CN104112235B - The method and system of nuclear power projects Experience Feedback information search - Google Patents
The method and system of nuclear power projects Experience Feedback information search Download PDFInfo
- Publication number
- CN104112235B CN104112235B CN201310140751.9A CN201310140751A CN104112235B CN 104112235 B CN104112235 B CN 104112235B CN 201310140751 A CN201310140751 A CN 201310140751A CN 104112235 B CN104112235 B CN 104112235B
- Authority
- CN
- China
- Prior art keywords
- experience feedback
- feedback information
- control unit
- identification code
- experience
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of method of nuclear power projects Experience Feedback information search, including:Nuclear power projects are decomposed according to the work breakdown structure (WBS) WBS pre-established to obtain each control unit;According to the identification information of the control unit of current operation, the Experience Feedback message identification code of control unit is obtained;The rule of thumb Experience Feedback information of feedback information identification code search control unit.Compared with the prior art, the method for nuclear power projects Experience Feedback information search of the present invention realizes the quick of Experience Feedback information in nuclear power projects and finds and search.In addition, the invention also discloses a kind of systems of nuclear power projects Experience Feedback information search.
Description
Technical field
The invention belongs to technical field of nuclear power, it is more particularly related to a kind of nuclear power projects Experience Feedback information
The method and system of search.
Background technology
Chinese Guangdong nuclear power group has adhered to the side of " safety first, quality first, pursues being outstanding " always since establishment
Pin, to make gold medal foundation enterprise of the same trade as target, on the basis of successfully Daya Bay nuclear power plant is built, by will go into operation
The benefit that nuclear power station generates develops new nuclear power projects as capital input, forms Good Circle System.At present, China is wide
Eastern nuclear power Group Co., Ltd constantly in theoretical power station, have both engineering consulting and the compound (Architect of technical support
Engineering, AE) type wisdom power station is concentrated on studies, and obtains many breakthroughs to attract people's attention in many fields of nuclear power, it captures
Many technical barriers, have filled up domestic and international blank.
Nuclear power projects construction is the system engineering that one extremely complex, degree-of-difficulty factor is larger, and the operation number of project is with 100,000
Meter, design (Engineering), buying (Procurement), construction (Construction), debugging (Start-up) etc. is each
Stage be related to specialty it is various, work post is complicated.Due to the complexity of nuclear power technology, nuclear power projects engineering construction and operation process
The middle experience and lessons that can be generated substantial amounts of anomalous event and have reference value, these information can apply to project construction and operation
Subsequent process, and provide reference for evading for similar problems in other nuclear power projects, which is exactly Experience Feedback.In experience
In feedback management system, these anomalous events and good practice typically at least correspond to an information record, which is referred to as to pass through
Test feedback information.International at present, domestic nuclear power plant's operation and the construction of construction unit's Experience Feedback system and function situation are not to the utmost
It is identical, Experience Feedback system design aspect there is also larger difference, most units are using Experience Feedback information as one kind
Document implements Experience Feedback management with the mode of document management.User is believed by the title of search file to inquire about Experience Feedback
Breath, since document management lays particular emphasis on the filing of information, the information content of Experience Feedback information record is extremely limited, as experience is anti-
It is more and more to present entry number, it is increasingly longer by search file process, meanwhile, user must exist understanding Experience Feedback information
On the premise of, and carry out retrieval and be only possible to obtain Experience Feedback information, cause to obtain Experience Feedback information process complexity, retrieval effect
Rate is poor, how during nuclear power projects management, quick lookup, retrieval is realized in increasing posterior infromation, is urgently
It solves the problems, such as.
The content of the invention
It is an object of the invention to:A kind of development process in nuclear power projects is provided, can quickly realize lookup, retrieval core
The history management record or experience of electric project.
In order to realize foregoing invention purpose, the present invention provides a kind of method of nuclear power projects Experience Feedback information search,
The described method includes:
Nuclear power projects are decomposed according to the work breakdown structure (WBS) WBS pre-established to obtain each control unit;
According to the identification information of the control unit of current operation, the Experience Feedback message identification code of control unit is obtained;
The rule of thumb Experience Feedback information of feedback information identification code search control unit.
A kind of improvement of method as nuclear power projects Experience Feedback information search of the present invention, the Experience Feedback information are known
Other code includes at least one kind in time identification code, entity identifier, business identification code and value identification code.
A kind of improvement of method as nuclear power projects Experience Feedback information search of the present invention, the method further include:If
The accuracy of Experience Feedback information is put, the experience according to Experience Feedback message identification code acquisition described control unit is anti-
Feedforward information is specifically, the Experience Feedback that accuracy is corresponded to according to Experience Feedback message identification code acquisition described control unit is believed
Breath.
A kind of improvement of method as nuclear power projects Experience Feedback information search of the present invention, the method further include:
If the Experience Feedback information is two or more, the Experience Feedback information is ranked up according to reference value.
