CN1296577C - Method for repairing sewer using water-proof film lining - Google Patents
Method for repairing sewer using water-proof film lining Download PDFInfo
- Publication number
- CN1296577C CN1296577C CNB200410016365XA CN200410016365A CN1296577C CN 1296577 C CN1296577 C CN 1296577C CN B200410016365X A CNB200410016365X A CN B200410016365XA CN 200410016365 A CN200410016365 A CN 200410016365A CN 1296577 C CN1296577 C CN 1296577C
- Authority
- CN
- China
- Prior art keywords
- water
- criticize
- sealing
- repairing
- grid cloth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention discloses a method for repairing a sewer by a water-preventing film lining, which comprises the following particular steps: water is stopped, and leakage is blocked; pulp is injected, and soil is solidified; a breaking point is treated; the water-preventing film lining is arranged; an edge is sealed; maintenance is carried out. The present invention adopts a pipe inner repairing technique in the repairing process of the water discharge pipelines of cities and industrial areas and does not need the heavy excavation of road surfaces. The present invention has the advantages of low repairing expense, short construction period, easy operation, reliable repairing quality and very strong practicability, and the present invention can be conveniently comprehensively popularized and used in the repairing process of the sewer in China.
Description
Technical field
The present invention relates to the recovery technique of municipal engineering, specifically a kind of method that adopts the waterproof film liner to repair sewer.
Background technology
Generally all adopt excavation type comb job practices in the drainage pipe immersed tube of city, industrial occupancy is repaired, this job practices needs the road surface heavy excavation, and is time-consuming, influence traffic, especially in the city, this job practices is difficulty day by day, and the pressure that brings to urban traffic is too big.Also have at present and adopt external trenchless technology to repair sewer, though solved the problem that the road surface heavy excavation influences traffic, but this restorative procedure needs special construction machinery and the patching material of import, there is the repair cost height, complex operation, deficiencies such as long construction period are difficult to popularize in an all-round way in China's sewer is repaired and use.
Summary of the invention
A kind of method that adopts the waterproof film liner to repair sewer that the objective of the invention is to provide at the deficiencies in the prior art, it is repaired in pipe, do not need the road surface heavy excavation, repair cost is low, easy and simple to handle, short construction period, repairing quality is reliable, have very strong practicality, be convenient to China and in sewer is repaired, popularize use in an all-round way.
The concrete technical scheme that realizes the object of the invention is:
A kind of method that adopts the waterproof film liner to repair sewer, it comprises following concrete steps:
A, sealing leak stopping: with the sewer pipe shutoff, the desilting of drawing water with water under high pressure flush clean tube wall, is sought seepage, breaking point;
B, the solid soil of slip casting: open several grout holes from inside to outside at the pipe joint place, in managing, outwards the soil body outside the pipe joint pipe and the inspection shaft bottom soil body are carried out slip casting, the firm soil body;
C, breaking point are handled: adopt cement to accelerate to burn smart mode to the 1-3mm slit and repair; After adopting the water blockoff mortar to fill out embedding to the 4-10mm sealing, enrich sealing with the polyurethane injection; Adopt filleting technology to repair to the 11-30mm sealing;
D, the waterproof film liner is set: (1), pipe joint surfacing: the inwall with both sides, emery wheel hacking pipe joint center makes it have roughness; (2), implement the end and criticize: criticize at the bottom of scraping pasty state on the inwall of the both sides, pipe joint center of hacking batch, thickness remains on 2-3mm; (3), lay grid cloth: treat the end criticize stiff after, lay grid cloth thereon; (4), face is criticized construction: criticize the pulpous state waterproof face of strike-ofing and criticize on grid cloth, thickness remains on 3-4mm;
E, edge sealing: with solvent-free epoxy resin to waterproof film liner both sides mouth edge sealing;
F, maintenance: natural curing water flowing after seven days.
Described slurry is made into cement, flyash, water glass.
Criticize and adopt polymer concrete dry-powder to add water furnishing pasty state at the described end.
Described grid cloth is fiberglass gridding cloth or chemical fibre grid cloth.
Described batch is adopted polymer concrete dry-powder addition polymerization compound cement based emulsion furnishing pasty state.
