating parameter of the first operational state is a function of a difference between the performance parameter lower limit and the target lower control limit, or a difference between the performance parameter upper limit and the target upper control limit. - 28. A method of
Aspect 20, wherein the effectiveness of the change in the operating parameter of the first operational state is evaluated by measuring a shift in the distribution of the performance parameter values. - 29. A method of
Aspect 20, further comprising analyzing a distribution of the performance parameter values to determine if the distribution of the performance parameter values conform to normal distribution. - 30. A method of Aspect 18, wherein operating the process further comprises operating a plurality of thermodynamic devices within the process.
- 31. A method of Aspect 18, wherein operating the process further comprises operating a single thermodynamic device within the process.
Claims (15)
- A method of controlling a thermodynamic process, the method comprising:operating the process according to a first operational state for a first period of time;determining performance parameter values of the process during the first period of time;determining a performance parameter statistical value from the performance parameter values; andevaluating the performance parameter statistical value to determine a change in an operating parameter of the first operational state.
- A method of claim 1, wherein operating the process further comprises operating a plurality of thermodynamic devices within the process.
- A method of claim 1, wherein determining the performance parameter statistical value further comprises determining a plurality of performance parameter statistical values, wherein determining the plurality of performance parameter statistical values preferably includes determining at least two or more of: (1) a performance parameter mean; (2) a performance parameter standard deviation; (3) a performance parameter lower limit; and (4) a performance parameter upper limit.
- A method of claim 1, wherein determining a performance parameter statistical value includes determining a performance parameter lower limit equal to performance parameter mean less a multiple of a performance parameter standard deviation and determining a performance parameter upper limit equal to the performance parameter mean plus the multiple of the performance parameter standard deviation.
- A method of claim 4, wherein evaluating the performance parameter statistical value comprises:comparing the performance parameter upper limit with a target upper control limit; andcomparing the performance parameter lower limit with a target lower control limit.
- A method of claim 5, wherein the change in the operating parameter of the first operational state is a function of a difference between the performance parameter lower limit and the target lower control limit, or a difference between the performance parameter upper limit and the target upper control limit.
- A method of claim 4, further comprising evaluating the effectiveness of the change in the operating parameter of the unit heat rate of the process to adjust the change in the operating parameter, wherein the effectiveness of the change in the operating parameter of the first operational state is preferably evaluated by measuring a shift in the distribution of the performance parameter values.
- A method of claim 1, wherein determining the performance parameter statistical value includes determining a performance parameter change mean value.
- A method of claim 1, wherein the process is of: (1) a water wall absorption section; (2) a superheat section; (3) a reheat absorption section; (4) an economizer; or (5) an air heater.
- A method of claim 1, further comprising analyzing a distribution of the performance parameter values to determine if the distribution of the performance parameter values conform to normal distribution.
- A method a claim 1, wherein operating the process further comprises operating a single thermodynamic device within the process.
- A method of claim 1, wherein evaluating the performance parameter statistical value comprises comparing the performance parameter statistical value to an achievable performance measure for the performance parameter.
- A method of claim 12, comprising:collecting operational data during the operation of the process during a second period of time during which the process operates at an achievable performance level for the process;calculating values of performance parameters from the operational data collected during the second period of time;performing statistical analysis of the operational data collected for the performance parameters during the second period of time;deriving correction functions for the performance parameters from the operational data collected for the performance parameters during the second period of time; anddetermining the achievable performance measure based on the statistical analysis of the operational data and the correction functions derived from the operational data.
- A method of claim 13, wherein the second period of time occurs at a different time than the first period of time.