A kind of improvement of method as nuclear power projects Experience Feedback information search of the present invention, it is described anti-according to the experience
Feedforward information is managed described control unit, including:
Described control unit is operated according to the Experience Feedback information, and the new experience formed after this time operation is anti-
Feedforward information.
A kind of improvement of method as nuclear power projects Experience Feedback information search of the present invention, the method further include:
Periodically Experience Feedback information is updated, and according to reference value more new sort.
In order to realize foregoing invention purpose, what it is the present invention also provides a kind of nuclear power projects Experience Feedback information search is
System, the system comprises:
Decomposing module, for being decomposed to obtain each control to nuclear power projects according to the work breakdown structure (WBS) WBS pre-established
Unit processed;
Acquisition module for the identification information of the control unit according to current operation, obtains the experience of described control unit
Feedback information identification code;
Search module is believed for searching for the Experience Feedback of described control unit according to the Experience Feedback message identification code
Breath.
A kind of improvement of system as nuclear power projects Experience Feedback information search of the present invention, what the acquisition module obtained
Experience Feedback message identification code is included at least in time identification code, entity identifier, business identification code and value identification code
It is a kind of.
A kind of improvement of system as nuclear power projects Experience Feedback information search of the present invention, system further include:
Setup module, it is described according to the Experience Feedback message identification code for setting the accuracy of Experience Feedback information
The Experience Feedback information of described control unit is obtained specifically, obtaining the control list according to the Experience Feedback message identification code
The Experience Feedback information of the corresponding accuracy of member.
A kind of improvement of system as nuclear power projects Experience Feedback information search of the present invention, system further include:
Sorting module, if being two or more for the Experience Feedback information, by the Experience Feedback information according to reference
Value is ranked up.
A kind of improvement of system as nuclear power projects Experience Feedback information search of the present invention, system further include:
Sorting module for being operated according to the Experience Feedback information to described control unit, and forms this behaviour
New experience feedback information after work.
A kind of improvement of system as nuclear power projects Experience Feedback information search of the present invention, system further include:
Update module, for being periodically updated to Experience Feedback information, and according to reference value more new sort.
Compared with prior art, the method and system of nuclear power projects Experience Feedback information search of the present invention has beneficial below
Technique effect:Nuclear power projects are decomposed according to the work breakdown structure (WBS) WBS pre-established to obtain each control unit, further according to
The identification information of the control unit of current operation obtains the Experience Feedback message identification code of current control unit, finally according to institute
The Experience Feedback information that Experience Feedback message identification code obtains described control unit is stated, and according to the Experience Feedback information to institute
Control unit is stated to be managed.It realizes to the historical operation record of each control unit in nuclear power projects operation process or history behaviour
Make experience or Experience Feedback information is quickly transferred, and according to historical operation record or historical operation experience or Experience Feedback information
It records and carries out effective, reference formula management.Breach nuclear power projects Experience Feedback acquisition of information it is slow, using limited bottleneck, fill up
Domestic and international blank in nuclear power projects operating process.Simultaneously as Experience Feedback message identification code is identified including at least the time
One kind in code, entity identifier, business identification code and value identification code, i.e. multidimensional mark Experience Feedback information, make experience
Feedback information can rapidly be retrieved in the database of magnanimity.Further, since sorting out value has been carried out to Experience Feedback information,
The subsequent operation of nuclear power projects is greatly facilitated, efficient Experience is provided for subsequent operation.
Description of the drawings
With reference to the accompanying drawings and detailed description, nuclear power projects progress measurement method and system of the present invention is carried out detailed
Illustrate, wherein:
Fig. 1 provides a kind of flow chart of method one embodiment of nuclear power projects Experience Feedback information search.
Fig. 2 provides the flow chart of another embodiment of a kind of method of nuclear power projects Experience Feedback information search.
Fig. 3 provides a kind of structure chart of system one embodiment of nuclear power projects Experience Feedback information search.
Fig. 4 provides a kind of structure chart of another embodiment of the system of nuclear power projects Experience Feedback information search.
Specific embodiment
In order to which the goal of the invention, technical solution and its advantageous effects that make the present invention become apparent from, below in conjunction with attached drawing
And specific embodiment, the present invention will be described in further detail.It should be appreciated that the specific reality described in this specification
Mode is applied just for the sake of explaining the present invention, is not intended to limit the present invention.
Work breakdown structure (WBS) (Work Breakdown Structure, WBS) is the important technology of project management.WBS with
For deliverable achievement to be oriented to the grouping carried out to project elements, the entire working range for concluding and defining project often declines one layer
Represent the more detailed definition to project work.In Project Management, WBS is important content.WBS is always at planning
The center of journey and the important base for formulating schedule, resource requirement, cost budgeting, Risk Management Plan and procurement plan etc.
