CN204662934U CN201520381539.6U CN201520381539U CN204662934U CN 204662934 U CN204662934 U CN 204662934U CN 201520381539 U CN201520381539 U CN 201520381539U CN 204662934 U CN204662934 U CN 204662934U
Authority
CN
China
Prior art keywords
runing rest
platform
operation platform
super high
hoistway operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520381539.6U
Other languages
Chinese (zh)
Inventor
才振花
王战发
俞存言
孙飞群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Ze Chang Investment (group) Co Ltd
Original Assignee
Xinjiang Ze Chang Investment (group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Ze Chang Investment (group) Co Ltd filed Critical Xinjiang Ze Chang Investment (group) Co Ltd
Priority to CN201520381539.6U priority Critical patent/CN204662934U/en
Application granted granted Critical
Publication of CN204662934U publication Critical patent/CN204662934U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses one Super High hoistway operation platform easily, described operating platform is placed in elevator shaft, and is arranged on both sides body of wall relative in elevator shaft, and the both sides body of wall being in identical platform is equipped with the wedged hole of four arrangements that are square; Described operating platform has four girders of the arrangement that is square, and the end of described girder is all hinged with runing rest, and the position of described runing rest is corresponding with the position of described wedged hole, and described runing rest can rotate in the horizontal direction around jointed shaft; The utility model has the advantage of: device structure is simple, easy to use, not fragile, long service life.

Description

One is Super High hoistway operation platform easily
Technical field
The utility model relates to a kind of hoistway operation platform, and specifically one Super High hoistway operation platform easily, belongs to hoistway operation platform field.
Background technology
In existing technology, building operations is in order to safety operation, and general elevator shaft inside is all on the shelf with steel pipe colligation, manufactures platform and operates.Because present building storey is all very high, every layer such, platform all will upwards bridge joint.Consume a large amount of materials with artificial.Pressure is above too large, also has very large to spoil danger.Name is called that " hoistway operation platform " application number is that the Chinese utility model patent of " 201220346853.7 " discloses a kind of hoistway operation platform, be placed in elevator shaft, and be arranged on both sides body of wall relative in elevator shaft, the both sides body of wall being in identical platform is equipped with the wedged hole of four arrangements that are square; Described operating platform has four girders of the arrangement that is square, and in girder, both sides are equipped with the steel pipe that one end open is closed in one end, and steel pipe is closed one end and fixed by bearing pin and girder; Be provided with the spring and movable pipe that extrude mutually in steel pipe, spring is placed in the side that steel pipe is closed, and movable pipe one end has curved end, and embeds in body of wall wedged hole.But device structure is complicated, uses inconvenience, easily damages.
Utility model content
In order to solve the problem, the utility model devises one Super High hoistway operation platform easily, and device structure is simple, easy to use, not fragile, long service life.
The technical solution of the utility model is:
One is Super High hoistway operation platform easily, and described operating platform is placed in elevator shaft, and is arranged on both sides body of wall relative in elevator shaft, and the both sides body of wall being in identical platform is equipped with the wedged hole of four arrangements that are square; Described operating platform has four girders of the arrangement that is square, the end of described girder is all hinged with runing rest, the position of described runing rest is corresponding with the position of described wedged hole, described runing rest can rotate in the horizontal direction around jointed shaft, thus turns in wedged hole by runing rest;
Further, described four girders are fixed on scaffold.
Further, described girder and runing rest are provided with spacing bearing pin installing hole, for placing spacing bearing pin, after runing rest is launched, can maintain static.
Further, the two described girders being in top are provided with several suspension ring.
The utility model hoistway operation platform, have the advantages such as material usage is few, the rate of climb is fast, safety factor is high, constructability, can greatly increase work efficiency and quality, runing rest can around scaffold floor side radial rotary, the anglec of rotation is 90 °, and there is certain slope at runing rest two ends.When entering vertical shaft, runing rest end straight down, supporting at needs is that four runing rests are rotated up the embedded box that 90 ° are placed in vertical shaft, when going out vertical shaft, along with the lifting of scaffold, runing rest recovers state straight down gradually due to Action of Gravity Field.
The utility model has the advantage of: device structure is simple, easy to use, not fragile, long service life.
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment.
Detailed description of the invention
Below preferred embodiment of the present utility model is described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the utility model, and be not used in restriction the utility model.
Embodiment 1
As shown in Figure 1, one is Super High hoistway operation platform easily, and described operating platform is placed in elevator shaft, and is arranged on both sides body of wall 1 relative in elevator shaft, and the both sides body of wall 1 being in identical platform is equipped with the wedged hole 2 of four arrangements that are square; Described operating platform has four girders 3 of the arrangement that is square, the end of described girder 3 is all hinged with runing rest 4, the position of described runing rest 4 is corresponding with the position of described wedged hole 2, described runing rest 4 can rotate in the horizontal direction around jointed shaft, thus is turned to by runing rest in wedged hole 2;
Described four girders 3 are fixed on scaffold 5.
Described girder 3 and runing rest 4 are provided with spacing bearing pin installing hole, for placing spacing bearing pin 6, after runing rest is launched, can maintain static.
The two described girders 3 being in top are provided with several suspension ring 7.
The utility model hoistway operation platform, have the advantages such as material usage is few, the rate of climb is fast, safety factor is high, constructability, can greatly increase work efficiency and quality, runing rest can around scaffold floor side radial rotary, the anglec of rotation is 90 °, and there is certain slope at runing rest two ends.When entering vertical shaft, runing rest end straight down, supporting at needs is that four runing rests are rotated up the embedded box that 90 ° are placed in vertical shaft, when going out vertical shaft, along with the lifting of scaffold, runing rest recovers state straight down gradually due to Action of Gravity Field.

