Grunt task to extract Above the Fold CSS from a URL
-
Updated
Aug 12, 2015 - JavaScript
Grunt task to extract Above the Fold CSS from a URL
Practicing website optimization by analyzing the critical render path, identifying code bottlenecks with Chrome Dev Tools, and minifying website assets.
System that finds the critical path of the graph of the disciplines of the Computer Science course at UnB (University of Brasília).
Udacity: Front End Web Development Project - "Website Optimization"
Graphical Java application using implementation of critical path analysis for optimal day planning.
Finding critical path on large graph using Bellman-Ford algorithm with parallel implementations
Algorithm implementation for critical path in c++ and javascript
Critical is the the very essential to be known not to be done
Offline-first PWA card game
Enumeration of all Permutations (Recursion, Single Swap, and in Lexicographic Order), and Combinations. Enumeration of all Topological Orderings on a Directed Graph. Enumeration of all Paths in a connected Graph. Evaluates Critical Path using PERT Algorithm.
Finds the critical path in the network and also displays the EST, EFT, LST, LFT and slack time for each activity.
Java application designed to solve the Critical Path Method (CPM) problem.
MATLAB implementation of all the Operations Research algorithms and problems solved by me.
Simple calculator for finding the critical path through CPM and PERT
Projeto desenvolvido como parte do curso Performance Web da escola Alura, ministrado pelo instrutor Sergio Lopes.
Program for selecting vertices that have a sign of implicit transition
Detects Above the Fold styles on sites and assembles a stylesheet of them.
Estimation tools set.
The easiest way to achieve critical path CSS
Inline critical CSS in HTML page using Puppeteer and Critical-css-parser
Add a description, image, and links to the critical-path topic page so that developers can more easily learn about it.
To associate your repository with the critical-path topic, visit your repo's landing page and select "manage topics."