Plinth.WBS is also the important foundation of item controlled change simultaneously.Scope of project is defined by WBS, so WBS is also an item
Purpose synthesis tool.
WBS is the noun being made of 3 key elements:It works (work);It decomposes (breakdown);Structure
(structure).According to these concepts, WBS has the corresponding Components corresponding:Structured coding, saddlebag, WBS members
Element.
Structured coding, coding are most notable and most critical WBS Components, are encoded first for WBS is thorough
Structuring.By coding scheme, we can readily identify the hierarchical relationship, packet class and characteristic of WBS elements.And by
In the development of modern computer technology, coding actually makes WBS information and organizational information, cost data, progress data, conjunction
Same information, product data, report information etc. closely connect.Saddlebag, saddlebag (work package) be WBS most
Bottom element, general saddlebag are minimum " deliverable achievements ", these deliverable achievements, which readily recognize, completes its
Activity, cost and tissue and resource information.Such as:Pipe fitting bag may contain support of pipelines and make in nuclear power projects
With installation, pipeline connect with installation, tightness inspection etc. several activities;Include transport/welding/pipeline manufacturing artificial expense, pipe
The costs such as road/metal-ware fee of material;Report/the inspection result generated in the process etc. document;And allocated work team's group
Etc. responsibilities be responsible for a task until it is completed information etc..These exactly above-mentioned tissue/cost/progress/performance informations make saddlebag or even WBS become item
The basis of mesh management.Based on above-mentioned viewpoint, a WBS for project management, which must be broken down into work package level, to be made
It becomes an effective management tool.WBS elements, WBS elements are actually " node " one by one in WBS structures, are led to
The understanding of custom is exactly " box " one by one on " organization chart ", these boxes represent it is independent, with membership/remittance
" deliverable achievement " of total relation.Most of summary by many decades tissue tend to WBS structures must and project objective
It is related, it is necessary to towards final products or deliverable achievement.
Relational language:
Nuclear power projects refer to that needs are a certain amount of in regular hour and certain budgetary institute expected purpose to be achieved
Nuclear power is invested, and by decision-making and implements a series of programs of (design, construction etc.), to form nuclear power under certain constraints
Assets.
Progress refers to the progress (espespecially calendar events progress) of work in every in nuclear power projects implementation process, also refers to project
The arrangement that work in every is made in terms of calendar events progress in implementation.
Milestone refers to the state or mark of certain pre-set expression impressive progress in an activity.It does not disappear
Cost source, cycle zero.
Progress measurement, on the premise of milestone is defined, to the calendar events of work in every in the project implementation process
The tracking and detection carried out with progress in kind, to understand the control process of its development situation at any time.
Weight, definition statistically.Some saddlebag or subitem are refered in particular in nuclear power projects under same definition
Account for the percentage of entire project.
Saddlebag, relatively independent, complete work management object, it includes a series of management characteristics (content, step and mark
Standard etc.), the minimum level-one basic task unit that can be managed, control and detect.Saddlebag can be a specific operation,
It can also be the set of several synchronous or nonsynchronous operation.
Nuclear power projects progress rate measurement system decomposes nuclear power projects according to the work breakdown structure (WBS) WBS pre-established
Obtain control unit;And control unit progress is formed with reference to graduation apparatus;Each control unit is read in corresponding progress with reference to graduation apparatus
On numerical value, each numerical value is carried out according to progress measurement sample table nuclear power projects progress rate is calculated.
Work breakdown structure (WBS) (WBS) is the grouping or decomposition carried out using deliverable achievement as guiding to project elements.WBS is
The important foundation of schedule, resource requirement, cost budgeting, Risk Management Plan and procurement plan etc. is formulated, while is also real
The important foundation of existing Experience Feedback.By the decomposition of WBS structures and meet the needs of management, determine to grasp in some appropriate level
The control unit of work namely the base unit of operation object are, it is necessary to which explanation is that the selection of control unit will not necessarily take
The bottom of WBS structures can choose control unit in the arbitrary level of WBS as needed.
Establish the earned value management system of a set of suitable nuclear power engineering project characteristic, it is necessary first to grasp in project management
Cost input feature:For AE PLC itself be mainly people input, including bidding agency, Manufacturing Supervision, site supervision
Etc. cost inputs, some cost input be business of entrusting outside company, i.e., with contract form external unit is entrusted to carry out reality
Body design, device fabrication and the cost of engineering construction.Thus to the division of WBS levels and control unit also by own service and outer
Committee's business is divided.Wherein, contract management is mainly based upon for outer committee's business, using every part of contract as control unit.
Substantial amounts of anomalous event can be generated during Experience Feedback information, nuclear power projects engineering construction and operation and has history
Operating experience/record information, these information can use project construction and operation subsequent process, and follow-up maintenance this
Mesh provides reference for evading for similar problems in other nuclear power projects, which is exactly Experience Feedback.In Experience Feedback management
In system, the processing procedure of these anomalous events or operation note typically at least correspond to an information record, which claims
Be Experience Feedback information.