- A method of claim 13, wherein the second period of time occurs during the first period of time.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US89433907P | 2007-03-12 | 2007-03-12 | |
EP08743807A EP2126649B1 (en) | 2007-03-12 | 2008-03-12 | Method and apparatus for generalized performance evaluation of equipment using achievable performance derived from statistics and real-time data |
Related Parent Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP08743807.3 Division | 2008-03-12 | ||
EP08743807A Division-Into EP2126649B1 (en) | 2007-03-12 | 2008-03-12 | Method and apparatus for generalized performance evaluation of equipment using achievable performance derived from statistics and real-time data |
EP08743807A Division EP2126649B1 (en) | 2007-03-12 | 2008-03-12 | Method and apparatus for generalized performance evaluation of equipment using achievable performance derived from statistics and real-time data |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2444869A1 true EP2444869A1 (en) | 2012-04-25 |
EP2444869B1 EP2444869B1 (en) | 2017-05-03 |
Family
ID=39527223
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP11194847.7A Active EP2444869B1 (en) | 2007-03-12 | 2008-03-12 | Method and apparatus for generalized performance evaluation of equipment using achievable performance derived from statistics and real-time data |
EP08743814A Active EP2132607B1 (en) | 2007-03-12 | 2008-03-12 | Use of statistical analysis in power plant performance monitoring |
EP08743807A Active EP2126649B1 (en) | 2007-03-12 | 2008-03-12 | Method and apparatus for generalized performance evaluation of equipment using achievable performance derived from statistics and real-time data |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP08743814A Active EP2132607B1 (en) | 2007-03-12 | 2008-03-12 | Use of statistical analysis in power plant performance monitoring |
EP08743807A Active EP2126649B1 (en) | 2007-03-12 | 2008-03-12 | Method and apparatus for generalized performance evaluation of equipment using achievable performance derived from statistics and real-time data |
Country Status (7)
Country | Link |
---|---|
US (1) | US8200369B2 (en) |
EP (3) | EP2444869B1 (en) |
CN (4) | CN103257641B (en) |
CA (2) | CA2680706C (en) |
GB (2) | GB2459593B (en) |
HK (2) | HK1134346A1 (en) |
WO (2) | WO2008112823A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103019190A (en) * | 2012-11-28 | 2013-04-03 | 无锡中自能源科技有限公司 | Intelligent energy motoring and analyzing method |
CN104685426A (en) * | 2012-06-29 | 2015-06-03 | Abb技术有限公司 | A method for optimization of control and fault analysis in a thermal power plant |
CN105005278A (en) * | 2015-06-03 | 2015-10-28 | 杭州舒尔姿氨纶有限公司 | Method of acquisition and calculating analysis of DCS control parameter data |
Families Citing this family (82)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7383790B2 (en) | 2005-06-06 | 2008-06-10 | Emerson Process Management Power & Water Solutions, Inc. | Method and apparatus for controlling soot blowing using statistical process control |
US7680751B2 (en) * | 2006-05-31 | 2010-03-16 | Honeywell International Inc. | Neural network based refrigerant charge detection algorithm for vapor compression systems |
JP4961390B2 (en) * | 2008-06-12 | 2012-06-27 | 株式会社日立製作所 | Plant monitoring and control apparatus and event analysis support method |
US8407027B2 (en) * | 2008-10-21 | 2013-03-26 | Fuji Electric Systems Co., Ltd. | Online diagnostic method and online diagnostic system for geothermal generation facility |
US8291720B2 (en) * | 2009-02-02 | 2012-10-23 | Optimum Energy, Llc | Sequencing of variable speed compressors in a chilled liquid cooling system for improved energy efficiency |
EP2244011A1 (en) * | 2009-03-24 | 2010-10-27 | Siemens AG | Method and device for regulating the temperature of steam for a steam power plant |
SG166031A1 (en) | 2009-05-05 | 2010-11-29 | Yokogawa Electric Corp | Apparatus and method for monitoring an industrial process |
US8886361B1 (en) * | 2009-06-22 | 2014-11-11 | The Southern Company | Energy decision management system |
EP2980735A1 (en) * | 2009-07-31 | 2016-02-03 | Global Surface Intelligence Ltd | Greenhouse gas grid and tracking system |
CN102713859B (en) * | 2009-11-09 | 2015-04-29 | 艾克瑟吉有限公司 | System and method for maximising thermal efficiency of power plant |
