CN107563564A - A kind of efficiency estimation method of wind power plant scheduling process - Google Patents

A kind of efficiency estimation method of wind power plant scheduling process Download PDF

Info

Publication number
CN107563564A
CN107563564A CN201710827618.9A CN201710827618A CN107563564A CN 107563564 A CN107563564 A CN 107563564A CN 201710827618 A CN201710827618 A CN 201710827618A CN 107563564 A CN107563564 A CN 107563564A
Authority
CN
China
Prior art keywords
index
power plant
wind power
effectiveness
wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710827618.9A
Other languages
Chinese (zh)
Inventor
魏善碧
柴毅
何馨
何昊阳
刘延兴
孙秀玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201710827618.9A priority Critical patent/CN107563564A/en
Publication of CN107563564A publication Critical patent/CN107563564A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/90Financial instruments for climate change mitigation, e.g. environmental taxes, subsidies or financing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Wind Motors (AREA)

Abstract

The invention discloses a kind of efficiency estimation method on wind power plant performance, the data inputting master database of wind power plant operation in 24 hours, then carry out data analysis and reject invalid information extraction effective information, and 24 different wind power curves are made according to the wind power plant data of 24 hours, the measures of effectiveness of wind power plant generating is finally made according to different curves.Measures of effectiveness mainly assesses the security, stability and accuracy of the wind power plant generated output.The energy comprehensive evaluation index of wind power plant is calculated according to comprehensive effectiveness desired value.The master data that wind-powered electricity generation is run is included in database, the measures of effectiveness of wind power plant and separate unit blower fan can be carried out simultaneously, the economic benefit to be generated electricity to wind-powered electricity generation has very high practical value.