Fig. 1 provides a kind of one embodiment of the method for nuclear power projects Experience Feedback information search.It specifically includes:
Step 101, nuclear power projects are decomposed according to the work breakdown structure (WBS) WBS pre-established to obtain each control list
Member;
The work breakdown structure (WBS) of nuclear power projects is pre-established, this is to establish the basis for efficiently using Experience Feedback.It is Chinese wide
Eastern nuclear power group has had developed a set of various dimensions WBS decomposed based on power station entity.Meanwhile original Daya Gulf, ridge Australia one
It phase and has been provided at present in the statistics for building the relatively horn of plenty of projects for the workload or job schedule of quantization project
The data of power are supported.Nuclear power projects are using control unit as basic operation object, you can realize the accurate positionin and survey of project process
Amount.
Step 103, according to the identification information of the control unit of current operation, the Experience Feedback for obtaining described control unit is believed
Cease identification code;
After nuclear power projects are decomposed into control unit, each control unit still has many essential attributes, including control unit
In functions of the equipments coding, device class information, region information, place workshop information, institute's Home System information, belonged to
Purchase package informatin etc..These information can become the identification information of control unit.It, can when operating personnel's operation control unit
To show the identification information of the control unit.
The Experience Feedback message identification code of the control unit can be obtained by the identification information of control unit.
The substance of Experience Feedback information includes:Title, heap-type, unit, time of origin, make a report on unit, make a report at project
People, event description, take measures, the contents such as Experience Feedback and precautionary measures at the analysis of causes, and the requirement of multidimensional labelling technique is in this base
By Experience Feedback information preparation personnel or Experience Feedback administrative staff report is carried out on plinth following classification go forward side by side a step mark and
Specification.
Can by the essential information of Experience Feedback information, as title, heap-type, project, unit, time of origin, make a report on unit,
Reporter, event description, take measures, the empirically feedback information identification code such as Experience Feedback and precautionary measures at the analysis of causes,
Corresponding Experience Feedback information is identified by Experience Feedback message identification code.Experience Feedback message identification code specifically can include with
Lower classification:
1) time class Experience Feedback message identification code:
It specifically includes:The calendar Time of Day of event generation, control unit event occur to save compared with key in control unit
The relative time of point (takes nuclear island the first tank concreting time, i.e. FCD in Nuclear power project field, subsequent descriptions are signified
Relative time refer both to relative time compared with FCD unless otherwise noted);Prevent the relative time node of the problem;Verification
The relative time node whether problem is repaired.
2) entity class Experience Feedback message identification code:
It specifically includes:System, workshop, region, device class, functions of the equipments coding, buying bag in control unit.Due to each
The dividing mode difference of nucleoid pile type is, it is necessary to provide different specific classification options according to type.
3) service class Experience Feedback message identification code:
It specifically includes:Corresponding specialty in control unit, corresponding work breakdown structure (WBS).Corresponding specialty refers to report and is retouched
The event or the career field of the prime responsibility unit of good practice stated, such as:Construction management/civil engineering/nuclear island civil engineering, usual core
Electric project construction, the specialty of operation process are divided into 3-4 layers of layered structure, and the specific classification options of mark, which can pass through, to be configured
It is extended and perfect.Corresponding work breakdown structure (WBS), which refers to, reports that the specific works that described event or good practice occur are lived
It is dynamic, it is desirable that the 4th layer of work breakdown structure (WBS) is at least corresponded in key words sorting.
4) it is worth class Experience Feedback message identification code:
It specifically includes:The risk assessment of control unit, application value assessment.Risk assessment mark is a two-dimensional marker,
The influence classification (very big or middle, very low) brought and possibility occurrence (very high, in, very low) are occurred repeatedly including event.Using
Value assessment is the subjective assessment that key words sorting staff includes information to the report of Experience Feedback event, is commented according to its value
Estimate and be divided into from high to low 5 grades (1~5), the subsequent closed-loop control requirement of information of corresponding different application value is distinguished.It is different
The meaning of application value assessment, 1:Precautionary measures need to be formulated and implemented;2:Skilled addressee is needed to pay close attention to and train;3:Need correlation
Professional knows;4:For reference;5:Without application value.
Step 105, the Experience Feedback information of described control unit is searched for according to the Experience Feedback message identification code.
Specifically, the entity mapping or activity of the identification information and Experience Feedback message identification code for establishing control unit are reflected
It penetrates, the identification information of operation control unit is wanted by work at present, obtain the Experience Feedback information identification of current control unit
Code, rule of thumb feedback information identification code obtains the Experience Feedback information of the control unit.