Claims (2)

1. a Super High hoistway operation platform easily, is characterized in that: described operating platform is placed in elevator shaft, and is arranged on both sides body of wall relative in elevator shaft, and the both sides body of wall being in identical platform is equipped with the wedged holes of four arrangements that are square; Described operating platform has four girders of the arrangement that is square, and the end of described girder is all hinged with runing rest, and the position of described runing rest is corresponding with the position of described wedged hole, and described runing rest can rotate in the horizontal direction around jointed shaft.
2. one according to claim 1 Super High hoistway operation platform easily, is characterized in that: described girder and runing rest are provided with spacing bearing pin installing hole, for placing spacing bearing pin.
CN201520381539.6U 2015-06-04 2015-06-04 One is Super High hoistway operation platform easily Expired - Fee Related CN204662934U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520381539.6U CN204662934U (en) 2015-06-04 2015-06-04 One is Super High hoistway operation platform easily

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520381539.6U CN204662934U (en) 2015-06-04 2015-06-04 One is Super High hoistway operation platform easily

Publications (1)

Publication Number Publication Date
CN204662934U true CN204662934U (en) 2015-09-23

Family

ID=54133329

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520381539.6U Expired - Fee Related CN204662934U (en) 2015-06-04 2015-06-04 One is Super High hoistway operation platform easily

Country Status (1)

Country Link
CN (1) CN204662934U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112096048A (en) * 2020-09-14 2020-12-18 中国建筑第八工程局有限公司 Double-layer integral lifting operation platform for high-rise building construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112096048A (en) * 2020-09-14 2020-12-18 中国建筑第八工程局有限公司 Double-layer integral lifting operation platform for high-rise building construction

Similar Documents

Publication Publication Date Title
CN203113658U (en) High-rise emergency escape ladder balcony guardrail
CN202055241U (en) Steel reinforcement cage suspension ring device
CN104153556B (en) Movable supporting hanging frame for civil engineering
WO2011028786A3 (en) Method of preventing dropped casing string with axial load sensor
CN202706501U (en) Elevator shaft operating platform
CN204098464U (en) A kind of civil engineering packaged type supporting rack
CN204662934U (en) One is Super High hoistway operation platform easily
CN103603426B (en) A kind of bracing or strutting arrangement for frame construction
CN203889942U (en) Lifting device
CN202882376U (en) Elevator shaft template support platform
CN206126699U (en) Multi -functional portable lifting machine
CN208747581U (en) A kind of transmission line high-altitude operation self-powered platform
CN202347884U (en) Overhaul platform for water turbine
CN202744175U (en) Sling used for hoisting precast concrete columns
CN205976394U (en) Convenient low layer construction scaffolding
CN201962597U (en) Movable trestle bridge with suspension arm device
CN202704845U (en) Special overturning support for hoisting and overturning large-size memorial gateway
CN203499575U (en) Hydraulic lifting derrick for petroleum drilling machine
CN101660660A (en) Novel installing method of gas cabinet
CN204508645U (en) A kind of tower crane self-unloading counter weight device
CN204643594U (en) Telescopic rotary formula inside flange workpiece insurance suspender
CN205875410U (en) A hang module system all for tube structure room panel construction
CN203499232U (en) Attached lifting scaffold
CN203976290U (en) Electric system dewatering pump lifting assistive device
CN207499498U (en) One kind shores fixing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150923

Termination date: 20170604