Skip to content

Latest commit

 

History

History
107 lines (90 loc) · 6.87 KB

03.md

File metadata and controls

107 lines (90 loc) · 6.87 KB

Agenda for the 57th meeting of Ecma TC39

  • Host: Mozilla/Tilde, Portland, OR
  • Dates: 21-23 March 2017
  • Times:
    • 10:00 to 17:00 PDT on 21 and 22 of March 2017
    • 10:00 to 16:00 PDT on 23 of March 2017
  • Location: The Leftbank Annex 101 North Weidler Street Portland, OR 97227, USA
  • Wifi: Will be available (information given upon arrival)
  • Dinner: TBD
  • Contact: TBD

Logistics

TBD

Allen's paper on standards committee participation for new attendees: http:https://wirfs-brock.com/allen/files/papers/standpats-asianplop2016.pdf

Registration

Doodle

Hotels

TBD

Agenda items

  1. Opening, welcome and roll call
    1. Opening of the meeting (Mr. Wirfs-Brock)
    2. Introduction of attendees
    3. Host facilities, local logistics
  2. Find volunteers for note taking
  3. Adoption of the agenda
  4. Approval of the minutes from last meeting (review draft)
  5. Report from the Ecma Secretariat (15m)
  6. ECMA262 Status Updates (15m)
    1. Review any new or open issue with ECMA-262 2017
    2. Vote to accept ECMA-262 2017 final draft and forward it to Ecma GA (approval subject to completion of RF opt-out period with no opt-outs)
  7. ECMA402 Status Updates (15m)
    1. Review any new or open issue with ECMA-402 2017
    2. Vote to accept ECMA-402 2017 final draft and forward it to Ecma GA (approval subject to completion of RF opt-out period with no opt-outs)
  8. Test262 Status Updates (15m)
    1. Automate deployment is on the way. We need an email acc for management.
    2. Good progress in >100 issues and PRs in the last month.
    3. We have tests for Object rest/spread properties.
    4. Approve TR-104 draft and forward it to ECMA GA. PDF link
  9. Timeboxed overflow from previous meeting
    1. 15 Minute Items
    2. 30 Minute Items
    3. 45 Minute Items
    4. 60 Minute Items
    5. Timebox Not Yet Selected (champion, please select one)
  10. Timeboxed agenda items
    1. 15 Minute Items
      1. Template Literals Revision for Stage 4 (Tim Disney)
      2. RegExp Lookbehind Assertions for Stage 3 (Daniel Ehrenberg, Brian Terlson) (slides)
      3. RegExp Unicode Property Escapes for Stage 3 (Daniel Ehrenberg, Brian Terlson) (slides)
      4. RegExp dotAll Flag for Stage 2 (Brian Terlson, Mathias Bynens)
      5. RegExp Legacy Features for Stage 3 (Mark S. Miller, by Claude Pache)
      6. SIMD.js status update (Daniel Ehrenberg)
      7. ECMA402 Presentation of the three formatters for stage 2 (Zibi Braniecki) (slides)
      8. Intl.Segmenter for requesting Stage 3 reviewers (Daniel Ehrenberg, Leo Balter) (slides)
      9. Test262: using root license as default for files (Leo Balter)
      10. Weak References status update (Dean Tribble)
    2. 30 Minute Items
      1. Dynamic Module Reform for Stage 2 (Caridy Patiño, Dave Herman) (slides)
      2. RegExp Named Groups for Stage 3 (Daniel Ehrenberg, Brian Terlson) (slides).
      3. Realms update (Dave Herman, Caridy Patiño) (slides)
    3. 45 Minute Items
      1. Orthogonal Class Member Syntax for Stage 1 (Mark Miller, Allen Wirfs-Brock)
    4. 60 Minute Items
      1. Arbitrary precision integer type for Stage 2 (Daniel Ehrenberg, Adam Klein) (slides)
      2. Review the Code of Conduct Proposal (30mins) and define the Enforcement Subcommittee (Leo Balter)
  11. Non-timeboxed overflow from previous meeting
  12. Non-timeboxed agenda items
    1. Web compatibility issues / Needs-consensus PRs
    2. Stage 0+ proposals looking to advance
      1. Date Proposal - NodaTime as a built-in Module for Stage 1 (Maggie Pint, Brian Terlson)Slides
    3. New proposals
    4. Discussion and updates for Stage 0+ Proposals
  13. Overflow from timeboxed discussion items (in insertion order)
  14. Closure

Agenda Topic Rules

  1. Proposals looking to advance must be added to the agenda along with necessary review materials 7 days prior to the first day of the meeting.
  2. Timeboxed topics may be 15, 30, 45, or 60 minutes in length.

Schedule constraints

Dates and locations of future meetings

Dates Location Host
2017-05-23 to 2017-05-25 New York, NY Google
2017-07-25 to 2017-07-27 Redmond, WA Microsoft
2017-09-26 to 2017-09-28 Boston, MA Bocoup
2017-11-28 to 2017-11-30 San Francisco, CA Airbnb