US8346693B2 (en) * | 2009-11-24 | 2013-01-01 | King Fahd University Of Petroleum And Minerals | Method for hammerstein modeling of steam generator plant |
CN101865960A (en) * | 2010-06-04 | 2010-10-20 | 中兴通讯股份有限公司 | Method and device for monitoring equipment efficiency performance |
US9447963B2 (en) | 2010-08-16 | 2016-09-20 | Emerson Process Management Power & Water Solutions, Inc. | Dynamic tuning of dynamic matrix control of steam temperature |
US9335042B2 (en) | 2010-08-16 | 2016-05-10 | Emerson Process Management Power & Water Solutions, Inc. | Steam temperature control using dynamic matrix control |
US9217565B2 (en) * | 2010-08-16 | 2015-12-22 | Emerson Process Management Power & Water Solutions, Inc. | Dynamic matrix control of steam temperature with prevention of saturated steam entry into superheater |
US8755916B2 (en) | 2010-12-07 | 2014-06-17 | Alstom Technology Ltd. | Optimized integrated controls for oxy-fuel combustion power plant |
CN102053613B (en) * | 2010-12-31 | 2012-08-29 | 北京三博中自科技有限公司 | Energy real-time monitoring system of industrial process equipment and monitoring method thereof |
CN102081679B (en) * | 2011-01-24 | 2012-10-03 | 深圳市共济科技有限公司 | Computer performance data acquisition method and device |
WO2012108795A1 (en) * | 2011-02-08 | 2012-08-16 | Volvo Lastvagnar Ab | Method of calibration of a fuel injector in an exhaust aftertreatment system |
US9058029B2 (en) * | 2011-03-31 | 2015-06-16 | Brad Radl | System and method for creating a graphical control programming environment |
US9110453B2 (en) * | 2011-04-08 | 2015-08-18 | General Cybernation Group Inc. | Model-free adaptive control of advanced power plants |
US20120283988A1 (en) * | 2011-05-03 | 2012-11-08 | General Electric Company | Automated system and method for implementing unit and collective level benchmarking of power plant operations |
US20120283885A1 (en) * | 2011-05-04 | 2012-11-08 | General Electric Company | Automated system and method for implementing statistical comparison of power plant operations |
US9194758B2 (en) * | 2011-06-20 | 2015-11-24 | General Electric Company | Virtual sensor systems and methods for estimation of steam turbine sectional efficiencies |
US9200591B2 (en) * | 2011-07-06 | 2015-12-01 | Honeywell International Inc. | Automatic identification of operating parameters for power plants |
CN102354116B (en) * | 2011-08-05 | 2014-06-25 | 北京航空航天大学 | Method for making omega event interval control chart for high quality process statistics control |
US20130042616A1 (en) * | 2011-08-15 | 2013-02-21 | General Electric Company | Use of motor protection system to assist in determining power plant metrics |
WO2013041440A1 (en) * | 2011-09-20 | 2013-03-28 | Abb Technology Ag | System and method for plant wide asset management |
US9163828B2 (en) | 2011-10-31 | 2015-10-20 | Emerson Process Management Power & Water Solutions, Inc. | Model-based load demand control |
US8756180B2 (en) * | 2011-11-28 | 2014-06-17 | General Electric Company | Method and system for managing plant operation |
DE112012006178B4 (en) * | 2012-04-02 | 2019-04-25 | Mitsubishi Electric Corporation | parameter setting |
CN102645348A (en) * | 2012-04-28 | 2012-08-22 | 北京三博中自科技有限公司 | Steam turbine driven energy efficiency monitoring system of fluid conveying device |
US9431942B2 (en) * | 2012-07-02 | 2016-08-30 | Kohler Co. | Generator management system that selectively activates generators based on an operating parameter |
US9778632B2 (en) | 2012-07-02 | 2017-10-03 | Kohler Co. | Generator management system and method that selectively activate at least one of a plurality of generators in a power generation system |
US11995667B2 (en) | 2012-07-25 | 2024-05-28 | Prevedere Inc. | Systems and methods for business analytics model scoring and selection |
US9368972B2 (en) | 2012-07-27 | 2016-06-14 | Kohler Co. | Generator management system that determines a time to activate and deactivate generators based on the load level |
US9411326B2 (en) | 2012-08-21 | 2016-08-09 | General Electric Company | Plant control optimization system including visual risk display |
US9626634B2 (en) * | 2012-09-12 | 2017-04-18 | Abb Schweiz Ag | Industrial plant equipment, process and maintenance optimization |
WO2014053971A1 (en) * | 2012-10-01 | 2014-04-10 | Abb Technology Ltd. | A system and a method for tracking plant-wide fault |
US9255525B2 (en) | 2012-11-30 | 2016-02-09 | General Electric Company | System and method for gas turbine operation |
