CN101147951A - Rolling preparation method for thick-walled and thin-bottomed basin parts - Google Patents

Rolling preparation method for thick-walled and thin-bottomed basin parts Download PDF

Info

Publication number
CN101147951A
CN101147951A CNA2007100504893A CN200710050489A CN101147951A CN 101147951 A CN101147951 A CN 101147951A CN A2007100504893 A CNA2007100504893 A CN A2007100504893A CN 200710050489 A CN200710050489 A CN 200710050489A CN 101147951 A CN101147951 A CN 101147951A
Authority
CN
China
Prior art keywords
mould
blank
die
normalizing
die cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007100504893A
Other languages
Chinese (zh)
Other versions
CN100469486C (en
Inventor
张有明
黄志明
李世宽
冯克敏
张孝永
王斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Xinzhu Road and Bridge Machinery Co Ltd
Original Assignee
Chengdu Xinzhu Road and Bridge Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Xinzhu Road and Bridge Machinery Co Ltd filed Critical Chengdu Xinzhu Road and Bridge Machinery Co Ltd
Priority to CNB2007100504893A priority Critical patent/CN100469486C/en
Publication of CN101147951A publication Critical patent/CN101147951A/en
Application granted granted Critical
Publication of CN100469486C publication Critical patent/CN100469486C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forging (AREA)

Abstract

The present invention relates to a forging preparation method of thick-wall thin-bottom basin-like component, and is aimed at salving the problem of that existent forging equipment can not manufacture large-diameter basin-like component. Said forging preparation method includes the following steps: (1), blanking raw material into circular disk blank; (2), placing the circular disk blank into a heating furnace, heating temperature is 1180deg.C-1250deg.C; (3), placing the heated circular disk blank into a mould, forging and forming by utilizing a rotary forging machine; (4), placing the formed component into a normalizing furnace and making soakage and normalizing, normalizing temperature is 890deg.C-950deg.C; and (5), machining the formed component to required component size.