Realize the historical operation record or historical operation experience or warp to each control unit in nuclear power projects operation process
It tests feedback information quickly to transfer, and is had according to the record of historical operation record or historical operation experience or Experience Feedback information
Effect uses for reference formula management.Breach nuclear power projects Experience Feedback acquisition of information it is slow, using limited bottleneck, filled up nuclear power projects
Domestic and international blank in operating process.Simultaneously as Experience Feedback message identification code includes at least time identification code, Entity recognition
One kind in code, business identification code and value identification code, i.e. multidimensional mark Experience Feedback information, enable Experience Feedback information
It is retrieved rapidly in the database of magnanimity.
Incorporated by reference to referring to Fig. 2, Fig. 2 provides an a kind of implementation of method of nuclear power projects Experience Feedback information search
Example.It specifically includes:
Step 201, nuclear power projects are decomposed according to the work breakdown structure (WBS) WBS pre-established to obtain each control list
Member;
The work breakdown structure (WBS) of nuclear power projects is pre-established, this is to establish the basis for efficiently using Experience Feedback.It is Chinese wide
Eastern nuclear power group has had developed a set of various dimensions WBS decomposed based on power station entity.Meanwhile original Daya Gulf, ridge Australia one
It phase and has been provided at present in the statistics for building the relatively horn of plenty of projects for the workload or job schedule of quantization project
The data of power are supported.Nuclear power projects are using control unit as basic operation object, you can realize the accurate positionin and survey of project process
Amount.
Step 203, the Experience Feedback information for control unit being obtained according to the identification information of the control unit of current operation is known
Other code;
After nuclear power projects are decomposed into control unit, each control unit still has many essential attributes, including control unit
In functions of the equipments coding, device class information, region information, place workshop information, institute's Home System information, belonged to
Purchase package informatin etc..These information can become the identification information of control unit.It, can when operating personnel's operation control unit
To show the identification information of the control unit.
The Experience Feedback message identification code of the control unit can be obtained by the identification information of control unit.
Step 205, the accuracy of Experience Feedback information is set;
The Experience Feedback information of control unit includes the operation note of history, and the content for causing Experience Feedback information is more,
And control unit may have multiple Experience Feedback information, if carrying out single retrieval, may result in the experience being retrieved
Feedback information is more.If setting the accuracy of Experience Feedback information, the quick warp for searching needs can be realized by accuracy
Test feedback information.
Optionally, multiple Experience Feedback information can be ranked up according to priority.It for example, can be according to reference value
Experience Feedback information is ranked up.
Step 207, the Experience Feedback for accuracy being corresponded to according to Experience Feedback message identification code acquisition control unit is believed
Breath;
Step 209, described control unit is operated according to the Experience Feedback information;
The content rule of thumb recorded in feedback information carries out control unit the property used for reference operation.Such as, historical operation flow,
Operation notice etc..
Step 211, the new experience feedback information after this time operation is formed.
After being operated to current control unit, the new experience feedback information after operation is formed, and periodically to Experience Feedback
Information is updated, and e.g., new experience feedback information and the Experience Feedback information formed before can be carried out according to reference value
Rearrangement.
Since Experience Feedback message identification code includes at least time identification code, entity identifier, business identification code and valency
The one kind being worth in identification code, i.e. multidimensional mark Experience Feedback information, enable Experience Feedback information fast in the database of magnanimity
Speed is retrieved.Further, since having carried out sorting out value to Experience Feedback information, the follow-up behaviour of nuclear power projects is greatly facilitated
Make, efficient Experience is provided for subsequent operation.
Fig. 3 provides a kind of schematic diagram of the system of nuclear power projects Experience Feedback information search.Including:
Decomposing module 301, it is each for being decomposed to obtain to nuclear power projects according to the work breakdown structure (WBS) WBS pre-established
Control unit.
The work breakdown structure (WBS) of nuclear power projects is pre-established, this is to establish the basis for efficiently using Experience Feedback.It is Chinese wide
Eastern nuclear power group has had developed a set of various dimensions WBS decomposed based on power station entity.Meanwhile original Daya Gulf, ridge Australia one
It phase and has been provided at present in the statistics for building the relatively horn of plenty of projects for the workload or job schedule of quantization project
The data of power are supported.Decomposing module 301 is decomposed to obtain each according to the work breakdown structure (WBS) WBS pre-established to nuclear power projects
Control unit.Nuclear power projects are using control unit as basic operation object, you can realize the accurate positionin and measurement of project process.
Optionally, decomposing module can be separately provided, and can also be integrated in equipment in systems, for example, can integrate
On progress rate measurement system.
Acquisition module 303 for the identification information of the control unit according to current operation, obtains the warp of described control unit
Test feedback information identification code;
After nuclear power projects are decomposed into control unit, each control unit still has many essential attributes, including control unit
In functions of the equipments coding, device class information, region information, place workshop information, institute's Home System information, belonged to
Purchase package informatin etc..These information can become the identification information of control unit.It, can when operating personnel's operation control unit
To show the identification information of the control unit.