TWI544440B (en) | 2012-12-04 | 2016-08-01 | 財團法人資訊工業策進會 | Demand response determination apparatus and demand response determination method thereof |
US9477214B2 (en) * | 2013-03-07 | 2016-10-25 | General Electric Company | Plant control systems and methods |
CN103279121B (en) * | 2013-05-10 | 2014-08-20 | 国家电网公司 | Method for testing real-time performance of DCS (Distributed Control System) controller |
US20160230699A1 (en) * | 2013-09-06 | 2016-08-11 | Neuco, Inc. | Combined cycle power generation optimization system |
CN103629690B (en) * | 2013-11-26 | 2016-03-02 | 浙江工商大学 | The scattered control system of boiler-burner |
US10545986B2 (en) * | 2013-12-27 | 2020-01-28 | General Electric Company | Systems and methods for dynamically grouping data analysis content |
US10956014B2 (en) | 2013-12-27 | 2021-03-23 | Baker Hughes, A Ge Company, Llc | Systems and methods for dynamically grouping data analysis content |
US20150184549A1 (en) | 2013-12-31 | 2015-07-02 | General Electric Company | Methods and systems for enhancing control of power plant generating units |
US9957843B2 (en) | 2013-12-31 | 2018-05-01 | General Electric Company | Methods and systems for enhancing control of power plant generating units |
CN104216396A (en) * | 2014-08-19 | 2014-12-17 | 上海交通大学 | Method for evaluating performance of single-variable multi-time-variant disturbance systems in cracking furnaces |
US20160110277A1 (en) * | 2014-10-16 | 2016-04-21 | Siemens Aktiengesellshaft | Method for Computer-Aided Analysis of an Automation System |
CN104536868A (en) * | 2014-11-26 | 2015-04-22 | 北京广通信达科技有限公司 | Dynamic threshold analysis method for operation index of IT system |
CN104504614B (en) * | 2014-12-16 | 2018-09-18 | 深圳市出新知识产权管理有限公司 | Obtain the pilot system and its method of the optimal controllable factor of thermal power plant |
CN104571022B (en) * | 2014-12-16 | 2018-11-02 | 深圳市出新知识产权管理有限公司 | Power consumption analysis model experimental systems and method based on coal consumption Yu controllable factor relationship |
US20160179063A1 (en) * | 2014-12-17 | 2016-06-23 | Microsoft Technology Licensing, Llc | Pipeline generation for data stream actuated control |
US9605559B2 (en) | 2015-02-02 | 2017-03-28 | General Electric Company | Wash timing based on turbine operating parameters |
JP2016189088A (en) * | 2015-03-30 | 2016-11-04 | 株式会社日立製作所 | Facility management support system |
US9977447B2 (en) | 2015-03-31 | 2018-05-22 | Enernoc, Inc. | Demand response dispatch system employing weather induced facility energy consumption characterizations |
US10025338B2 (en) | 2015-03-31 | 2018-07-17 | Enernoc, Inc. | Demand response dispatch prediction system |
US20160294185A1 (en) | 2015-03-31 | 2016-10-06 | Enernoc, Inc. | Energy brown out prediction system |
US20160291622A1 (en) | 2015-03-31 | 2016-10-06 | Enernoc, Inc. | System for weather induced facility energy consumption characterization |
CN104932488B (en) * | 2015-06-30 | 2017-06-16 | 南京工业大学 | Model predictive control performance evaluation and diagnosis method |
US10161269B2 (en) * | 2015-07-17 | 2018-12-25 | Nec Corporation | Output efficiency optimization in production systems |
EP3133268B1 (en) * | 2015-08-21 | 2020-09-30 | Ansaldo Energia IP UK Limited | Method for operating a power plant |
CN105243089B (en) * | 2015-09-09 | 2018-12-25 | 中国石油天然气股份有限公司 | Method for processing detection data in pipeline |
CN105512355A (en) * | 2015-11-22 | 2016-04-20 | 沈阳黎明航空发动机(集团)有限责任公司 | Natural gas conveying pipeline gas-fire compressor unit type selection and gas turbine performance examining method under stable state |
WO2017123985A1 (en) * | 2016-01-13 | 2017-07-20 | Harnischfeger Technologies, Inc. | Providing operator feedback during operation of an industrial machine |
US10033317B2 (en) * | 2016-10-14 | 2018-07-24 | Florida Power & Light Company | Automated maximum sustained rate system and method |
TWI794229B (en) * | 2017-05-05 | 2023-03-01 | 美商布魯克斯自動機械美國公司 | Method and apparatus for health assessment of a transport apparatus |
US10843341B2 (en) | 2017-05-05 | 2020-11-24 | Brooks Automation, Inc. | Method and apparatus for health assessment of a transport apparatus |
DE102017113926A1 (en) * | 2017-06-23 | 2018-12-27 | Rwe Power Aktiengesellschaft | Method of operating a power plant |
CN108107854B (en) * | 2017-12-15 | 2020-05-08 | 远光智和卓源(北京)科技有限公司 | DCS-based power plant fuel intelligent management and control system and method |