Description

The spreading preparation method of dishware part at the bottom of the thick-walled and thin
Technical field:
The present invention is relevant with forging and molding method, and is especially relevant with the preparation for processing of big shape dishware part.
Background technology:
The external diameter of basin is greater than 600mm at the bottom of the bridge pad, and existing forging equipment is difficult to forge forges base, processes basin at the bottom of the bridge pad if large-scale forging equipment is made in investment, and then investment is very big, the production cost height.As preparing through machining with strand, then stock utilization is low, and the product bad mechanical property can not satisfy the specification requirement of the bridge pad of railway, highway.
Summary of the invention:
The purpose of this invention is to provide a kind of reduced investment, low cost of manufacture, production efficiency height, good product quality, the spreading preparation method of dishware part at the bottom of the high thick-walled and thin of stock utilization.
The present invention is achieved in that
The spreading preparation method of dishware part comprises the steps: at the bottom of the thick-walled and thin of the present invention
(1) the raw material blanking is become discoid blank,
(2) discoid blank being put into the heating furnace heating-up temperature is 1180 ℃-1250 ℃,
(3) the discoid blank after will heating is put into mould, roll milling forming on the swing type rivet bucker,
(4) with drip molding normalizing after the soaking in normalizing furnace, temperature is 890 ℃-950 ℃,
(5) drip molding that is up to the standards is machined into part.
Mould is made up of patrix 10 and counterdie, patrix 10 is connected to form by concentric large and small cylinder, on the die holder 4 of counterdie bosh 11 is arranged, the big disk of the internal diameter of die cavity 7 and patrix 10 movingly, the internal diameter of the external diameter of die cavity 7 and die holder 4 movingly, having heaters 5 between die cavity 7 and the die holder 4, die-cushion 6 are positioned on the base plate of die holder 4, some push rods 1 are positioned at the through hole of base plate, and the sidewall thickness of end basin blank is more than 2 times of bottom wall thickness in the die cavity.
Raw material in the step (1) is a bar, be heated to 1200 ℃-1250 ℃ after its blanking in heating furnace, with forging hammer it is swaged into discoid blank.
Raw material in the step (1) is a plate, is cut to discoid blank.
The upper and lower mould of mould has the metalworking coolant ejiction opening.
The present invention uses the swing type rivet bucker of big pure position to replace traditional forging equipment to make basin at the bottom of the bridge pad first, equipment investment only is the 1/4-1/5 of conventional forging equipment investment, the part internal fiber direction of producing is consistent with the part profile, part metallic gold phase constitution is the same with forging, the mechanical performance height, can work continuously, each production beat only needs 3 minutes.The special mould of the present invention is provided with preheating device and water circulation cooling device, make the preceding shape cavity temperature of beginning rotary forging reach 250 ℃~300 ℃, to reduce the thermal stress of mould, mould when work temperature remain on 350 ℃, mould upper and lower has the metalworking coolant ejiction opening, with the cooling that guarantees die cavity and patrix and lubricated, mould is provided with push rod, can reduce the vexed mould time of workpiece, reduce the heat transfer of workpiece to die cavity, said structure can make every die life reach more than ten thousand.
Waste heat after the utilization of rotary forging drip molding is shaped, normalizing after the normalizing furnace heating, the comprehensive mechanical performance of raising workpiece, but and energy savings.
Description of drawings:
Fig. 1 is a die structure dwg of the present invention.
The specific embodiment:
The bar Metal Cutting is become former plate-like blank, blank is heated to 1230 ℃ in heating furnace, the cake of on 5-10 ton flat-die hammer, upsetting, send into for the second time heating furnace heat to 1200 ℃ while hot, deliver to 12500KN swing type rivet bucker, pendulum roll over to be shaped in mould, deliver to while hot be heated to 900 ℃ in the continous way soaking normalizing furnace after normalizing.Blank after the normalizing is delivered to machining processes processing parts size after the assay was approved.
The die holder 4 of mould is positioned on the backing plate 2, recirculated cooling water groove 11 is arranged on the die holder 4, by the fastening bolt sealing, have through hole to cooperate on the base plate of die holder 4 with push rod 1 by pressing plate 3, die-cushion 6 in push rod 1 and the die cavity 7 contact, is basin blank 9 at the bottom of the bridge pad of processing on the die-cushion 6.Having heaters 5 between die cavity 7 sidewalls and the die holder 4, die cavity 7 is connected by pressing plate 8 usefulness bolts with die holder 4, and patrix 10 and die cavity 7 have the metalworking coolant ejiction opening.Earlier die cavity is preheating to 250 ℃-300 ℃ during use.Hydrologic cycle cooling system makes mold temperature keep 350 ℃, and the cooling fluid ejiction opening is the metalworking coolant of base to the mould graphite spraying, the cooling of assurance mould and lubricated.

Claims (5)

1. the spreading preparation method of dishware part at the bottom of the thick-walled and thin comprises the steps:
(1) the raw material blanking is become discoid blank,
(2) discoid blank is put into heating furnace, heating-up temperature is 1180 ℃-1250 ℃,
(3) the discoid blank after will heating is put into mould, and shape is made in spreading on the swing type rivet bucker,
(4) with drip molding normalizing after the soaking in normalizing furnace, temperature is 890 ℃-950 ℃,
(5) drip molding that is up to the standards is machined into part.
2. method according to claim 1, it is characterized in that mould is made up of patrix (10) and counterdie, patrix (10) is connected to form by with one heart big small column, bosh (11) is arranged on the die holder of counterdie (4), the great circle cylinder of the internal diameter of die cavity (7) and patrix (10) movingly, the internal diameter of the external diameter of die cavity (7) and die holder (4) movingly, having heaters (5) between die cavity (7) and the die holder (4), die-cushion (6) is positioned on the base plate of die holder (4), some push rods (1) are positioned at the through hole of base plate, and the sidewall thickness of end basin blank is more than 2 times of bottom wall thickness in the die cavity.
3. method according to claim 1 is characterized in that the raw material in the step (1) is a bar, be heated to 1200 ℃-1250 ℃ after its blanking in heating furnace, with forging hammer it is swaged into discoid blank.
4. method according to claim 1 and 2 is characterized in that the raw material in the step (1) is a plate, is cut to discoid blank.
5. method according to claim 2 is characterized in that the upper and lower mould of mould has the metalworking coolant ejiction opening.
CNB2007100504893A 2007-11-13 2007-11-13 Rolling preparation method for thick-walled and thin-bottomed basin parts Expired - Fee Related CN100469486C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007100504893A CN100469486C (en) 2007-11-13 2007-11-13 Rolling preparation method for thick-walled and thin-bottomed basin parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007100504893A CN100469486C (en) 2007-11-13 2007-11-13 Rolling preparation method for thick-walled and thin-bottomed basin parts