Acquisition module 303, the Experience Feedback information that the control unit can be obtained by the identification information of control unit are known
Other code.
The substance of Experience Feedback information includes:Title, heap-type, unit, time of origin, make a report on unit, make a report at project
People, event description, take measures, the contents such as Experience Feedback and precautionary measures at the analysis of causes, and the requirement of multidimensional labelling technique is in this base
By Experience Feedback information preparation personnel or Experience Feedback administrative staff report is carried out on plinth following classification go forward side by side a step mark and
Specification.
Can by the essential information of Experience Feedback information, as title, heap-type, project, unit, time of origin, make a report on unit,
Reporter, event description, take measures, the empirically feedback information identification code such as Experience Feedback and precautionary measures at the analysis of causes.
Search module 305, for searching for the Experience Feedback of described control unit according to the Experience Feedback message identification code
Information.
Specifically, the entity mapping or activity of the identification information and Experience Feedback message identification code for establishing control unit are reflected
It penetrates, the identification information of operation control unit is wanted by work at present, obtain the Experience Feedback information identification of current control unit
Code, rule of thumb feedback information identification code obtains the Experience Feedback information of the control unit to search module 305.
The system of nuclear power projects Experience Feedback information search in the embodiment of the present invention is realized to nuclear power projects operation
The historical operation record of each control unit or historical operation experience or Experience Feedback information are quickly transferred in journey, and are grasped according to history
It notes down or the record of historical operation experience or Experience Feedback information carries out effective, reference formula management.Breach nuclear power projects warp
Test feedback information obtain it is slow, using limited bottleneck, filled up the domestic and international blank in nuclear power projects operating process.Meanwhile by
It is included at least in Experience Feedback message identification code in time identification code, entity identifier, business identification code and value identification code
One kind, i.e., multidimensional mark Experience Feedback information, Experience Feedback information is enable to be retrieved rapidly in the database of magnanimity.
Incorporated by reference to referring to Fig. 4, Fig. 4 provides a kind of system of nuclear power projects Experience Feedback information search, which includes:
Decomposing module 401, it is each for being decomposed to obtain to nuclear power projects according to the work breakdown structure (WBS) WBS pre-established
Control unit.
Decomposing module 401 decomposes nuclear power projects according to the work breakdown structure (WBS) WBS pre-established to obtain each control
Unit.Nuclear power projects are using control unit as basic operation object, you can realize the accurate positionin and measurement of project process.It is optional
, decomposing module can be separately provided, and can also be integrated in equipment in systems, for example, progress measurement system can be integrated in
On system.
Acquisition module 403 for the identification information of the control unit according to current operation, obtains the warp of described control unit
Test feedback information identification code.
After nuclear power projects are decomposed into control unit, each control unit still has many essential attributes, including control unit
In functions of the equipments coding, device class information, region information, place workshop information, institute's Home System information, belonged to
Purchase package informatin etc..These information can become the identification information of control unit.It, can when operating personnel's operation control unit
To show the identification information of the control unit.
Search module 405, for obtaining the Experience Feedback of described control unit according to the Experience Feedback message identification code
Information.
The system can also include:Setup module 407, sorting module 409, sorting module 411 and update module
413。
Setup module 407, for setting the accuracy of Experience Feedback information;
The Experience Feedback information of described control unit is obtained specifically, according to institute according to the Experience Feedback message identification code
It states Experience Feedback message identification code and obtains the Experience Feedback information that described control unit setup module 407 sets corresponding accuracy.
Sorting module 409, if being two or more for the Experience Feedback information, by the Experience Feedback information according to ginseng
Value is examined to be ranked up;
The Experience Feedback information of control unit includes the operation note of history, and the content for causing Experience Feedback information is more,
And control unit may have multiple Experience Feedback information, if carrying out single retrieval, may result in the experience being retrieved
Feedback information is more.If setting the accuracy of Experience Feedback information, the quick warp for searching needs can be realized by accuracy
Test feedback information.
Optionally, sorting module 409 can be ranked up multiple Experience Feedback information according to priority.For example, can be with
Experience Feedback information is ranked up according to reference value.
Sorting module 411 for being operated according to the Experience Feedback information to described control unit, and forms this time
New experience feedback information after operation.
Update module 413, for being periodically updated to Experience Feedback information, and according to reference value more new sort.
After being operated to current control unit, the new experience feedback information after operation is formed, and periodically to Experience Feedback
Information is updated, and e.g., new experience feedback information and the Experience Feedback information formed before can be carried out according to reference value
Rearrangement.