WO2019123077A1 (en) * | 2017-12-18 | 2019-06-27 | Abb Schweiz Ag | Correction curve estimation for power plant components |
JP7011486B2 (en) * | 2018-02-16 | 2022-01-26 | 三菱重工パワー環境ソリューション株式会社 | Plant equipment monitoring and control system and plant equipment monitoring and control method |
CN109905271B (en) * | 2018-05-18 | 2021-01-12 | 华为技术有限公司 | Prediction method, training method, device and computer storage medium |
CN108802486B (en) * | 2018-07-25 | 2020-09-18 | 杭州哲达节能科技有限公司 | Method for measuring and improving energy efficiency of TRT (blast furnace top gas recovery turbine) system in power generation process |
CN110363383A (en) * | 2019-06-03 | 2019-10-22 | 华东电力试验研究院有限公司 | A kind of distributed power generation monitoring technology based under digital development |
EP3792708A1 (en) * | 2019-09-10 | 2021-03-17 | L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude | Determination of relevant functioning parameters in an industrial plant |
WO2021138216A1 (en) * | 2019-12-30 | 2021-07-08 | Prevedere, Inc. | Systems and methods for business analytics model scoring and selection |
CN113377746B (en) * | 2021-07-02 | 2023-08-18 | 贵州电网有限责任公司 | Test report database construction and intelligent diagnosis analysis system |
CN114491378A (en) * | 2021-12-22 | 2022-05-13 | 华电电力科学研究院有限公司 | Steam turbine backpressure calculation method based on iteration method and electronic device |
CN116187984B (en) * | 2023-04-28 | 2023-07-25 | 华能济南黄台发电有限公司 | Multi-dimensional inspection method and system for power plant |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5440478A (en) * | 1994-02-22 | 1995-08-08 | Mercer Forge Company | Process control method for improving manufacturing operations |
US20010034582A1 (en) * | 2000-03-21 | 2001-10-25 | The Tokyo Electric Power Co. Inc. | Thermal efficiency diagnostic method and apparatus of a combined power generation plant |
US20050033464A1 (en) * | 2003-08-06 | 2005-02-10 | Siemens Dematic Electronics Assembly Systems, Inc. | Real time closed-loop process control system for defect prevention |
US20070012085A1 (en) * | 2005-07-12 | 2007-01-18 | Nec Electronics Corporation | Method and apparatus for detecting abnormal characteristic values capable of suppressing detection of normal characteristic values |
Family Cites Families (52)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH357742A (en) | 1958-03-12 | 1961-10-31 | Sulzer Ag | Method and device for influencing the initial state of the steam at at least two intermediate superheaters of a steam generator system assigned to different expansion stages |
CH358096A (en) | 1958-03-12 | 1961-11-15 | Sulzer Ag | Process for regulating the output temperatures at superheaters in a steam generator system and equipment for carrying out the process |
US3137278A (en) | 1961-01-10 | 1964-06-16 | Diamond Power Speciality | Blower type cleaning for heat exchanging apparatus |
US4085438A (en) | 1976-11-11 | 1978-04-18 | Copes-Vulcan Inc. | Digital sootblower control systems and methods therefor |
JPH0248807B2 (en) | 1987-04-24 | 1990-10-26 | Babcock Hitachi Kk | SUUTOBUROWANOSEIGYOHOHO |
US5027751A (en) | 1990-07-02 | 1991-07-02 | Westinghouse Electric Corp. | Method and apparatus for optimized boiler operation |
US5181482A (en) | 1991-12-13 | 1993-01-26 | Stone & Webster Engineering Corp. | Sootblowing advisor and automation system |
CN1029647C (en) * | 1994-01-31 | 1995-08-30 | 清华大学 | Method for monitoring subsynchronous oscillation of power system and monitor |
JP3062582B2 (en) | 1995-11-07 | 2000-07-10 | 株式会社日立製作所 | Method and apparatus for predicting furnace state of pulverized coal combustion equipment |
US6505145B1 (en) * | 1999-02-22 | 2003-01-07 | Northeast Equipment Inc. | Apparatus and method for monitoring and maintaining plant equipment |
US8044793B2 (en) * | 2001-03-01 | 2011-10-25 | Fisher-Rosemount Systems, Inc. | Integrated device alerts in a process control system |
US7206646B2 (en) * | 1999-02-22 | 2007-04-17 | Fisher-Rosemount Systems, Inc. | Method and apparatus for performing a function in a plant using process performance monitoring with process equipment monitoring and control |
US6490506B1 (en) * | 1999-05-21 | 2002-12-03 | Hydro Resource Solutions Llc | Method and apparatus for monitoring hydroelectric facility maintenance and environmental costs |