Description

A kind of efficiency estimation method of wind power plant scheduling process
Technical field
A kind of efficiency estimation method on wind power plant scheduling process
Technical background
The kinetic energy that wind-power electricity generation refers to keep watch switchs to electric energy.Wind is a kind of energy without public hazards, non-using wind-power electricity generation Chang Huanbao, and can caused by electric energy it is very huge, therefore increasing country more payes attention to wind-power electricity generation.Wind energy is as one The regenerative resource of kind cleaning, is increasingly paid attention to by countries in the world.Its amount of accumulateing is huge, and global wind energy is about 2.74 × 10 ^9MW, wherein available wind energy is 2 × 10^7MW, the water energy total amount than that can be developed on the earth is also big 10 times.
Wind-powered electricity generation has the characteristics of randomness, intermittence, fluctuation, cut in and out, when it is big when it is small, it is difficult to predict, so wind The efficiency of electric field electricity-generating, which differs, can be bonded standard completely.The invention is given birth under historical background because of fortune, and wind power plant, which generates electricity, imitates It is imperative to assess.Measures of effectiveness, it is good to certain things or the quality of a certain item task result of system execution or process to refer to The quantum chemical methods of efficiency index such as bad, effect size, oneself state or conclusive evaluation, are not only only capable of to wind power plant generating effect Assessed, at the same also can separate unit fan efficiency tested.
The content of the invention
To solve the shortcomings of the prior art, the invention discloses a kind of measures of effectiveness side of wind power plant scheduling process Method, the master data that wind-powered electricity generation is run is included in database, the efficiency index of wind power integration is integrated, not only can be to wind-powered electricity generation Field carries out measures of effectiveness, and the effect of measures of effectiveness can be also reached to separate unit blower fan, obtains the synthesis of economic benefit for covering wind-powered electricity generation Assessment indicator system, there is very high practical value.
To achieve the above object, concrete scheme of the invention is as follows:
A kind of efficiency estimation method on wind power plant scheduling performance, it is characterized in that, comprise the following steps:
Step 1:The round-the-clock data of wind power plant are gathered, and are classified by the hour;
Step 2:The hour data of wind power plant 24 is analyzed, rejects invalid information, draws 24 wind-power electricity generation power curve, meter Calculate overshoot σ %, time to peak tp, adjustment time ts, peak value Pmax, the deviation Δ of peak value and setting value, actual general power with The difference Δ p of preferable general power;
Step 3:Respectively according to security, stability, accuracy, wind power plant scheduling process measures of effectiveness is carried out, is calculated comprehensive Close efficiency index value.
A kind of efficiency estimation method on wind power plant wind turbine scheduling process, it is characterized in that, comprise the following steps:
Step 1:The round-the-clock data of separate unit are gathered, and are classified by the hour;
Step 2:The hour data of separate unit 24 is analyzed, rejects invalid information.Because the separate unit blower fan all weather operations time differs It is set to 24 hours, so removing T hour of non-working time, is left hour working time 24-T.Draw 24-T bar wind-power electricity generations Power curve, calculate overshoot σ %, average peak time tp, adjustment time ts, peak value Pmax, the deviation of peak value and setting value The difference Δ p of Δ, actual general power and preferable general power;
Step 3:Separate unit fan safe, stability, stability measures of effectiveness are carried out, separate unit is calculated according to efficiency index Fan comprehensive efficiency index value.
Brief description of the drawings
Fig. 1 is a kind of system construction drawing of efficiency estimation method on wind power plant performance of the present invention.
Fig. 2 wind power plant scheduling process curves and indicatrix
Fig. 3 wind-powered electricity generation separate unit blower fan scheduling process curves and indicatrix
Embodiment
1. a kind of efficiency estimation method on wind power plant scheduling performance, it is characterized in that, comprise the following steps:
Step 1:The round-the-clock data of wind power plant are gathered, and are classified by the hour;
Step 2:The hour data of wind power plant 24 is analyzed, rejects invalid information, draws 24 wind-power electricity generation power curve, meter Calculate overshoot σ %, time to peak tp, adjustment time ts, peak value Pmax, the deviation Δ of peak value and setting value, actual general power with The difference Δ p of preferable general power;
Step 3:Respectively according to security, stability, accuracy, wind power plant scheduling process measures of effectiveness is carried out, is calculated comprehensive Close efficiency index value.
2. a kind of efficiency estimation method on wind power plant performance, for security, stability, accuracy, it is characterized in that: Establish the grade collection of the following index of measures of effectiveness step:
(1) step 1:Establish the grade collection of effectiveness evaluation index:Using overshoot σ % as first order index set:ω= {ω123...ω24};By peak value and the deviation Δ second level index set of setting value:Δ={ Δ123... Δ24};
(2) step 2:Establish the weight sets of security effectiveness evaluation index:In order to which each index is for the important of system Property, it is necessary to establish the corresponding weight of index.The weight vectors for setting up overshoot index set are X1={ x1,1,x1,2, ...x1,24, the weight vectors X of the deviation Δ index set of peak value and setting value2={ x2,1,x2,2,...x2,24};
(3) step 3:Establish the alternative collection of security effectiveness evaluation index:Evaluation effect is carried out to the system according to expert Fruit, various evaluation effects constitute alternative collection.Hypothesis evaluation result has s, then alternative collection V1={ v11,v12,...v1s}。
(4) step 4:Establish the single factor judgment matrix of security effectiveness evaluation index:With peak value and the deviation of setting value It is worth the single factor test index Δ of Δ index set2, jTo determine degree of membership of the system relative to alternative collection unit, to index of different nature Fuzzy vector should differently be calculated.If single factor test index Δ2j(j=1,2...n) relative to alternative collection V1Middle element Fuzzy membership vector R2j=(rj1,rj2,...,rjp), wherein ∑ rjk=1, rjk>=0 (j=1,2 ..., n;K=1,2 ..., p).With the single factor judgment matrix Δ that other single index fuzzy vectors are row construction second level evaluation indice2(n×p)
(5) step 5:Establish the Comprehensive Evaluation of security effectiveness evaluation index:The weight matrix X of second level index2With list Factor Judgement Matrix Δ2Product as peak value and the Comprehensive Evaluation result Y of the deviation Δ of setting value2.To Y2It is weighted, Z=X1×Y2(b11,b12,...b1p) be the system fuzzy comprehensive evoluation;
(6) step 6:According to maximum membership degree rule, by the v of alternative collectionn1(n1For b11,b12,...b1pMiddle maximum Subscript) comprehensive effectiveness result as the system.
3. a kind of efficiency estimation method on wind power plant wind turbine scheduling process, it is characterized in that, comprise the following steps:
Step 1:The round-the-clock data of separate unit are gathered, and are classified by the hour;
Step 2:The hour data of separate unit 24 is analyzed, rejects invalid information.Because the separate unit blower fan all weather operations time differs It is set to 24 hours, so removing T hour of non-working time, is left hour working time 24-T.Draw 24-T bar wind-power electricity generations Power curve, calculate overshoot σ %, average peak time tp, adjustment time ts, peak value Pmax, the deviation of peak value and setting value The difference Δ p of Δ, actual general power and preferable general power;
Step 3:Separate unit fan safe, stability, stability measures of effectiveness are carried out, separate unit is calculated according to efficiency index Fan comprehensive efficiency index value.
4. a kind of efficiency estimation method on wind power plant wind turbine scheduling process, it is characterized in that:Establish security, steady Qualitative, the following index of accuracy measures of effectiveness step grade collection:
(1) step 1:Establish the grade collection of security effectiveness evaluation index:Using overshoot σ % as first order index set: ω={ ω123...ω24-T};By peak value and the deviation Δ second level index set of setting value:Δ={ Δ12, Δ3...Δ24-T};
(2) step 2:Establish the weight sets of security effectiveness evaluation index:In order to which each index is for the important of system Property, it is necessary to establish the corresponding weight of index.The weight vectors for setting up overshoot index set are X1={ X1,1,X1,2, ...X1,(24-T), the weight vectors X of the deviation Δ index set of peak value and setting value2={ X2,1,X2,2,...X2,(24-T)};
(3) step 3:Establish the alternative collection of security effectiveness evaluation index:Evaluation effect is carried out to the system according to expert Fruit, various evaluation effects constitute alternative collection.Hypothesis evaluation result has s', then alternative collection V1={ v11,v12,...v1s'}。
(4) step 4:Establish the single factor judgment matrix of security effectiveness evaluation index:With peak value and the deviation of setting value It is worth the single factor test index Δ of Δ index set2, jTo determine degree of membership of the system relative to alternative collection unit, to index of different nature Fuzzy vector should differently be calculated.If single factor test index Δ2j(j=1,2...n) relative to alternative collection V1Middle element Fuzzy membership vector R2j=(rj1,rj2,...,rjp), wherein ∑ rjk=1, rjk>=0 (j=1,2 ..., n;K=1,2 ..., p).With the single factor judgment matrix Δ that other single index fuzzy vectors are row construction second level evaluation indice2(n×p)
(5) step 5:Establish the Comprehensive Evaluation of security effectiveness evaluation index:The weight matrix X of second level index2With list Factor Judgement Matrix Δ2Product as peak value and the Comprehensive Evaluation result Y of the deviation Δ of setting value2.To Y2It is weighted, Z=X1×Y2(b11,b12,...b1p) be the system fuzzy comprehensive evoluation;
(6) step 6:According to maximum membership degree rule, by the v of alternative collectionn1(n1For b11,b12,...b1pMiddle maximum Subscript) comprehensive effectiveness result as the system.