The present invention does not need the road surface heavy excavation just can repair immersed tube in repair in city, industrial occupancy sewer pipe, and it is low to have a rehabilitation expense, short construction period, easy and simple to handle, repairing quality is reliable, has very strong practicality, is convenient to China and popularizes use in an all-round way in sewer is repaired.
The specific embodiment:
1, sealing leak stopping:
At the pipeline section place blocking pipe that " immersed tube " phenomenon takes place, drain ponding in the pipe, poison gas situation in the detector tube, mud in the purge tube, with water under high pressure flush clean tube wall, enter then and seek the seepage breaking point in the pipeline, adopt the leak stopping of quick water blockoff mortar, that does not have obvious seepage breakage can carry out the construction of the grouting reinforcement soil body earlier in pipe.The emphasis of slip casting is fixed to the filling of the pipe joint place outer soil body of pipe and the inspection shaft bottom soil body, and plays the effect that water proof blocks water.Thereby the position of injected hole should be chosen in apart from per pass interface 0.30M place: require every pipe joint pipeline joint place is opened 4 injected holes up and down at least.Both sides grout hole about φ 800 following pipelines should be opened in pipe on the upper side; φ 1200 above pipelines should be opened in pipe position on the lower side, as the injected hole spacing excessive also should augment injected hole, do not produce phenomenon out of stock with the block water section of water proof consolidated earth mass of guarantee.1 of grout hole is offered in inspection shaft bottom, should control slurry denseness and by the required pressure of the grouting degree of depth during grouting well, and [following (containing φ 1000) the slip casting degree of depth of φ 1000 pipelines must not be less than 1.0M; φ 1200~φ 1800 slip casting degree of depth must not be less than 1.5M; The φ 2000 above slip casting degree of depth must not little 2.0M], answering pressure is done adjustment gradually from deep to shallow when grouting operation.Slip casting mixing ratio by weight [No. 525 cement: flyash: water glass, 0.9: 0.1: 30% (being radix promptly)] with concrete and coal ash weight sum.
2, breaking point is handled:
Adopting cement to accelerate to burn smart mode to 1~3mm slit repairs.
After adopting the water blockoff mortar to fill out embedding to 4~10mm sealing, enrich sealing with the polyurethane injection again.
11~30mm sealing (interface does not misplace) employing filleting technology is repaired.
3, pipe joint is handled:
Should cut earlier if any the cement mortar that exceeds tube wall, inwall with each 26-40 centimetre width of both sides, electric wheel hacking per pass interface center, and guaranteeing 52-80 centimetre width inner wall surface cleaning, flat, solid, the no greasy dirt of face, no loose and have certain roughness, the adhesion stress with tube wall is criticized at the enhancing end.(annotate: before the hacking in accordance with regulations width line location guarantee the profile standard.)
4, implementing the end criticizes:
Polyalcohol cement basis elastic water-proof film dry powder is added the thick pasty state of water furnishing, completely criticize surface, hacking place with the mud plate, width is each 0.25-0.4M of center with the interface, and thickness is not less than 2mm.(about 1: 4 of gouache ratio)
5, lay grid cloth
Criticize construction the end of at and promptly spread the wide fiberglass gridding cloth of one deck 48-78 centimetre or other chemical fibre grid cloth after about 5~6 hours.Grid cloth girth joining seam should be no less than 10 centimeters, and grid cloth is laid and must be close to the end and pull on, and rake angle can not be arranged, arches upward, phenomenon such as wrinkle, and the grid cloth of pipe top bit is used yoke and supported firmly, prevents sagging falling.
6, face is criticized construction:
Promptly carry out the waterproof face after grid cloth is laid and finished and criticize construction.Polymer concrete dry-powder and polymer cement base emulsion are pressed liquid: powder=4: 5, adopt special electric to stir instrument and constantly stir into uniform mortar shape, must not contain powder ball, grain piece in the mortar shape.Each charging must be removed clout foreign material in the bucket clean.Criticize with the mud plate and to scrape branch three roads and pull on, the fiber mesh cover is not had the end of at.After treating that one waterproof film surface is done, carry out second road again, the 3rd road is criticized and is scraped, this layer composite elastic grid cloth waterproof film thickness of inner lining remains on about 3.5mm, criticize and add face and criticize about the about 6.5mm of gross thickness at the end, two limit mouths are made little chamfering.