FR2796197B1 (en) * | 1999-07-05 | 2001-10-12 | Framatome Sa | METHOD AND DEVICE FOR MONITORING AT LEAST ONE OPERATING PARAMETER OF THE CORE OF A NUCLEAR REACTOR |
US6368975B1 (en) * | 1999-07-07 | 2002-04-09 | Applied Materials, Inc. | Method and apparatus for monitoring a process by employing principal component analysis |
US6325025B1 (en) | 1999-11-09 | 2001-12-04 | Applied Synergistics, Inc. | Sootblowing optimization system |
JP3810615B2 (en) * | 2000-05-18 | 2006-08-16 | 三菱重工業株式会社 | Turbine remote control method and system |
US6980928B1 (en) * | 2000-09-06 | 2005-12-27 | General Electric Company | System and method for providing efficiency and cost analysis during steam path audits |
US6738931B1 (en) * | 2000-11-03 | 2004-05-18 | General Electric Company | Reliability assessment method, apparatus and system for quality control |
FI117143B (en) | 2000-11-30 | 2006-06-30 | Metso Automation Oy | Method and equipment for cleaning the boiler for soda |
US7275025B2 (en) * | 2000-12-27 | 2007-09-25 | General Electric Company | Method and system for analyzing performance of a turbine |
WO2002066974A2 (en) * | 2001-02-19 | 2002-08-29 | Rosemount Analytical Inc. | Improved generator monitoring, control and efficiency |
US7797062B2 (en) * | 2001-08-10 | 2010-09-14 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
FI20011742A (en) * | 2001-08-31 | 2003-03-01 | Metso Field Systems Oy | A method and system for analyzing the performance of an industrial process control circuit |
DE10151250A1 (en) | 2001-10-17 | 2003-05-08 | Bayer Ag | Process for determining a complex correlation pattern from process and plant data |
US6898540B2 (en) * | 2002-11-12 | 2005-05-24 | General Electric Company | System and method for displaying real-time turbine corrected output and heat rate |
JP2004211587A (en) * | 2002-12-27 | 2004-07-29 | Toshiba Corp | Operational support system for power generation plant |
US7065414B2 (en) * | 2003-03-10 | 2006-06-20 | General Electric Company | Methods and apparatus for operating production facilities |
US6736089B1 (en) * | 2003-06-05 | 2004-05-18 | Neuco, Inc. | Method and system for sootblowing optimization |
US7134610B2 (en) * | 2003-06-25 | 2006-11-14 | Spraying Systems Co. | Method and apparatus for monitoring system integrity in gas conditioning applications |
US7233843B2 (en) * | 2003-08-08 | 2007-06-19 | Electric Power Group, Llc | Real-time performance monitoring and management system |
CN1771439B (en) * | 2004-02-27 | 2012-12-05 | 王砧 | On-line monitoring method for a fossil fuel converter apparatus |
ITTO20040377A1 (en) * | 2004-06-07 | 2004-09-07 | Martini Daniele De | PROCEDURE AND SYSTEM FOR THE STATISTICAL CONTROL OF INDUSTRIAL PROCESSES. |
CN1713188A (en) * | 2004-06-24 | 2005-12-28 | 上海汽轮机有限公司 | Heating power and vane information management of turbine |
US7117046B2 (en) * | 2004-08-27 | 2006-10-03 | Alstom Technology Ltd. | Cascaded control of an average value of a process parameter to a desired value |
US7536232B2 (en) * | 2004-08-27 | 2009-05-19 | Alstom Technology Ltd | Model predictive control of air pollution control processes |
US20060047607A1 (en) * | 2004-08-27 | 2006-03-02 | Boyden Scott A | Maximizing profit and minimizing losses in controlling air pollution |
US7567887B2 (en) * | 2004-09-10 | 2009-07-28 | Exxonmobil Research And Engineering Company | Application of abnormal event detection technology to fluidized catalytic cracking unit |
WO2006047623A2 (en) * | 2004-10-25 | 2006-05-04 | Neuco, Inc. | Method and system for calculating marginal cost curves using plant control models |
US20060106740A1 (en) * | 2004-11-12 | 2006-05-18 | General Electric Company | Creation and correction of future time interval power generation curves for power generation costing and pricing |
CN2758782Y (en) * | 2004-12-22 | 2006-02-15 | 华北电力大学(北京) | Non-contact electric generator local discharge on-line monitoring direction sensing apparatus |
US7356383B2 (en) * | 2005-02-10 | 2008-04-08 | General Electric Company | Methods and apparatus for optimizing combined cycle/combined process facilities |
US7109446B1 (en) | 2005-02-14 | 2006-09-19 | Emerson Process Management Power & Water Solutions, Inc. | Method and apparatus for improving steam temperature control |
US6993403B1 (en) * | 2005-03-22 | 2006-01-31 | Praxair Technology, Inc. | Facility monitoring method |