Publications (2)

Publication Number Publication Date
CN101147951A true CN101147951A (en) 2008-03-26
CN100469486C CN100469486C (en) 2009-03-18

Family

ID=39248715

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007100504893A Expired - Fee Related CN100469486C (en) 2007-11-13 2007-11-13 Rolling preparation method for thick-walled and thin-bottomed basin parts

Country Status (1)

Country Link
CN (1) CN100469486C (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011012070A1 (en) * 2009-07-28 2011-02-03 上海兴浦旋压车轮有限公司 Roll forming method for wheel spoke
CN102941449A (en) * 2012-11-28 2013-02-27 隆昌山川精密焊管有限责任公司 Forming process of thick-wall thin-bottom metal part
CN103028687A (en) * 2013-01-17 2013-04-10 四川新筑精坯锻造有限公司 Swinging and rolling device for non-rotating body and forging process of swinging and rolling device
CN106624652A (en) * 2016-12-27 2017-05-10 北京有色金属研究总院 Rotary forging forming method for metal circular plate
CN106799423A (en) * 2017-01-18 2017-06-06 常州和仕达机械装备制造有限公司 The eccentric building mortion and method of bowl-type thin-wall part
CN108246951A (en) * 2018-03-02 2018-07-06 武汉理工大学 The hot rotary roll method of metal hand casing
CN108393421A (en) * 2018-03-02 2018-08-14 武汉理工大学 Metal hand casing cold drawn section manufacturing process
CN108480539A (en) * 2018-03-02 2018-09-04 武汉理工大学 Metal notebook computer casing rotary roll method
CN109513864A (en) * 2018-12-28 2019-03-26 同共(湖北)精密成形有限公司 Processing mold, processing unit (plant) and its processing method and product
CN109531083A (en) * 2018-12-28 2019-03-29 同共(湖北)精密成形有限公司 A kind of radiator for semiconductor and its processing method
CN109834208A (en) * 2017-11-28 2019-06-04 上海电气上重铸锻有限公司 The top cover forging method of nuclear pressure container
CN110252928A (en) * 2019-08-05 2019-09-20 江苏拢研机械有限公司 End ring cold drawn section mold
CN110918844A (en) * 2019-11-26 2020-03-27 武汉理工大学 Thin-wall multi-ring high-rib component space envelope forming method
CN113714446A (en) * 2021-08-25 2021-11-30 西北工业大学 Axial closed rolling forming device and method for large-diameter-thickness-ratio metal thin circular plate
CN114749876A (en) * 2022-05-20 2022-07-15 北京钢研高纳科技股份有限公司 Ti2Preparation method of large-scale special-shaped casing ring piece made of AlNb alloy

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2720562B2 (en) * 1990-02-14 1998-03-04 住友金属工業株式会社 Method of manufacturing wheels for railway vehicles
JP2819084B2 (en) * 1994-03-16 1998-10-30 株式会社レイズエンジニアリング Rotary forging device and method for manufacturing automobile wheel using the same
CN100467156C (en) * 2007-03-05 2009-03-11 贵州安大航空锻造有限责任公司 Near-isothermal forging method of GH4169 alloy disc-shaped forging in air