Claims (3)

1. it is a kind of on wind power plant and the efficiency estimation method of fan performance, it is characterized in that, comprise the following steps:
Step 1:The round-the-clock data of wind power plant are gathered, and are classified by the hour;
Step 2:The hour data of wind power plant 24 is analyzed, rejects invalid information, draws 24 wind-power electricity generation power curve, is calculated super Tune amount σ %, time to peak tp, adjustment time ts, peak value Pmax, the deviation Δ of peak value and setting value, actual general power with it is preferable The difference Δ of general powerp
Step 3:Carry out wind-power electricity generation security, stability, accuracy measures of effectiveness.
2. it is a kind of on wind power plant and the efficiency estimation method of blower fan, it is characterized in that:Establish security, stability, accuracy effect The grade collection of the energy following index of appraisal procedure:
(1) step 1:Establish the grade collection of security effectiveness evaluation index:Using overshoot σ % as first order index set:ω= {ω123...ω24};By peak value and the deviation Δ second level index set of setting value:Δ={ Δ123... Δ24};
(2) step 2:Establish the weight sets of effectiveness evaluation index:For each index for the importance of system, it is necessary to establish The individual corresponding weight of index.The weight vectors for setting up overshoot index set are X1={ x1,1,x1,2,...x1,24, peak value and setting The weight vectors X of the deviation Δ index set of value2={ x2,1,x2,2,...x2,24};
(3) step 3:Establish the alternative collection of effectiveness evaluation index:Evaluation effect, various evaluations are carried out to the system according to expert Effect constitutes alternative collection.Hypothesis evaluation result has s, then alternative collection V1={ v11,v12,...v1s}。
(4) step 4:Establish the single factor judgment matrix of effectiveness evaluation index:With peak value and the deviation Δ index set of setting value Single factor test index Δ2, jTo determine degree of membership of the system relative to alternative collection unit, difference should be used to index of different nature Method calculates fuzzy vector.If single factor test index Δ2j(j=1,2...n) relative to element in alternative collection V fuzzy membership to Measure R3j=(rj1,rj2,...,rjp), wherein ∑ rjk=1, rjk>=0 (j=1,2 ..., n;K=1,2 ..., p).With other lists Item index Fuzzy vector constructs the single factor judgment matrix Δ of second level evaluation indice for row2(n×p)
(5) step 5:Establish the Comprehensive Evaluation of effectiveness evaluation index:The weight matrix X of second level index2With simple element evaluation square Battle array Δ2Product as peak value and the Comprehensive Evaluation result Y of the deviation Δ of setting value2.To Y2It is weighted, Z=X1×Y2 (b1,b2,...bp) be the system fuzzy comprehensive evoluation;
(6) step 6:According to maximum membership degree rule, by the v of alternative collectionn(n b1,b2,...bpThe subscript of middle maximum) conduct The comprehensive effectiveness result of the system.
3. from the security of wind power plant scheduling process, stability, the angle of accuracy, different angle measures of effectiveness is carried out.By wind The measures of effectiveness of electricity scheduling navigates to fan operation, and Operating ettectiveness is analyzed so as to different scale.
CN201710827618.9A 2017-09-14 2017-09-14 A kind of efficiency estimation method of wind power plant scheduling process Pending CN107563564A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710827618.9A CN107563564A (en) 2017-09-14 2017-09-14 A kind of efficiency estimation method of wind power plant scheduling process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710827618.9A CN107563564A (en) 2017-09-14 2017-09-14 A kind of efficiency estimation method of wind power plant scheduling process

Publications (1)

Publication Number Publication Date
CN107563564A true CN107563564A (en) 2018-01-09

Family

ID=60980903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710827618.9A Pending CN107563564A (en) 2017-09-14 2017-09-14 A kind of efficiency estimation method of wind power plant scheduling process

Country Status (1)

Country Link
CN (1) CN107563564A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108596474A (en) * 2018-04-23 2018-09-28 国网经济技术研究院有限公司 Power grid engineering operation benefit evaluation method and system capable of meeting power consumption requirements
CN108960688A (en) * 2018-08-30 2018-12-07 北京光耀电力科技股份有限公司 A kind of total management system of Wind turbines
CN110006624A (en) * 2019-05-23 2019-07-12 重庆大学 The physical simulating method that Background wind is coupled with mobile cyclone
CN110378555A (en) * 2019-06-11 2019-10-25 重庆大学 One kind being directed to wind power plant power dispatching process efficiency estimation method
CN116433073A (en) * 2023-02-23 2023-07-14 华北电力大学 Wind power plant operation efficiency evaluation method, device, equipment and medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102097828A (en) * 2010-12-30 2011-06-15 中国电力科学研究院 Wind power optimal scheduling method based on power forecast
CN106899035A (en) * 2017-03-15 2017-06-27 中国电力科学研究院 Inversion system participates in the appraisal procedure and device of grid-connected rear power distribution network Operating ettectiveness