CN100368949C (en) * | 2005-04-28 | 2008-02-13 | 南京科远控制工程有限公司 | Automatic control system based on artificial intelligence for heat-engine plant |
US7383790B2 (en) | 2005-06-06 | 2008-06-10 | Emerson Process Management Power & Water Solutions, Inc. | Method and apparatus for controlling soot blowing using statistical process control |
US8140296B2 (en) | 2005-06-06 | 2012-03-20 | Emerson Process Management Power & Water Solutions, Inc. | Method and apparatus for generalized performance evaluation of equipment using achievable performance derived from statistics and real-time data |
CN2864766Y (en) * | 2005-09-27 | 2007-01-31 | 广东长青(集团)有限公司 | Intelligent control management outfit for waste burning power plant |
US7526405B2 (en) * | 2005-10-14 | 2009-04-28 | Fisher-Rosemount Systems, Inc. | Statistical signatures used with multivariate statistical analysis for fault detection and isolation and abnormal condition prevention in a process |
US7599750B2 (en) * | 2005-12-21 | 2009-10-06 | Pegasus Technologies, Inc. | Model based sequential optimization of a single or multiple power generating units |
US7917240B2 (en) * | 2006-09-29 | 2011-03-29 | Fisher-Rosemount Systems, Inc. | Univariate method for monitoring and analysis of multivariate data |
US7840332B2 (en) * | 2007-02-28 | 2010-11-23 | General Electric Company | Systems and methods for steam turbine remote monitoring, diagnosis and benchmarking |
-
2008
- 2008-03-12 CA CA2680706A patent/CA2680706C/en active Active
- 2008-03-12 EP EP11194847.7A patent/EP2444869B1/en active Active
- 2008-03-12 CN CN201310153018.0A patent/CN103257641B/en active Active
- 2008-03-12 CN CN201410055861.XA patent/CN103792927B/en active Active
- 2008-03-12 EP EP08743814A patent/EP2132607B1/en active Active
- 2008-03-12 GB GB0914093.0A patent/GB2459593B/en active Active
- 2008-03-12 GB GB0914094.8A patent/GB2459594B/en active Active
- 2008-03-12 US US12/047,217 patent/US8200369B2/en active Active
- 2008-03-12 CN CN200880008034.8A patent/CN101657765B/en active Active
- 2008-03-12 EP EP08743807A patent/EP2126649B1/en active Active
- 2008-03-12 WO PCT/US2008/056741 patent/WO2008112823A1/en active Application Filing
- 2008-03-12 CA CA2679632A patent/CA2679632C/en active Active
- 2008-03-12 WO PCT/US2008/056699 patent/WO2008112791A2/en active Application Filing
- 2008-03-12 CN CN200880007954.8A patent/CN101689050B/en active Active
-
2010
- 2010-03-05 HK HK10102338.5A patent/HK1134346A1/en unknown
- 2010-03-05 HK HK10102343.8A patent/HK1134348A1/en unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5440478A (en) * | 1994-02-22 | 1995-08-08 | Mercer Forge Company | Process control method for improving manufacturing operations |
US20010034582A1 (en) * | 2000-03-21 | 2001-10-25 | The Tokyo Electric Power Co. Inc. | Thermal efficiency diagnostic method and apparatus of a combined power generation plant |
US20050033464A1 (en) * | 2003-08-06 | 2005-02-10 | Siemens Dematic Electronics Assembly Systems, Inc. | Real time closed-loop process control system for defect prevention |
US20070012085A1 (en) * | 2005-07-12 | 2007-01-18 | Nec Electronics Corporation | Method and apparatus for detecting abnormal characteristic values capable of suppressing detection of normal characteristic values |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104685426A (en) * | 2012-06-29 | 2015-06-03 | Abb技术有限公司 | A method for optimization of control and fault analysis in a thermal power plant |
CN104685426B (en) * | 2012-06-29 | 2017-12-26 | Abb 技术有限公司 | For the control in steam power plant and the method for the optimization of accident analysis |
CN103019190A (en) * | 2012-11-28 | 2013-04-03 | 无锡中自能源科技有限公司 | Intelligent energy motoring and analyzing method |
CN105005278A (en) * | 2015-06-03 | 2015-10-28 | 杭州舒尔姿氨纶有限公司 | Method of acquisition and calculating analysis of DCS control parameter data |
Also Published As
Publication number | Publication date |
---|---|
CN103257641B (en) | 2016-08-17 |
HK1134348A1 (en) | 2010-04-23 |
US20090012653A1 (en) | 2009-01-08 |
HK1134346A1 (en) | 2010-04-23 |
EP2132607A1 (en) | 2009-12-16 |
CN101689050B (en) | 2014-03-12 |
US8200369B2 (en) | 2012-06-12 |
GB0914094D0 (en) | 2009-09-16 |
CA2679632C (en) | 2018-01-09 |
EP2126649B1 (en) | 2012-09-19 |
GB2459593B (en) | 2011-12-21 |
WO2008112823A1 (en) | 2008-09-18 |
GB2459593A (en) | 2009-11-04 |
CA2680706C (en) | 2018-01-09 |