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011012070A1 (en) * 2009-07-28 2011-02-03 上海兴浦旋压车轮有限公司 Roll forming method for wheel spoke
US9233413B2 (en) 2009-07-28 2016-01-12 Shanghai Xingpu Spinforming Wheel Co., Ltd. Rolling forming method of wheel disc
CN102941449A (en) * 2012-11-28 2013-02-27 隆昌山川精密焊管有限责任公司 Forming process of thick-wall thin-bottom metal part
CN103028687A (en) * 2013-01-17 2013-04-10 四川新筑精坯锻造有限公司 Swinging and rolling device for non-rotating body and forging process of swinging and rolling device
CN106624652A (en) * 2016-12-27 2017-05-10 北京有色金属研究总院 Rotary forging forming method for metal circular plate
CN106799423B (en) * 2017-01-18 2019-03-22 常州和仕达机械装备制造有限公司 The eccentric forming device and method of bowl-type thin-wall part
CN106799423A (en) * 2017-01-18 2017-06-06 常州和仕达机械装备制造有限公司 The eccentric building mortion and method of bowl-type thin-wall part
CN109834208B (en) * 2017-11-28 2020-10-16 上海电气上重铸锻有限公司 Top cover forging method of nuclear power pressure vessel
CN109834208A (en) * 2017-11-28 2019-06-04 上海电气上重铸锻有限公司 The top cover forging method of nuclear pressure container
CN108246951A (en) * 2018-03-02 2018-07-06 武汉理工大学 The hot rotary roll method of metal hand casing
CN108393421A (en) * 2018-03-02 2018-08-14 武汉理工大学 Metal hand casing cold drawn section manufacturing process
CN108480539A (en) * 2018-03-02 2018-09-04 武汉理工大学 Metal notebook computer casing rotary roll method
CN108246951B (en) * 2018-03-02 2019-10-25 武汉理工大学 The hot rotary roll method of metal hand casing
CN109513864A (en) * 2018-12-28 2019-03-26 同共(湖北)精密成形有限公司 Processing mold, processing unit (plant) and its processing method and product
CN109531083A (en) * 2018-12-28 2019-03-29 同共(湖北)精密成形有限公司 A kind of radiator for semiconductor and its processing method
CN109531083B (en) * 2018-12-28 2020-11-24 同共(湖北)精密成形有限公司 Semiconductor radiator and processing method thereof
CN109513864B (en) * 2018-12-28 2024-02-06 同共(湖北)精密成形有限公司 Processing die, processing device, processing method and product thereof
CN110252928A (en) * 2019-08-05 2019-09-20 江苏拢研机械有限公司 End ring cold drawn section mold
CN110918844A (en) * 2019-11-26 2020-03-27 武汉理工大学 Thin-wall multi-ring high-rib component space envelope forming method
CN110918844B (en) * 2019-11-26 2020-12-08 武汉理工大学 Thin-wall multi-ring high-rib component space envelope forming method
CN113714446A (en) * 2021-08-25 2021-11-30 西北工业大学 Axial closed rolling forming device and method for large-diameter-thickness-ratio metal thin circular plate
CN114749876A (en) * 2022-05-20 2022-07-15 北京钢研高纳科技股份有限公司 Ti2Preparation method of large-scale special-shaped casing ring piece made of AlNb alloy

Also Published As

Publication number Publication date
CN100469486C (en) 2009-03-18

Similar Documents

Publication Publication Date Title
CN100469486C (en) Rolling preparation method for thick-walled and thin-bottomed basin parts
CN101214510B (en) Blind hole internal gear precision forming method and internal tooth forming mold
CN103831386B (en) A kind of production method of brake disc of high-speed train and forging mold
CN102172815B (en) Hot extrusion forming method for inner hexagonal bolt blank of titanium alloy
CN103706743B (en) Die-forging forming process of titanium-alloy forged drum piece
CN101422861A (en) Precision forming method for special-shaped deep hole parts
CN106363352A (en) Manufacturing process of high-strength aluminum alloy ring forge
CN107321900B (en) A kind of GH4169 alloy disc die-forging of forge pieces forming method
CN101920442B (en) Process for coldly extruding, reducing and pressing bit body and hard alloy head
CN104191181A (en) Magnesium alloy wheel forging-spinning composite forming method
CN104139279A (en) Manufacturing process for inner-trapezoid-groove ring piece
CN103230955A (en) Hot extrusion forming die of light alloy horn-shaped pipe fitting
CN112621141A (en) Forging production process for large blade of steam turbine
CN103769825A (en) Planet carrier for automobile and cold-forging forming process thereof
CN109454198A (en) The method for forging and molding and its triple gear of a kind of triple gear and application
CN1544181A (en) Composite fabrication process for tooth blank of automobile gear shifting box combining tooth
CN1442250A (en) Processing technology of ring shaped parts
CN101549459B (en) Manufacturing technology of individual hydraulic prop piston
CN105921671A (en) Backward extrusion forming method of stepped hollow shaft part and die
CN209238948U (en) A kind of raw steel forging apparatus
CN103230951A (en) Hot extrusion forming method of light alloy horn-shaped pipe fitting
CN201950150U (en) Ball pin thermal extrusion die
CN206550284U (en) Out star wheel used for vehicle transmission shaft, interior star-wheel blank forging equipment
CN202264067U (en) Production device for connecting rod
CN106180531B (en) A kind of half-shaft blank hydraulic press forging system and processing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090318