The system that nuclear power project experiences feedback information is searched in the embodiment of the present invention is by decomposing module 401 according to building in advance
Vertical work breakdown structure (WBS) WBS decomposes nuclear power projects to obtain each control unit, and acquisition module 403 is according to current operation
The identification information of control unit obtains the Experience Feedback message identification code of described control unit;Search module 405 is according to the warp
The Experience Feedback information that feedback information identification code obtains described control unit is tested, finally by management module according to the Experience Feedback
Information is managed described control unit;Final realize in nuclear power projects is managed based on Experience Feedback.Simultaneously as
Sorting out value has been carried out to Experience Feedback information, the subsequent operation of nuclear power projects has been greatly facilitated, is provided for subsequent operation
Efficient Experience, and Experience Feedback information is updated in time, it is that operating personnel can obtain newest Experience Feedback
Information.The implementation and flow of system may refer to the embodiment of the method introduced in previous embodiment, and details are not described herein again.
It can be seen that with reference to more than detailed description of the present invention compared with the prior art, the present invention at least has following
Advantageous effects:Nuclear power projects are decomposed according to the work breakdown structure (WBS) WBS pre-established to obtain each control unit, then
According to the identification information of the control unit of current operation, the Experience Feedback message identification code of current control unit, last root are obtained
The Experience Feedback information of described control unit is obtained according to the Experience Feedback message identification code, and according to the Experience Feedback information
Described control unit is managed.It realizes and the historical operation of each control unit in nuclear power projects operation process is recorded or gone through
History operating experience or Experience Feedback information are quickly transferred, and are believed according to historical operation record or historical operation experience or Experience Feedback
The record of breath carries out effective, reference formula management.Breach nuclear power projects Experience Feedback acquisition of information it is slow, using limited bottleneck,
The domestic and international blank in nuclear power projects operating process is filled up.Simultaneously as Experience Feedback message identification code includes at least the time
One kind in identification code, entity identifier, business identification code and value identification code, i.e. multidimensional mark Experience Feedback information, make
Experience Feedback information can rapidly be retrieved in the database of magnanimity.Further, since Experience Feedback information is worth
Sequence, greatly facilitates the subsequent operation of nuclear power projects, efficient Experience is provided for subsequent operation.
According to above-mentioned principle, the present invention can also carry out the above embodiment appropriate change and modification.Therefore, this hair
It is bright to be not limited to specific embodiment disclosed and described above, some modifications and changes of the present invention should also be as to fall into this
In the scope of the claims of invention.In addition, although some specific terms, these terms are used in this specification
Merely for convenience of description, do not limit the present invention in any way.
Claims (12)
- A kind of 1. method of nuclear power projects Experience Feedback information search, which is characterized in that the described method includes:Nuclear power projects are decomposed according to the work breakdown structure (WBS) WBS pre-established to obtain each control unit;According to the identification information of the control unit of current operation, the Experience Feedback message identification code of described control unit is obtained;The Experience Feedback information of described control unit is searched for according to the Experience Feedback message identification code.
- 2. according to the method described in claim 1, it is characterized in that, the Experience Feedback message identification code is known including at least the time One kind in other code, entity identifier, business identification code and value identification code.
- 3. according to the method described in claim 2, it is characterized in that, the method further includes:The essence of Experience Feedback information is set Exactness, it is described according to the Experience Feedback message identification code obtain described control unit Experience Feedback information specifically, according to The Experience Feedback message identification code obtains the Experience Feedback information that described control unit corresponds to accuracy.
- 4. according to the method described in claim 3, it is characterized in that, the method further includes:If the Experience Feedback information is two or more, the Experience Feedback information is ranked up according to reference value.
- It is 5. according to the method described in claim 4, it is characterized in that, described single to the control according to the Experience Feedback information Member is managed, including:Described control unit is operated according to the Experience Feedback information, and forms the new experience feedback letter after this time operation Breath.
- 6. according to the method described in claim 5, it is characterized in that, the method further includes:Periodically Experience Feedback information is updated, and according to reference value more new sort.
- 7. a kind of system of nuclear power projects Experience Feedback information search, which is characterized in that the system comprises:Decomposing module, for being decomposed to obtain each control list to nuclear power projects according to the work breakdown structure (WBS) WBS pre-established Member;Acquisition module for the identification information of the control unit according to current operation, obtains the Experience Feedback of described control unit Message identification code;Search module, for searching for the Experience Feedback information of described control unit according to the Experience Feedback message identification code.
- 8. system according to claim 7, which is characterized in that the Experience Feedback message identification code that the acquisition module obtains Including at least one kind in time identification code, entity identifier, business identification code and value identification code.
- 9. system according to claim 8, which is characterized in that the system also includes:Setup module, it is described to be obtained according to the Experience Feedback message identification code for setting the accuracy of Experience Feedback information The Experience Feedback information of described control unit according to the Experience Feedback message identification code specifically, obtain described control unit pair Answer the Experience Feedback information of accuracy.
- 10. system according to claim 9, which is characterized in that the system also includes:Sorting module, if being two or more for the Experience Feedback information, by the Experience Feedback information according to reference value It is ranked up.