CN101657765B (en) | 2014-02-12 |
EP2444869B1 (en) | 2017-05-03 |
CN103792927A (en) | 2014-05-14 |
CA2679632A1 (en) | 2008-09-18 |
WO2008112791A2 (en) | 2008-09-18 |
EP2132607B1 (en) | 2012-10-17 |
EP2126649A2 (en) | 2009-12-02 |
CN103257641A (en) | 2013-08-21 |
WO2008112791A3 (en) | 2008-11-06 |
CN101657765A (en) | 2010-02-24 |
GB2459594A (en) | 2009-11-04 |
GB2459594B (en) | 2012-02-08 |
CN101689050A (en) | 2010-03-31 |
CN103792927B (en) | 2017-01-04 |
CA2680706A1 (en) | 2008-09-18 |
GB0914093D0 (en) | 2009-09-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2444869B1 (en) | Method and apparatus for generalized performance evaluation of equipment using achievable performance derived from statistics and real-time data | |
US8140296B2 (en) | Method and apparatus for generalized performance evaluation of equipment using achievable performance derived from statistics and real-time data | |
US7890214B2 (en) | Method and apparatus for controlling soot blowing using statistical process control | |
US7890197B2 (en) | Dual model approach for boiler section cleanliness calculation | |
US4969408A (en) | System for optimizing total air flow in coal-fired boilers | |
JP2002155708A (en) | System and method of providing guidance for power- generating plant | |
Moelbak | Advanced control of superheater steam temperatures–an evaluation based on practical applications | |
JP7142545B2 (en) | Boiler tube leak diagnostic system and boiler tube leak diagnostic method | |
Lefton et al. | The increased cost of cycling operations at combined cycle power plants | |
Swirski | Power plant performance monitoring using statistical methodology approach | |
WO2020230373A1 (en) | Corrosion management system, water treatment device, power plant, corrosion management method, and corrosion management program | |
Agbleze et al. | Modeling and control of subcritical coal-fired power plant components for fault detection | |
Syahnanda et al. | Design of Steam Power Plant Condenser Machine Maintenance Using RCM (Reliability Centered Maintenance) Methods with RCPS Implementation | |
Hartner et al. | Model-based data reconciliation to improve accuracy and reliability of performance evaluation of thermal power plants | |
JP2020046814A (en) | Operation support method, operation support device, and operation support program | |
Sarunac et al. | Sootblowing operation: the last optimization frontier | |
Sorce et al. | Heat Recovery Steam Generator Health Assessment Basing on Reconciled Measurement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AC | Divisional application: reference to earlier application |
Ref document number: 2126649 Country of ref document: EP Kind code of ref document: P |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20121024 |
|
17Q | First examination report despatched |
Effective date: 20130925 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20161102 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AC | Divisional application: reference to earlier application |
Ref document number: 2126649 Country of ref document: EP Kind code of ref document: P |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 890652 Country of ref document: AT Kind code of ref document: T Effective date: 20170515 Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602008050147 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20170503 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 890652 Country of ref document: AT Kind code of ref document: T Effective date: 20170503 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170803 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170804 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170903 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170803 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602008050147 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20180206 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20180331 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180312 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180312 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180312 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20080312 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230525 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240220 Year of fee payment: 17 Ref country code: GB Payment date: 20240220 Year of fee payment: 17 |