7, edge sealing
With solvent-free epoxy resin to waterproof film liner both sides mouth edge sealing, to increase limit mouth adhesion stress and sealing.
8, maintenance
Natural curing water flowing after at least 7 days (with good conditionsi, curing time is longer better).
After above work progress enforcement, just form a kind of not only water-fast but also waterproof in the pipeline, and novel lining material with certain toughness and tensile strength, can resist structure, drainage pipe interface etc. because of the crack of expanding, shrinking or slight disturbance causing, phenomenon such as leak, easy construction, no seam, good integrity, rate of hardening is fast, can with multiple base material secure bond, be applicable to preventive overhaul engineering to drainage pipe.
Claims (5)
1, a kind of method that adopts the waterproof film liner to repair sewer is characterized in that it comprises following concrete steps:
A, sealing leak stopping: with the sewer pipe shutoff, the desilting of drawing water with water under high pressure flush clean tube wall, is sought seepage, breaking point;
B, the solid soil of slip casting: open several grout holes from inside to outside at the pipe joint place, in managing, outwards the soil body outside the pipe joint pipe and the inspection shaft bottom soil body are carried out slip casting, the firm soil body;
C, breaking point are handled: adopt cement to accelerate to burn smart mode to the 1-3mm slit and repair; After adopting the water blockoff mortar to fill out embedding to the 4-10mm sealing, enrich sealing with the polyurethane injection; Adopt filleting technology to repair to the 11-30mm sealing;
D, the waterproof film liner is set: (1), pipe joint surfacing: the inwall with both sides, emery wheel hacking pipe joint center makes it have roughness; (2), implement the end and criticize: criticize at the bottom of scraping pasty state on the inwall of the both sides, pipe joint center of hacking batch, thickness remains on 2-3mm; (3), lay grid cloth: treat the end criticize dry and hard after, lay grid cloth thereon; (4), face is criticized construction: criticize the pulpous state waterproof face of strike-ofing and criticize on grid cloth, thickness remains on 3-4mm;
E, edge sealing: with solvent-free epoxy resin to waterproof film liner both sides mouth edge sealing;
F, maintenance: natural curing water flowing after seven days.
2, restorative procedure according to claim 1 is characterized in that the slurry of being annotated is made into cement, flyash, water glass.
3, restorative procedure according to claim 1 is characterized in that the end criticizes to adopt polymer concrete dry-powder to add water furnishing pasty state.
4, restorative procedure according to claim 1 is characterized in that grid cloth is fiberglass gridding cloth or chemical fibre grid cloth.
5, restorative procedure according to claim 1 is characterized in that face is criticized to adopt polymer concrete dry-powder addition polymerization compound cement based emulsion furnishing pasty state.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200410016365XA CN1296577C (en) | 2004-02-17 | 2004-02-17 | Method for repairing sewer using water-proof film lining |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200410016365XA CN1296577C (en) | 2004-02-17 | 2004-02-17 | Method for repairing sewer using water-proof film lining |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1657718A CN1657718A (en) | 2005-08-24 |
CN1296577C true CN1296577C (en) | 2007-01-24 |
Family
ID=35007409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB200410016365XA Expired - Fee Related CN1296577C (en) | 2004-02-17 | 2004-02-17 | Method for repairing sewer using water-proof film lining |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1296577C (en) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100532746C (en) * | 2007-04-18 | 2009-08-26 | 上海龙日建设开发有限公司 | Underground sewer repairing method |
CN101235632B (en) * | 2007-12-28 | 2010-06-02 | 中国水电顾问集团中南勘测设计研究院 | Grouting leak-stopping technique |
CN102486247B (en) * | 2010-12-02 | 2014-04-09 | 杨兵 | Water supply and drainage pipeline repair technique adopting size film lining method |
CN103243801A (en) * | 2013-04-25 | 2013-08-14 | 安徽建筑工业学院 | Manhole repairing method |
CN103437417B (en) * | 2013-08-24 | 2014-10-22 | 无锡市政设计研究院有限公司 | Part repair structure for steel lining of drainage pipeline |
CN104060586B (en) * | 2014-06-24 | 2016-02-10 | 大连市水利建筑设计院 | A kind of reservoir conveyance tunnel lined steel pipe watertight grouting method |
CN105363767A (en) * | 2015-11-18 | 2016-03-02 | 同济大学 | Extracting and injecting combined three-dimensional prevention and control method used for emergency treatment after soil pollution |
CN109268624B (en) * | 2018-10-19 | 2021-06-11 | 岭澳核电有限公司 | Life-prolonging pipeline structure and preparation method thereof |
CN110617381A (en) * | 2019-09-25 | 2019-12-27 | 郑州大学 | Drainage pipeline cracking local plugging structure, plugging method and repairing method |
CN111536362B (en) * | 2020-04-28 | 2021-11-19 | 江苏绿材谷新材料科技发展有限公司 | Method for grouting and reinforcing fiber grids of large-diameter concrete pipeline lining |
CN112431990B (en) * | 2020-12-11 | 2022-07-29 | 中国水利水电第七工程局成都水电建设工程有限公司 | Method for repairing trenchless coating lining of large-diameter drainage pipeline |
CN112746661B (en) * | 2020-12-30 | 2022-07-15 | 北京城市排水集团有限责任公司 | Small-sized drainage square ditch steel wire framework composite reinforcement and repair system and construction method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1082135A (en) * | 1992-08-11 | 1994-02-16 | 汉斯·穆勒 | Method for repairing underground drainage pipe |
JP2001113600A (en) * | 1999-10-18 | 2001-04-24 | Ashimori Ind Co Ltd | Method for lining pipe line |
KR20010039525A (en) * | 2000-01-26 | 2001-05-15 | 유정식 | Inner Excavation Repairing |
-
2004
- 2004-02-17 CN CNB200410016365XA patent/CN1296577C/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1082135A (en) * | 1992-08-11 | 1994-02-16 | 汉斯·穆勒 | Method for repairing underground drainage pipe |
JP2001113600A (en) * | 1999-10-18 | 2001-04-24 | Ashimori Ind Co Ltd | Method for lining pipe line |
KR20010039525A (en) * | 2000-01-26 | 2001-05-15 | 유정식 | Inner Excavation Repairing |
Also Published As
Publication number | Publication date |
---|---|
CN1657718A (en) | 2005-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1296577C (en) | Method for repairing sewer using water-proof film lining | |
CN111485922A (en) | E L F railway tunnel water leakage, block falling and grout turnover disease treatment method | |
CN106640154A (en) | Treatment method and structure for water seepage of tunnel lining circular construction joint crack | |
CN112431990B (en) | Method for repairing trenchless coating lining of large-diameter drainage pipeline | |
CN206319910U (en) | Infiltration disposal system is reinforced in a kind of tunnel-liner | |
CN110206073B (en) | Waterproof construction method for lattice column pile and main structure joint | |
CN108412016A (en) | Underground tube body assures construction method | |
CN101435192A (en) | New and old concrete combining construction method | |
Morgado et al. | Portuguese irrigation canals: lining solutions, anomalies, and rehabilitation | |
CN110541431A (en) | waterproof structure of pipe gallery and construction method thereof | |
Lea et al. | THE DETERIORATION OF CONCRETE IN STRUCTURES. | |
CN102535493B (en) | Method for constructing inverted type foundation beam | |
CN111335445B (en) | Construction method of concrete catch basin by using steel pipe as inner mold | |
CN114134980A (en) | Preparation method of trench with seepage-proofing function | |
CN113833500B (en) | Restoration method for waterproof and impermeable layer of mountain cave depot | |
RU2669302C1 (en) | Method of repair and sealing of damage in concrete facings of channels | |
CN104975623A (en) | Non-excavation leaking inspection well repairing method and repairing structure | |
CN113700111A (en) | Construction method of rainwater permeation, drainage and reuse integrated system | |
CN208251134U (en) | A kind of foundation structure of acid-resistance infiltration | |
CN219527748U (en) | Waterproof construction structure is synthesized to high water level area anti-floating anchor rod tip | |
CN221608641U (en) | Round pipe culvert basement layer structure | |
CN113846695B (en) | Reverse construction method basement construction method | |
CN1632288A (en) | Method of vulcanized slurry synchronous slip casting for subway shield | |
CN220566739U (en) | Socket joint formula cement drain pipe | |
CN219430841U (en) | Waterproof structure for upstream surface of underground diaphragm wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20070124 Termination date: 20100217 |