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102097828A (en) * 2010-12-30 2011-06-15 中国电力科学研究院 Wind power optimal scheduling method based on power forecast
CN106899035A (en) * 2017-03-15 2017-06-27 中国电力科学研究院 Inversion system participates in the appraisal procedure and device of grid-connected rear power distribution network Operating ettectiveness

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
万杰: "基于SCADA数据的风电机组运行状态评估方法研究", 《中国优秀硕士学位论文全文数据库》 *
刘昊等: "基于运行数据的风力发电机组性能评估方法", 《第五届亚洲风能大会论文集》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108596474A (en) * 2018-04-23 2018-09-28 国网经济技术研究院有限公司 Power grid engineering operation benefit evaluation method and system capable of meeting power consumption requirements
CN108960688A (en) * 2018-08-30 2018-12-07 北京光耀电力科技股份有限公司 A kind of total management system of Wind turbines
CN110006624A (en) * 2019-05-23 2019-07-12 重庆大学 The physical simulating method that Background wind is coupled with mobile cyclone
CN110006624B (en) * 2019-05-23 2020-01-17 重庆大学 Physical simulation method for coupling background wind and mobile tornado
CN110378555A (en) * 2019-06-11 2019-10-25 重庆大学 One kind being directed to wind power plant power dispatching process efficiency estimation method
CN116433073A (en) * 2023-02-23 2023-07-14 华北电力大学 Wind power plant operation efficiency evaluation method, device, equipment and medium

Similar Documents

Publication Publication Date Title
CN107563564A (en) A kind of efficiency estimation method of wind power plant scheduling process
Wang et al. Decision tree based online stability assessment scheme for power systems with renewable generations
CN109376801B (en) Wind driven generator blade icing diagnosis method based on integrated deep neural network
CN104485665B (en) Meter and the dynamic probability trend computational methods of forecasting wind speed error temporal correlation
CN103870923B (en) The wind energy turbine set group of planes polymerization of coagulation type hierarchical clustering algorithm based on comentropy
Yılmaz et al. A statistical approach to estimate the wind speed distribution: the case of Gelibolu region
Zaharim et al. Analyzing Malaysian wind speed data using statistical distribution
CN104951834A (en) LSSVM (least squares support vector machine) wind speed forecasting method based on integration of GA (genetic algorithm) and PSO (particle swarm optimization)
CN108667069A (en) A kind of short-term wind power forecast method returned based on Partial Least Squares
CN109447441B (en) Transient stability risk assessment method considering uncertainty of new energy unit
CN103278326A (en) Method for diagnosing faults of wind generating set gear case
CN106229972A (en) A kind of integrated based on many meteorological sources and the wind power forecasting method of segmentation modeling
CN107701378A (en) A kind of wind-driven generator fault early warning method
CN101871948A (en) System and method for predicting wind speed of wind farm
CN108154260A (en) A kind of short-term wind power forecast method
CN105825002B (en) A kind of wind power plant dynamic equivalent modeling method based on dynamic Gray Association Analysis
CN106768933A (en) A kind of wind power generation unit blade method for diagnosing faults based on genetic algorithm
Badawi et al. Weibull probability distribution of wind speed for gaza strip for 10 years
Viet et al. A short-term wind power forecasting tool for vietnamese wind farms and electricity market
CN104218571B (en) A kind of running status appraisal procedure of wind power plant
Sun et al. A powerful Bio-Inspired optimization algorithm based PV cells diode models parameter estimation
Gökçekuş et al. Evaluation of wind potential at eight selected locations in Northern Lebanon using open source data
CN103489132A (en) Wind power plant reliability evaluating system
Bhowmik et al. Green energy sources selection for sustainable energy planning using multi-criteria decision-making approach
Zheng et al. Characteristics for wind energy and wind turbines by considering vertical wind shear

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180109