- 11. system according to claim 9, which is characterized in that the system also includes:Sorting module, for being operated according to the Experience Feedback information to described control unit, and formed this time operation after New experience feedback information.
- 12. the system according to any one of claim 7 to 11, which is characterized in that the system also includes:Update module, for being periodically updated to Experience Feedback information, and according to reference value more new sort.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310140751.9A CN104112235B (en) | 2013-04-22 | 2013-04-22 | The method and system of nuclear power projects Experience Feedback information search |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310140751.9A CN104112235B (en) | 2013-04-22 | 2013-04-22 | The method and system of nuclear power projects Experience Feedback information search |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104112235A CN104112235A (en) | 2014-10-22 |
CN104112235B true CN104112235B (en) | 2018-05-29 |
Family
ID=51709016
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310140751.9A Active CN104112235B (en) | 2013-04-22 | 2013-04-22 | The method and system of nuclear power projects Experience Feedback information search |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104112235B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106022642A (en) * | 2016-06-02 | 2016-10-12 | 国网北京市电力公司 | Power supply service information analyzing method and power supply service information analyzing device |
CN106372108B (en) * | 2016-08-19 | 2020-01-21 | 中广核工程有限公司 | Intelligent pushing method and system for experience feedback data applied to nuclear power design |
CN107798479B (en) * | 2017-11-03 | 2021-03-30 | 苏州热工研究院有限公司 | Knowledge management system based on full life cycle integrated knowledge experience information |
CN109948038B (en) * | 2017-11-24 | 2020-09-15 | 阿里巴巴集团控股有限公司 | Question pushing method and device |
CN110968784B (en) * | 2019-11-26 | 2023-04-07 | 廊坊新奥燃气有限公司 | Experience feedback system and method |
CN114462737B (en) * | 2020-11-09 | 2024-09-10 | 中核核电运行管理有限公司 | Accurate matching method applied to nuclear power plant work order task and operation event report |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101582154A (en) * | 2009-05-21 | 2009-11-18 | 西安建筑科技大学 | Method and device for evaluating greenness of construction parts |
JP2012027724A (en) * | 2010-07-23 | 2012-02-09 | Sony Corp | Information processing unit, information processing method and information processing program |
CN102957721B (en) * | 2011-08-23 | 2017-05-24 | 北京百度网讯科技有限公司 | Device and method for classifying users based on identification information |
CN102622417B (en) * | 2012-02-20 | 2016-08-31 | 北京搜狗信息服务有限公司 | The method and apparatus that information record is ranked up |
-
2013
- 2013-04-22 CN CN201310140751.9A patent/CN104112235B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104112235A (en) | 2014-10-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104112235B (en) | The method and system of nuclear power projects Experience Feedback information search | |
Shou et al. | Lean management framework for improving maintenance operation: Development and application in the oil and gas industry | |
Nicoletti | Lean and automate manufacturing and logistics | |
CN104112174A (en) | Project regulating and controlling method and system of nuclear power plant | |
Abad et al. | A novel separate chance-constrained programming model to design a sustainable medical ventilator supply chain network during the covid-19 pandemic | |
KR100584903B1 (en) | System for real time controlling driving data of power plant | |
CN102289738A (en) | Method for establishing flow network model | |
Fauzan et al. | Information system for asset management | |
Stindt | An environmental management information system for improving reverse logistics decision-making | |
Idrissi Gartoumi et al. | Implementing lean construction to improve quality and megaproject construction: a case study | |
Yuan et al. | Systematic thinking and evaluation of construction quality management standardization of power engineering in China | |
Arsakulasooriya et al. | Applicability of lean maintenance in commercial high-rise buildings: A case study in Sri Lanka | |
Kaganski et al. | Development of key performance selection index model | |
Peñaloza et al. | Safety performance measurement systems based on resilience engineering | |
Guo et al. | Development of bulk material management system and research on material balance applications based on business intelligence | |
Weng et al. | Quality data collection and management technology of aerospace complex product assembly process | |
Pennacchia et al. | New millennium construction sites: an integrated methodology for the sustainability assessment | |
Buglione et al. | Measurement process: improving the ISO 15939 standard | |
Thorne | Towards Lean & Green production management in the pharmaceutical industry: A framework for E-VSM and Kaizen event prioritization through a systematic literature review and case study at AstraZeneca | |
Simon | Evaluating the challenges and benefits associated with resource planning and leveling in the Kenyan Construction Industry | |
Zhang et al. | Digital Twin-Based Three-Dimensional Visual and Global Monitoring of Assembly Shop-Floor | |
Daniels | Analyzing performance in air force facility maintenance and repair | |
Abbas et al. | The adoption of green ICT practices as a driver in supply chain management | |
Smirnova | Mapping GRI indexes to business processes for process mining sustainability analysis: a case study in manufacturing | |
Choudhury | Project management information systems for construction of thermal power plant: A case study with special reference to National Thermal Power Corporation Ltd., India |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |